• Title/Summary/Keyword: 측정계획

Search Result 1,881, Processing Time 0.029 seconds

A Study on Propriety Evaluation on Library Development Plan of the Ministry of Culture and Tourism with SMART Method (문화관광부의 도서관발전종합계획(2003-2011)에 대한 타당성 평가에 관한 연구)

  • Noh, Dong-Jo
    • Journal of the Korean Society for Library and Information Science
    • /
    • v.41 no.3
    • /
    • pp.165-179
    • /
    • 2007
  • This study regards the evaluation for the main contents of the 'Library Development Plan(2003-2011)' promoted by the Ministry of Culture and Tourism for the library development plan in Korea. SMART evaluation method was introduced for the evaluation of vision, objective, core project of library development plan. Following result was acquired as a result of the study. First. as a result of SMART vision, objective, core projects and main business of library development plan was presented to be 3.05, 3.09, 3.15 and 3.12 respectively. Thus, in the evaluation for components of development Plan, it was excellent in core projects. Second, as a result of SMART, concreteness, measurability, achievability, relevance and time frame of library development plan was presented to be 3.09. 2.99. 3.12. 3.24 and 3.10 respectively. Thus, in the evaluation components of development plan. it was excellent in relevance but it has been found that supplementary measures should be taken on measurability. Third, 'culture-oriented room with knowledge and information' was found to be superior to the 'information library with up-to-date technology' in evaluation of the objective. Fourth, 'substantiality in user service with the supplement of library contents' was excellent in evaluation of core projects but there is some problem with 'activation of library function through training and supplement of professional manpower.' Fifth. 'Enhancement in library information service' was presented to be excellent in evaluation of main business but there was problem in 'reinforcement in function of library for each location and type,' 'partnership of public-private enterprises' and 'promotion for book culture of the public' thus it need to be revised and supplemented hereafter.

Differences in Target Volume Delineation Using Typical Radiosurgery Planning System (각각의 방사선수술 치료계획시스템에 따른 동일 병변의 체적 차이 비교)

  • Han, Su Chul;Lee, Dong Joon
    • Progress in Medical Physics
    • /
    • v.24 no.4
    • /
    • pp.265-270
    • /
    • 2013
  • Correct target volume delineation is an important part of radiosurgery treatment planning process. We designed head phantom and performed target delineation to evaluate the volume differences due to radiosurgery treatment planning systems and image acquisition system, CT/MR. Delineated mean target volume from CT scan images was $2.23{\pm}0.08cm^3$ on BrainSCAN (NOVALS), $2.13{\pm}0.07cm^3$ on Leksell gamma plan (Gamma Knife) and $2.24{\pm}0.10cm^3$ on Multi plan (Cyber Knife). For MR images, $2.08{\pm}0.06cm^3$ on BrainSCAN, $1.94{\pm}0.05cm^3$ on Leksell gamma plan and $2.15{\pm}0.06cm^3$ on Multi plan. As a result, Differences of delineated mean target volume due to radiotherapy planning system was 3% to 6%. And overall mean target volume from CT scan images was 6.36% larger than those of MR scan images.

Calculation of high discharge under hydrological conditions with probability frequency - Focusing on the Seolmacheon catchment - (확률빈도를 갖는 수문조건에서의 고유량 산정 - 설마천 유역을 중심으로 -)

  • Kim, Dong Phil
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2021.06a
    • /
    • pp.385-385
    • /
    • 2021
  • 하천에서 실제로 유속 2.0m/s 이상 발생할 시 유량측정은 매우 급변하는 유속과 수위변화에 따른 측정값의 불확실성, 운영적인 측면에서의 시·공간적 한계 등으로 고유량에 대해 정확한 유량을 산정하기 어려운 실정이다. 그리고 국가하천은 최소 80년 빈도 이상, 지방하천은 최소 50년 빈도 이상의 확률강우량 채택을 통해 고유량에 해당하는 계획홍수량을 산정하고 있으나, 실제로 높은 호우의 빈도는 쉽게 발생하지 않아 유량측정성과가 부재하거나 매우 극소수에 불과한 상황이다. 따라서 유량측정성과는 대상하천의 계획홍수량(계획홍수위) 이하의 수준, 즉 중규모 수위 이하의 구간에서 대부분의 성과를 가지고 있으므로 고유량 산정은 고수위 외삽추정식에 의존할 수밖에 없다. 고수위 외삽추정은 대체로 기 유량측정성과(h, q)와 통수단면적(AD1/2) 자료를 이용하는 Stevens 방법을 주로 이용하며, 이 방법은 하폭에 비해 수심이 비교적 작은, 얕은 하천과 기 유량측정성과가 추정하려는 고수위 구간에 근접한 경우에 적용성이 매우 용이하다고 할 수 있다. 설마천 유역 전적비교 수위관측소의 경우는 수위 4.110m까지 최대로 통수할 수 있으며, 하폭은 24.230m, 관측 최고수위는 3.194m, 유량측정성과 최대수위는 1.613m(40.303m3/s)이다. 설마천 유역에 대해 Stevens 방법을 적용하는 경우 위 조건을 만족하지 않으므로 다른 방법으로의 접근이 필요하다. AMC-III 조건의 선행강수량과 지속기간 1시간을 갖는 최대강우강도별 관측도달시간 자료를 통해 관계식을 유도하였으며, 강우 빈도해석의 결과인 지속기간 1시간의 빈도별 강우강도에 해당하는 도달시간을 유속으로 환산하는 과정을 거쳤다. 그 결과 유속은 1.808m/s(2년 빈도_43.3mm)~4.254m/s(500년 빈도_101.9mm)이며, 기 유량측정성과의 결과인 수위, 통수단면적, 유속, 유량, 최대강우강도(86.1mm_80년 빈도)가 발생했을 때의 해당 유속(도달시간 환산값), 수위, 통수단면적을 통해 최종적으로 빈도(년)별 유속, 수위, 유량을 결정하였다. 한국하천일람(2018)에서 제시된 설마천 전체 유역의 80년 빈도 계획홍수량(315m3/s, A=17.59km2) 값은 전적비교 수위관측소(A=8.48km2)와 직접적인 비교는 어렵지만, 유역면적비(0.482)를 적용한 추정된 계획홍수량은 약 152m3/s 볼 수 있다. 상기의 빈도별 유속, 수위, 통수단면적 결과인 80년 빈도(86.1mm)-유속(3.594m/s)-수위(3.194m)-통수단면적(53.197m2)에 해당하는 계산된 유량은 191.212m3/s로 분석되었다. 그리고 최대통수가 가능한 수위 4.110m의 계산된 유량은 313.674m3/s(약 424년 빈도 추정, 유속 4.203m/s, 통수단면적 74.761m2)로 결국에는 빈도(년)에 해당하는 수위-유량관계식(고수위 외삽추정식)을 통해 고유량을 산정할 수 있었다.

  • PDF

Small Field Dosimetry for Stereotacitc Radiosurgery (뇌정위적 방사전수술을 위한 소조사면 측정)

  • 최동락;안용찬;이정일;허승재
    • Progress in Medical Physics
    • /
    • v.6 no.1
    • /
    • pp.59-64
    • /
    • 1995
  • The aim of presentation is to obtain the beam parameters for tratment planning of steretactic radiosurgery. The dosimerical parameters such as TMR, scatter factor, and OAR was measured using diode, film, micro ion chamber, and thimble chanber for water phantom scanning. The results were compared each other. As a result, we determined OAR from film and scatter factor and TMR from diode as a basic data for treatment planning.

  • PDF

A Study of Improvement on Pedestrian Level of Service by Pedestrian Satisfaction - Focused on Lower Floor Building Use in Seoul - (보행만족도에 따른 보행서비스수준 지표개선 - 서울시 저층부 용도를 대상으로 -)

  • Moon, Young-gi;Kim, Dong-joon;Han, Jei-hyun;Kang, Jun-mo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.6
    • /
    • pp.979-990
    • /
    • 2018
  • The main purpose of this study is to discriminate the pedestrian environment by simple calculation such as using the matrix from pedestrian level of service. However, the general use of pedestrian level of service cannot discriminate the environment of footpaths, especially in Seoul. Most of the passages in Seoul are showing level A, which means most passages are spacious, but pedestrians don't agree that passages are wide enough to walk. In conclusion, comparing the pedestrian level of service with pedestrian satisfaction in different circumstances such as use of building in lower floors. Test areas are 1,157 spots in Seoul. First, The new pedestrian level of service shows equally in all spots. Second, spots where the highest pedestrian satisfaction are mostly in level B or level C, thus planning the walkways in future, level B or level C is recommended in most cases.

Comprehensive Vibration Assessment Program Measurement Test Plan for Advanced Power Reactor 1400 (신형경수로 1400 종합진동평가프로그램 측정시험 계획)

  • Ko, Do-Young;Kim, Kyu-Hyung
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2013.04a
    • /
    • pp.589-595
    • /
    • 2013
  • A reactor vessel internals comprehensive vibration assessment program(RVI CVAP) of an advanced power reactor 1400(APR1400) is being verified on the integrity of RVI for the design life of the plant by performing the non-prototype category-2 type on the US Nuclear Regulatory Commission Guide(NRC RG) 1.20, for which consists of a vibration and stress analysis program, a limited vibration measurement program, an inspection program, and the correlation of these programs. The aim of this paper is to describe the plan for the vibration measurement, test and acceptance criteria portion, and documentation and results of the APR1400 RVI CVAP. We will conduct the limited vibration measurement program of the APR1400 RVI CVAP according to the measurement plan and the vibration measurement testing in this paper.

  • PDF

Evaluation of Planning Dose Accuracy in Case of Radiation Treatment on Inhomogeneous Organ Structure (불균질부 방사선치료 시 계획 선량의 정확성 평가)

  • Kim, Chan Yong;Lee, Jae Hee;Kwak, Yong Kook;Ha, Min Yong
    • The Journal of Korean Society for Radiation Therapy
    • /
    • v.25 no.2
    • /
    • pp.137-143
    • /
    • 2013
  • Purpose: We are to find out the difference of calculated dose of treatment planning system (TPS) and measured dose in case of inhomogeneous organ structure. Materials and Methods: Inhomogeneous phantom is made with solid water phantom and cork plate. CT image of inhomogeneous phantom is acquired. Treatment plan is made with TPS (Pinnacle3 9.2. Royal Philips Electronics, Netherlands) and calculated dose of point of interest is acquired. Treatment plan was delivered in the inhomogeneous phantom by ARTISTE (Siemens AG, Germany) measured dose of each point of interest is obtained with Gafchromic EBT2 film (International Specialty Products, US) in the gap between solid water phantom or cork plate. To simulate lung cancer radiation treatment, artificial tumor target of paraffin is inserted in the cork volume of inhomogeneous phantom. Calculated dose and measured dose are acquired as above. Results: In case of inhomogeneous phantom experiment, dose difference of calculated dose and measured dose is about -8.5% at solid water phantom-cork gap and about -7% lower in measured dose at cork-solid water phantom gap. In case of inhomogeneous phantom inserted paraffin target experiment, dose difference is about 5% lower in measured dose at cork-paraffin gap. There is no significant difference at same material gap in both experiments. Conclusion: Radiation dose at the gap between two organs with different electron density is significantly lower than calculated dose with TPS. Therefore, we must be aware of dose calculation error in TPS and great care is suggested in case of radiation treatment planning on inhomogeneous organ structure.

  • PDF

Efficient Productivity Evaluation System in Construction Site (건설현장 생산성 측정의 효율적 방안 제시)

  • Jang, Hyo-Won;Kim, Soo-Yong;Kim, Dae-Young
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.666-669
    • /
    • 2007
  • 건설 공사에 있어서 생산성은 중요한 의미를 가지고 있다. 하지만 국내 건설현장에서의 샌산성에 대한 인식은 상당히 낮은 것으로 보이며, 건설현장에서의 생산성에 대한 인식변화 및 활성화를 위한 토대를 마련하는 연구는 드물었다고 판단된다. 기존의 생산성 측정에는 많은 방법들이 사용되어지고 있으며, 이러한 측정 기법들은 생산성 측정에 있어서 결과만을 모니터링하고 보다 나은 결과물을 획득하는데 그 목적이 있어왔다. 하지만, 해외의 경우 건설 생산성의 초기투입단계에서의 관리와 노력을 통해 생산성을 향상시키고자 하고 있다. 따라서 본 연구에서는 린 건설에 관련하여 기존의 생산성 측정보다 쉽게 생산성을 측정할수 있고 빠른 피드백을 얻을 수 있는 percent plan complete(PPC)의 기법을 적용한 새로운 생산성 관리가 어떠한 프로세스로 이루어지고 있는지 분석하고 국내 건설 현장의 새로운 생산성 관리 시스템 구축의 기반을 마련코자 한다. PPC는 계획되어진 작업계획의 신뢰성과 생산성을 측정 가능토록 해주며, 린 시스템의 적용이 필주적으로 수반되어야 한다. PPC 측정 후 작업이 실패되었을 경우 그 이유를 파악하고 원인 분석이 이루어져야 한다. 그렇게 된다면 어떤 공정에 대한 결과를 평가할 수 있고 그 과정에서 미래에 발생할수 있는 작업 실패를 예방할 수 있다.

  • PDF

전자해도 시스템에 관한 연구

  • 서상현
    • Proceedings of the Korean Society of Coastal and Ocean Engineers Conference
    • /
    • 1995.10a
    • /
    • pp.26-30
    • /
    • 1995
  • 과거 선박이 대양을 항해할때 선장 및 항해사는 자선의 위치파악을 위해 몇 단계의 과정을 거치곤 하였다. 즉, 위치를 측정하는 위치계측 장비로 부터 자선의 경위도를 안 후 이를 종이지도 위에 기록하는 것이었다. 그리하여 선박이 계획항로로부터 얼마나 이탈하였나를 측정하여 항로를 변경하거나 추후의 항로계획을 수정하곤 하였다. 특히 항내 통항이나, 접이안시에는 노련한 도선사에게 숙련도에 맡겨 놓을 수 밖에 없었던 것이다. (중략)

  • PDF