Characteristics Evaluation of Non Point Source Treatment Facilities in Construction Site (건설 현장 내 비점오염원 처리 시설의 제거 특성 평가)

  • Choi, Younghoa;Jeong, Seolhwa;Kim, Changryong;Kim, Hyosang;Oh, Jihyun
    • Journal of the Korean GEO-environmental Society
    • /
    • v.10 no.3
    • /
    • pp.53-62
    • /
    • 2009
  • This study was conducted to investigate characteristics of the non-point source pollution under construction and evaluate available pollution control methods. Suspended solid loading is high when soil disturbs by rainfall and this phenomenon is much more severe at the initial stage of construction than at the final one. There are three methods available for erosion and sediment control, which are check dam, silt fence, and geotextile. Check dam and silt fence are for control of suspense solids and geotextile is for preventing soil erosion during rainfall. They can be installed as temporary control facilities at construction sites. From the comparison of those methods, it was found that geotextile method was the most efficient for the runoff control of non-point source pollution. Check dam and silt fence can remove suspense solids by pore spaces to some degree, but the removal of pollutants mainly occurs through sedimentation. Because the temporary control facilities have limited removal efficiency of pollutant, they often cause civil claims and contamination of water environment. Hence, using a pressurized filtration system along with temporary control facilities, highly enhanced treatment efficiency was anticipated. In addition, the loading capacity of these techniques depends on filtration velocity and input loading. And their pre-treatments are necessary for efficient operation.

  • PDF

Characteristics of Stormwater Treatment in Construction Site (건설 현장 내 비점오염원 처리 특성 평가)

  • Choi, Younghoa;Kim, Changryong;Kim, Hyosang;Oh, Jihyun;Jeong, Soelhwa
    • Journal of the Korean GEO-environmental Society
    • /
    • v.11 no.6
    • /
    • pp.69-75
    • /
    • 2010
  • Total suspendid solid (TSS) of non point source pollutants in construction site are in higher concentration than others (BOD, COD etc). Also, the TSS concentration is very sensitive to the rainfall intensity in early stage of construction. There are two methods for treatment of non point source pollutants, which are temporary treatment facility and filtering one. But they have disadvantages. Temporary facility system has very low efficiency and filtering system consumes high energy and takes up large footprint. This study shows how prefabricated flocculation/coagulation system is developped to cover the above weakness and evaluation of the system performance in construction site. The prefabricated flocculation/coagulation system has very high treatment efficiency comparing with temporary and filtering system and takes small footprint. Therefore, it expects that the system leads to prevention of pollution near construction site and reduction of public grievance. Proper coagulant dosage and sludge circulation facility application, controlling the height of sludge interfacial are necessary to maximize the system efficiency.