• Title/Summary/Keyword: 침매터널

Search Result 41, Processing Time 0.022 seconds

Case study of immersed tunnel for preservation of ecological environment (생태환경 보존을 위한 침매터널 사례연구)

  • Ahn, Sung Kwon;Lee, Hee Up
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.6
    • /
    • pp.679-697
    • /
    • 2022
  • Having an awareness of the ongoing conception of Honam-Jeju, Korea-Japan, and Korea-China subsea tunnels for accommodating the railway, this paper investigates immersion tube tunnel technology, one of the underwater tunnel construction methods. This paper analyses the current status of immersed tube tunnels according to their location and function. This paper summarises the dredging methods and briefly introduces the muck disposal facility. Also introduced are the case studies where measures were taken to mitigate the impact of dredging on the surrounding marine environment. This paper also explains how the tunnel elements are connected underwater using an immersion joint. This paper classifies the foundation methods into bedding and ground improvement methods and provides summaries, including their environmental impact associated with drill cuttings and cementitious binders.

An Experiment Study on Performance Evaluation of the Video Incident Detection System (영상유고감지기 성능평가를 위한 실험적 연구)

  • Yoo, Yong-Ho;Kweon, Oh-Sang;Yoo, Ji-Oh;Hwang, Byoung-Chul
    • Proceedings of the Korea Institute of Fire Science and Engineering Conference
    • /
    • 2010.10a
    • /
    • pp.155-158
    • /
    • 2010
  • 본 연구에서는 최근 도심지 대심도 지하도로 및 침매터널등에서 중요성이 부각되고 있는 터널내 화재안전 설계를 위한 영상유고감지시스템의 성능평가를 수행하였다. 영상유고감지시스템(VIDS)의 성능 평가를 위하여 터널 내부에서 발생할 수 있는 유고상황을 5가지로 구분하여 보행자, 낙하물, 정지차량, 역주행, 연기발생등의 상황을 인위적으로 발생시켰으며 이에 따른 감지 능력을 평가하였다. 실험결과 2, 3회 걸친 지속적인 교정과 세부조정을 거친 후에는 보행자 98.3%, 낙하물 96.7%, 정지차량 100%, 역주행 100%, 연기감지 100%의 감지율을 나타내었으며 카메라의 설치거리 100m 이내에서 비교적 높은 감지율을 나타내었다. 영상유고감지기의 적용 신뢰도는 터널내 조도, 카메라의 설치 위치에 따른 영상 변화등에 의존적이었으나 대심도 터널등의 신속한 화재감지를 위한 대안으로 적용될 수 있을 것으로 판단되었다.

  • PDF

A Case Study of Nitrox Usage in Diving Operation of the Busan-Geoje Fixed Link Immersed Tunnel (거가대교 침매터널 잠수작업에서의 나이트록스 사용 사례 분석)

  • Woo, Dae-Hee;Kang, Sin-Young;Lee, Min-Gu
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.21 no.6
    • /
    • pp.790-797
    • /
    • 2015
  • This study tried to evaluate the safety and economical benefit of Nitrox-diving by comparing with Air diving. We used actual diving data which was recorded in construction site of the Busan-Geoje fixed link immersed tunnel in 2010. The study method was to assort and analyze the diving data by divers, depth, breathing air, and diving table. Furthermore, the study examined the possibility of outbreak decompression sickness by comparing Nitrox diving and Air diving in no-decompression limit time, decompression time, working time. As a result, this study confirms that if certain diver breathe Nitrox for diving and oxygen for decompression, not only the risk of decompression sickness could be minimized, but also duration of decompression could be shortened. Moreover, it was estimated that a remarkable difference(more than 3 times) between actual duration of underwater construction period and virtual construction period by using air. As a result, the study confirmed that Nitrox diving is more efficient and economical than Air diving in physically limited and hazardous diving environment.

Safe Navigation Plan for Dredging Operations to build Sunken Tunnel for Access Road between Busan-Geoje (부산-거제간 연결도로 침매터널공사의 준설작업에 따른 안전통항방안)

  • Kim, Jung-Hoon;Gug, Seung-Gi
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • v.1
    • /
    • pp.509-514
    • /
    • 2006
  • This research does by purpose that present safe navigation plan for ships during doing dredging construction with dredger crossing waterway of Gadeok. Dredging operations need to build sunken tunnel that cross the bottom of the sea under waterway of Gadeok for access road construction between Busan- Geoje. Accordingly, dredger must cross and dredge waterway of Gadeok fatally. There is possibility of marine accident of collision for latent danger situation of ships to navigate waterway of Gadeok relatively. Therefore, safe navigation plan of ship is groped in reply and its countermeasure is presented.

  • PDF

Design of the Busan-Geoje Fixed Links Immersed tunnel (기획특집 - 거가대교 침매터널의 설계)

  • Lee, Jung-Sang
    • Journal of the Korean Professional Engineers Association
    • /
    • v.43 no.2
    • /
    • pp.30-33
    • /
    • 2010
  • Immersed tunnel had been a rather new term in Korea before Busan-Geoje fixed link project was started and became known through the media. Although Korean is unfamiliar with the immersed tunnel, this construction method has a long history in the world. Busan-Geoje Fixed Link immersed tunnel consist of 18 elements and each element is approximately 180m long. These tunnel elements are prefabricated of reinforced concrete in a temporary dry dock and are towed to the site and lowered into final position in a dredged trench and are placed on a screeded gravel bed directly without temporary support.

  • PDF

침매 터널 방재설비 기술

  • Kim, Du-Ho;Jo, Hyeong-Je;Gu, Im-Sik;Kim, Chang-Hwan
    • The Magazine of the Society of Air-Conditioning and Refrigerating Engineers of Korea
    • /
    • v.37 no.4
    • /
    • pp.32-40
    • /
    • 2008
  • PDF

Safe Navigation Plan for Dredging Operations to build Sunken Tunnel for Access Road between Busan-Geoje (부산-거제간 연결도로 침매터널공사의 준설작업에 따른 안전통항방안)

  • Kim, Jung-Hoon;Gug, Seung-Gi
    • Journal of Navigation and Port Research
    • /
    • v.30 no.10 s.116
    • /
    • pp.825-831
    • /
    • 2006
  • This research does by purpose that present safe navigation plan for ships during doing dredging construction with dredger crossing waterway of Gadeok Dredging operations need to build sunken tunnel that cross the bottom of the sea under waterway of Gadeok for access road construction between Busan- Geoje. Accordingly, dredger must cross and dredge waterway of Gadeok fatally. There is possibility of marine accident of collision for latent danger situation of ships to navigate waterway of Gadeok relatively. Therefore, safe navigation plan of ship is groped in reply and its countermeasure is presented. Firstly, navigating traffic in daytime was forecasted less than 20% of its maximum capacity through estimating the traffic volume and traffic congestion The proposal was presented to execute dredging operations in three-step and to establish temporary waterway after reviewing waterway design principles. The role of VTS center was emphasized in the new Busan Port, lastly.

Evaluation of fire-proofing performance of reinforced concrete tunnel lining coated by newly developed material (신개발 내화재료에 피복된 철근콘크리트 터널라이닝의 내화성능평가)

  • Park, Hae-Genn;Kim, Jang-Ho Jay
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.10 no.4
    • /
    • pp.329-336
    • /
    • 2008
  • Efficient traffic network is required in urban area for good living condition. However, dense traffic network creates traffic jam and gives bad influences to the ground environment. Therefore, advanced use of underground and tunnel is required. But, in the last 20 years many tunnel fire accidents have occurred all over the world. Increase of tunnels and increase of traffics result in increase of tunnel fire. Tunnel fire creates damage to people and to the tunnel structure. Also, tunnel fire creates a big economical loss. In a mountain tunnel, the stability of the tunnel will not be disturbed by fire although the tunnel lining will get a severe damage. However, in a shield tunnel or immersed tube tunnel, cut and cover tunnel, there is a high possibility that tunnel itself will collapse by fire because their tunnel concrete lining is designed as a structural member. The aim of this experimental research is to verify the fire protection performance of newly developed cementitious material compared with the broadly used existing products in Europe and Japan. For the experiments, the general NATM tunnel concrete linings with the newly developed material were tested using fire loading curve of RABT (Maximum peak temperature is $1,200^{\circ}C$) and RWS (Maximum peak temperature is $1,350^{\circ}C$). From the test results, the newly developed fire protection material applied with 30 mm thickness showed good fire-proofing performance under RABT fire loading.

  • PDF