• Title/Summary/Keyword: 치수사업

Search Result 251, Processing Time 0.025 seconds

Economic Analysis of Floodplain Forecast using GIS and MD-FDA (GIS와 MD-FDA를 연계한 예상침수지역의 경제성 분석)

  • Choi, Hyun;Ahn, Chang-Hwan
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.25 no.6_2
    • /
    • pp.599-611
    • /
    • 2007
  • Among natural disasters that lead to devastating damage, floods from heavy rains have been causing hundreds of victims and a great loss of their properties every year. Basically, there is no other way to deal with the problem considering the characteristics of natural disaster, but more specific studies for a preventive measure of flood has been in progress so far. However, the controversy over the problem is going on due to the objection of some environmental organizations or some economic reasons. The key point is to select the most likely area for a preventive measure of floods where a huge amount of the national budget is put into it. This is the factor which judges whether it would be a success or failure. This study aims to provide some basic data for deciding the priority order in a disaster preventing plan by drawing more potential damage areas from the connection with GIS and using them into the economic analysis for flood prevention industries.

치산치수는 국가만년의 대계-민족의 젖줄 대소하천의 효용를 본다

  • Choe, Yeong-Park
    • The Science & Technology
    • /
    • v.5 no.12 s.43
    • /
    • pp.25-31
    • /
    • 1972
  • 대소의 하천은 민족의 젖줄이다. 우리는 이 젖줄에서 자라났고 앞으로 우리들의 후손들도 이 젖줄에서 자라날 것이다. 치수사업효과로는 대체로 그 사업이 실시되지 않는 경우에 생길 수 있는 홍수방지효과 즉 국토보전편익효과와 사업이 실시되지 않는 경우보다 더 고도의 토지이용을 가능케 하는 토지이용고도화 효과의 두 효과를 생각할 수 있다.

  • PDF

Study on River Management Plan Considering Ecological Preservation and Flood Control of Riverine Wetland (하도습지의 생태보전 및 치수를 고려한 하천관리 방안 연구)

  • Ann, Byoung-Yun;Kim, Taek-Min;Hong, Seung-Jin;Kim, Gil-Ho;Kim, Soo-Jun;Kim, Jae-Geun;Kim, Hung-Soo
    • Journal of Wetlands Research
    • /
    • v.16 no.4
    • /
    • pp.463-476
    • /
    • 2014
  • The riverine wetlands located in the riverside bring about social conflicts through confrontation between flood control value through flood control project and ecological preservation value of riverine wetland. In this study, we identified the importance of both values through analysis of economic feasibility of flood control and ecological values of riverine wetland, and tried to suggest management plans for riverine wetland considering both of flood control safety and ecological preservation through these results. For this, we calculated the expected annual flood damage of Imjin River using the multi-dimensional flood damage analysis(MD-FDA), and calculated the total value of riverine wetland using the contingent valuation method(CVM) to estimate preservation value of riverine wetland. The result of the analysis shows that the Imjin River needs flood control project and the ecological preservation of riverine wetland is also important. Therefore, the establishment of the management plan for protecting riverine wetland is also needed. As a result, the Imjin riverine wetland was classified as the area where sedimentation continues to take place, and the flood water level to rise. On the basis of the analyzed results, it is judged that the Imjin River needs flood control for public safety and ecological consideration for ecosystem preservation in the river improvement project. So, the stepwise river improvement is desirable to protect riverine wetland and minimize ecosystem disturbance. The results is expected to be made good use as the basic study for establishment of institutional river management plans considering flood control project and riverine wetland preservation in the future.

Location Benefit Analysis According to Flood Safety Increase (치수안전도 향상에 따른 자산이용고도화 효과 분석)

  • Lee, Jin Ouk;Choi, Seung An;Kim, Hung Soo;Shim, Myung Phil
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2004.05b
    • /
    • pp.777-783
    • /
    • 2004
  • 하천 세내지 주변은 급속한 시가지 조성과 인구밀집으로 유역의 불투수층이 증가하여 홍수도달시간이 짧아지고 홍수유출량이 증가하고 있다. 또한 엘리뇨${\cdot}$라니냐 등의 이상기후로 홍수사상의 발생 빈도와 규모가 증가하면서 홍수피해도 대형화되어 가고 있다. 그러나 치수사업은 다른 공공사업에 비해 경제성이 저평가 되어 투자우선순위가 밀려 사업시행이 지연되고 예방적 차원의 대책도 미흡하여 피해가 증가하는 악순환이 계속되고 있다. 따라서 본 인구에서는 우리나라의 치수경제성 분석에 있어 계량화하지 못하고 있는 자산이용고도화 효과를 치수안전도와 더불어 분석하고자 한다. 자산이용고도화는 치수사업 시행으로 해당지역의 치수안전도 향상에 따른 자산가치의 상승을 말하는데, 특정지역의 자산가치를 가장 객관적으로 표현할 수 있는 공시지가를 근거로 분석을 수행하였다. 치수사업 시행으로 인한 편익과 하천 특성에 따른 지가변동률의 차이가 통계적으로 유의성이 있는지를 분산분석을 통해 검증하였으면, 자산가치의 상승을 순수 연평균지가변동률로 나타내었다. 치수안전도는 홍수피해 잠재성과 홍수방어능력으로 구분하였는데 홍수피해 잠재성은 도시화율에 따라 구분하였고, 홍수방어능력은 홍수량의 빈도해석과 불확실성을 고려하여 조건부 비초과확률로 나타내었다. 본 연구에서는 소도시 지역(경안천, 복하천, 청미천)을 대상으로 200년 빈도의 홍수사상에 내해 10년, 50년 설계빈도로 건설된 제방의 조건부 비초과확률을 산정하여 지가변동률의 추이를 비교 분석하였다. 분석 결과, 소도시 지역에서는 조건부 비초과확률이 $10\%$ 상승했을 때 순수 연평균지가변동률이 5배정도 상승함을 알 수 있었다.다시 입력자료로 사용하는 업데이트 방식을 사용하기 때문에 예측결과의 오차가 완전하게 보정되지 않으면 다음 결과에 역시 오차를 주게 되어 오차보정이 상당히 중요하다는 것을 알 수 있었다. 오차를 보다 효과적으로 보정하기 위해서는 퍼지제어에 사용되는 퍼지규칙의 수를 늘리고, 유입량에 직접적인 영향을 주는 강우량과 연계한 2변수의 Fuzzy-Grey 모형을 이용한다면 보다 정확한 유입량 예측이 가능할 것으로 사료된다.이 작은 오차를 발생하였으며, 전체적으로 퍼프 모형이 입자모형보다는 훨씬 적은 수의 계산을 통해서도 작은 오차를 나타낼 수 있다는 것을 알 수 있었다. 그러나 Gaussian 분포를 갖는 퍼프모형은 전단흐름에서의 긴 유선형 농도분포를 모의할 수 없었고, 이에 관한 오차는 전단계수가 증가함에 따라 비선형적으로 증가하였다. 향후, 보다 다양한 흐름영역에서 장${\cdot}$단점 분석 및 오차해석을 수행한 후에 각각의 Lagrangian 모형의 장점만을 갖는 모형결합 방법을 제시할 수 있을 것으로 판단된다.mm/$m^{2}$로 감소한 소견을 보였다. 승모판 성형술은 전 승모판엽 탈출증이 있는 두 환아에서 동시에 시행하였다. 수술 후 1년 내 시행한 심초음파에서 모든 환아에서 단지 경등도 이하의 승모판 폐쇄 부전 소견을 보였다. 수술 후 조기 사망은 없었으며, 합병증으로는 유미흉이 한 명에서 있었다. 술 후 10개월째 허혈성 확장성 심근증이 호전되지 않아 Dor 술식을 시행한 후 사망한 예를 제외한 나머지 6명은 특이 증상 없이 정상 생활 중이다 결론: 좌관상동맥 페동맥이상 기시증은 드물기는 하나, 영유아기에 심근경색 및 허혈성 심근증 또는 선천성 승모

  • PDF

Development of Web-GIS Pilot System for Supporting the Management of River Improvement Works (하천치수사업 관리를 위한 Web GIS 시범시스템 개발)

  • Choi, Hyun-Sang;Koo, Jee-Hee;Jang, Sung-Hyun
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.12 no.4 s.31
    • /
    • pp.21-26
    • /
    • 2004
  • Annually repeated flood damage is bringing about the rapid increasement of the loss of human lives and properly, and the enormous social cost for the restoration work is required. The annual amount of flood damage caused by the abnormal climate is reached about 1% of GDP, so more effective management of the flood control operation is needed to prevent the repetitive flood occurred same region. Also, the systematic planning and management or river improvement works are keenly required for the more effective execution of government working budget that expense to recover or to prevent the flood damage. The several organizations of government - Ministry of Construction & Transportation, Ministry of Government Administration and Home Affair, Ministry of Agriculture and Forestry, Ministry of Environment, Ministry of Science & Technology, Korea Meteorological Adminstration and so on - are promoting the flood prevention operations, but those promotion system makes it difficult to maintain the consistency of works. In this study, we try to develop the Web-GIS system prototype that will be able to effectively manage the nationwide river improvement works and to establish a framework that will be able to maintain the consistency of river improvement works. To achieve the study goals, we analysed current system of flood prevention operations, gathered related documents, had interviews with many government employees, and developed the Web-GIS system prototype.

  • PDF

Alternatives Development for Basin-wide Flood Mitigation Planning: A Case Study of Yeongsan River Basin (유역치수계획을 위한 대안수립: 영산강 유역의 사례연구)

  • Yi, Choong-Sung;Shim, Myung-Pil;Lee, Sang-Won
    • Journal of Korea Water Resources Association
    • /
    • v.43 no.6
    • /
    • pp.507-516
    • /
    • 2010
  • The purpose of this study is to propose the alternative development method by means of determining the optimal project size from the economic viewpoint, improving the existing method depending on engineering aspects. To this end, this study defined the flood mitigation projects as the production activities carried out by inputs and outputs, and proposed the alternative development method on the basis of optimizing input and output combinations. This paper, as the case study of the proposed method, developed alternatives for the flood mitigation planning of Youngsan River Basin by determining the optimal project scale. As the result of determining optimal project size, the net benefit of the optimal alternative tended to be dependent on the net benefits of the large individual proposals. Due to such problem, the effect of relatively small individual proposals are underestimated and possibly be excluded from the optimal alternative, which may result in exclusion of the potential damaged regions protected by them from the flood mitigation project. Thus for the selective flood protection by region, individual proposals need to be categorized into the global measures and local measures according to the flood protection area.

Analysis of the Effects of the Flood Control in the Nakdong Rivers Restoration Project According to Movable Weir Operating (가동보 운영에 따른 낙동강 살리기 사업의 홍수위 조절 효과 분석)

  • Kim, Su-Jin;Kim, Min-Ji;Jun, Kyung-Soo
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2011.05a
    • /
    • pp.152-152
    • /
    • 2011
  • 낙동강 살리기 사업의 결과 낙동강 본류 내에는 총 8개의 다기능 보가 설치된다. 각각의 보는 고정보와 가동보 복합형식의 다기능 보로서 보 상류의 수위가 일정하게 유지되도록 하여 하천 내의 수자원을 확보하는데 그 목적이 있다. 하지만 보의 설치 시 홍수로 인한 수해 발생의 위험이 높아지므로 다기능 보의 건설에 있어 치수안정성은 중요하게 고려해야 할 부분이다. 따라서 각각의 보에서의 치수안정성 확보를 위해서는 낙동강 사업 완료 후 적절한 가동보의 운영이 필요하다. 본 연구에서는 치수안정성이 확보되면서도 과도한 방류로 인한 수자원의 손실을 예방할 수 있는 적절한 가동보 운영에 대한 연구를 실시하고자 하였다. 이를 위해 낙동강 하구둑부터 반변천 합류점까지의 구간을 선정하여 낙동강 살리기 사업 후의 부정류 모형을 구성하고 홍수 모의를 실시하였다. 모형을 구성할 때에 가동보의 운영을 위한 기준은 보 상류의 수위로 선정하였다. 이는 치수안정성 및 하천 내 유량의 증감을 직접적으로 확인할 수 있는 지표가 수위라 판단하였기 때문이다. 따라서 각각의 보에서의 상류 수위를 가동보 운영의 기준으로 설정하여 가동보의 운영 조건을 결정하고 모형을 구성하였다. 가동보의 적절한 운영 기준을 찾기 위해 보 상류 수위의 상승에 따른 가동보의 개방정도를 다양한 조건으로 구성하고 각각의 모형에 동일한 홍수사상을 적용하여 홍수 모의를 실시하였으며 또한, 첨두치가 다른 여러 개의 홍수사상에 대해서도 모를 실시하여 홍수 규모에 따른 결과를 비교하여 가동보 운영의 효과를 분석하였다.

  • PDF

Alternatives Development for Basin-wide Flood Mitigation Planning by Determining Economic Optimal Project Size (최적사업규모 결정을 통한 유역치수계획의 대안수립 방안)

  • Yi, Choong-Sung;Shim, Myung-Pil;Lee, Sang-Won
    • Journal of Korea Water Resources Association
    • /
    • v.43 no.5
    • /
    • pp.495-505
    • /
    • 2010
  • The integrated basin-wide flood mitigation planning has a numerous individual proposals with different characteristics. So, it makes difficult to develop the optimal alternative that combines such elements. To develop the optimal alternative, it's necessary not only to assess the flood damage but also to define a tolerable degree of damage. Such a definition is made in a way, dubbed the 'social consensus' in a broad sense; but initially, it requires the analysis of the economic efficiency within a scope, which is technically achievable. This study aims to propose the alternatives development method so that the combination of the individual proposals could be economically efficient. To this end, this study defined the flood mitigation projects as the economic production activities carried out by inputs and outputs, and proposed the optimal project size as the principle of developing alternatives. This study may have the worth in improving the alternatives development method by considering the optimal project scale from the economic viewpoint while the existing method depending on engineering aspect. Such approach is expected to correspond to the current government's policy that avoids the passive flood mitigation focused on channel-wide planning but pursues the basin-wide flood mitigation planning focusing on damaged area, thereby provide efficient tools to come up with the solution.