• Title/Summary/Keyword: 최적의 시기

Search Result 561, Processing Time 0.025 seconds

The Study of Software Optimal Release Using Sensitivity Analysis (민감도 분석을 이용한 소프트웨어 최적방출시기에 관한 연구)

  • Shin, Hyun-Cheul
    • Convergence Security Journal
    • /
    • v.8 no.4
    • /
    • pp.121-126
    • /
    • 2008
  • It is of great practical interest to decide when to stop testing a software system in development phase and transfer it to the user. This decision problem called an optimal release policies. In this paper discussed to specify an optimal release policies. In this paper, propose an optimal release policies of the life distribution applied Erlang distribution of special pattern of Gamma distribution. In this paper, discuss optimal software release policies which minimize a total average software cost of development and maintenance under the constraint of satisfying a software reliability requirement. From Sensitivity Analysis, make out estimating software optimal release time.

  • PDF

Variation Operating Environment Analysis of Port Radiation Monitor (항만 방사선감시기의 검색환경 분석 연구)

  • Kim, Bo-Gyeong;Kim, Sang-Yeol;Park, Ho;Lee, Ji-Yeon
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2017.11a
    • /
    • pp.54-55
    • /
    • 2017
  • 본 연구는 항만에 설치된 방사선감시기의 검색기능 극대화를 위하여 방사선감시기의 검색환경을 분석하고 물류흐름 관점에서 운영환경 개선방안 도출을 목적으로 한다. 본 연구 목적 달성을 위해 원자력안전위원회에서 제시한 방사선 위험화물의 수입 물동량 분석을 수행하여 방사선감시기 설치 타당성을 확보하였다. 문헌조사와 현장 전문가 인터뷰를 통해 항만의 방사선감시기 설치환경 및 운영에 따른 물류 장애요인을 분석하였다. 또한, 항만 내 방사선감시기 설치가 가능한 위치를 3단계(본선하역작업, 야드 이송 및 적재 작업, 게이트 반출)로 구분하여 각 위치별 장 단점을 분석하고 최적의 감시기 설치 위치를 도출하였다. 연구결과, 감시기 설치 위치 단계별 비용, 물류흐름, 관리 운영적 측면을 고려하였을 때, 게이트 반출 단계가 방사선 감시기 설치를 위한 최적위치로 적합한 것으로 확인하였다. 방사선감시기의 운영최적화 방안으로는 첫째, 반출 게이트 내부의 2차 검색부지 확보를 통해 게이트 통과 전 방사선감시기를 통한 화물 검색이 이루어질 수 있도록 해야 한다. 둘째, 화물인도지시서(Delivery Order: D/O)를 활용한 신속한 화물정보 파악을 통해 물류흐름의 방해요인을 제거 할 수 있음을 알 수 있다.

  • PDF

Simulation on Optimum Repairing Number of Carbonated RC Structure Based on Probabilistic Approach (확률론을 고려한 탄산화된 RC 구조물의 최적 보수시기 해석)

  • Kwon, Seung-Jun
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.5 no.3
    • /
    • pp.230-238
    • /
    • 2017
  • Carbonation is a representative deterioration for underground structure, which causes additional repair for service life. This study proposes a simplified equation for optimum repair timing without complicated probability calculation, considering initial and repair conditions For the work, initial service life, extended service life through repair, and their COVs(Coefficient of Variation) are considered, and the periods which can reduce number of repair are evaluated. Assuming the two service lives to be independent, the repair timings are derived from 10 to 50 years based on the probabilistic method, and the regression analysis technique for optimum repairing timing is proposed. Decreasing COV has insignificant effect on reducing repairing number but shows a governing effect on changes in probability near the critical repairing stage. The extension of service life through repairing is evaluated to be a critical parameter for reducing repairing number. The proposed technique can be efficiently used for maintenance strategy with actual COV of initial and additional service life due to repairing.

A Study on the Optimum Release Time (S/W 시스템의 최적발행시각에 관한 연구)

  • Che, Gyu-Shik
    • Proceedings of the KIEE Conference
    • /
    • 1999.07g
    • /
    • pp.2866-2868
    • /
    • 1999
  • S/W 시스템을 개발하여 테스트한 후 발행시기를 결정함에 있어서 그동안의 비용-신뢰도를 동시에 고려하여 최적발행시기를 결정하고자 하는 연구결과가 얼마나 현실적으로 합리적이고 타당한가를 고찰하고자 한다. 연구방법으로서는 일반적인 비용-신뢰도 최적발행에 대한 기존의 관련논문을 중심으로 제시된 연구방법들에 대해서 연구해보고. 특히 그 최적발행정책의 한계성에 대해서 중점적으로 연구하고자 한다.

  • PDF

The Comparative Study of Software Optimal Release Time Based on Log property Distribution (로그형 특성분포에 근거한 소프트웨어 최적 방출시기에 관한 비교 연구)

  • Kim, Hee-Cheul;Park, Hyoung-Keun
    • Proceedings of the KAIS Fall Conference
    • /
    • 2010.05a
    • /
    • pp.149-152
    • /
    • 2010
  • 본 연구에서는 소프트웨어 제품을 개발하여 테스팅을 거친 후 사용자에게 인도하는 시기를 결정하는 방출문제에 대하여 연구되었다. 인도시기에 관한 모형은 무한 고장 수에 의존하는 비동질적인 포아송 과정을 적용하였다. 이러한 포아송 과정은 소프트웨어의 결함을 제거하거나 수정 작업 중에도 새로운 결함이 발생될 가능성을 반영하는 모형이다. 적용모형은 여러 수명 분포들을 적합시키는데 효율적인 특성을 가진 콤페르쯔, 파레토, 로그-로지스틱 모형과 같은 로그형 특성분포를 이용하였다. 따라서 소프트웨어 요구 신뢰도를 만족시키고 소프트웨어 개발 및 유지 총비용을 최소화 시키는 방출시간이 최적 소프트웨어 방출 정책이 된다. 본 논문의 수치적인 예에서는 고장 간격 시간 자료를 적용하고 모수추정 방법은 최우추정법을 이용하여 최적 방출시기를 추정하였다.

  • PDF

The Comparative Study of the Warranty Cost Model for Software Reliability Time Based on Extreme Value Distribution (극값 분포 특성을 가진 소프트웨어 신뢰성 보증 모형에 관한 비교연구)

  • Kim, Hee-Cheul
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.34 no.6B
    • /
    • pp.623-629
    • /
    • 2009
  • In this research, the process of developing software products to users in transfer by considering the warranty period to determine the timing of the release period is a comparative study of models. For the results of demonstration, exponential software reliability model increases the warranty period, the higher the initial period, but shows almost a similar release. In contrast, the optimal release time of imperfect debugging software reliability model, lower the initial warranty period, but the pattern is expected to rise slightly larger. The proposed model, extreme value distribution model, pattern of the optimal release time gradually increase, have a form that can be drawn. These research results through, warranty period and release the software developers understand the relationship between the optimal time for software development by using advance information could do is feed.

The Study of Software Optimal Release Time Based on Log-Logistic Distribution (로그로지스틱 분포특성에 근거한 소프트웨어 최적 방출시기에 관한 연구)

  • Kim, Hee-Cheul;Park, Hyoung-Keun
    • Proceedings of the KAIS Fall Conference
    • /
    • 2011.05a
    • /
    • pp.176-178
    • /
    • 2011
  • 본 연구에서는 소프트웨어 제품을 개발하여 테스팅을 거친 후 사용자에게 인도하는 시기를 결정하는 방출문제에 대하여 연구되었다. 인도시기에 관한 모형은 무한 고장수에 의존하는 비동질적인 포아송 과정을 적용하였다. 이러한 포아송 과정은 소프트웨어의 결함을 제거하거나 수정 작업 중에도 새로운 결함이 발생될 가능성을 반영하는 모형이다. 강도함수는 로그-로지스틱 패턴을 이용하였다. 따라서 소프트웨어 요구 신뢰도를 만족시키고 소프트웨어 개발 및 유지 총비용을 최소화 시키는 방출시간이 최적 소프트웨어 방출 정책이 된다.

  • PDF

The Study of Software Optimal Release Time Based on Superposition Distribution (중첩 분포특성에 근거한 소프트웨어 최적 방출시기에 관한 연구)

  • Kim, Hee-Cheul;Park, Hyoung-Keun
    • Proceedings of the KAIS Fall Conference
    • /
    • 2011.05a
    • /
    • pp.179-181
    • /
    • 2011
  • 본 연구에서는 소프트웨어 제품을 개발하여 테스팅을 거친 후 사용자에게 인도하는 시기를 결정하는 방출문제에 대하여 연구되었다. 인도시기에 관한 모형은 무한 고장수에 의존하는 비동질적인 포아송 과정을 적용하였다. 이러한 포아송 과정은 소프트웨어의 결함을 제거하거나 수정 작업 중에도 새로운 결함이 발생될 가능성을 반영하는 모형이다. 강도함수는 중첩 패턴을 이용하였다. 따라서 소프트웨어 요구 신뢰도를 만족시키고 소프트웨어 개발 및 유지 총비용을 최소화 시키는 방출시간이 최적 소프트웨어 방출 정책이 된다.

  • PDF

The Comparative Study of Software Optimal Release Time Based on Record Value Statistics (기록값 통계량을 이용한 소프트웨어 최적 방출시기에 관한 비교 연구)

  • Kim, Hee-Cheul;Park, Hyoung-Keun
    • Proceedings of the KAIS Fall Conference
    • /
    • 2009.05a
    • /
    • pp.659-662
    • /
    • 2009
  • 본 연구에서는 소프트웨어 제품을 개발하여 테스팅을 거친 후 사용자에게 인도하는 시기를 결정하는 방출문제에 대하여 연구되었다. 소프트웨어의 결함을 제거하거나 수정 작업 중에도 새로운 결함이 발생될 가능성이 있는 무한고장수를 가진 비동질적인 포아송 과정에 기초하고 수명분포는 신뢰도 측면에서 여러 분포들을 적합시키는데 효율적인 특성을 가진 와이블분포를 이용한 최적 방출시기에 관한 문제를 제시하여 소프트웨어 요구 신뢰도를 만족시키고 소프트웨어 개발 및 유지 총비용을 최소화 시키는 최적 소프트웨어 방출 정책에 대하여 논의되었다.

  • PDF

Tentative Proposal of Optimal Timing of Kasai Operation for Biliary Atresia Based on Fibroscan Results (간섬유화스캔을 이용한 선천성 담도 폐쇄증의 최적 수술시기 시험적 제안)

  • Lee, Hwa-Young;Park, Young-A;Han, Seok-Joo;Koh, Hong
    • Pediatric Gastroenterology, Hepatology & Nutrition
    • /
    • v.14 no.1
    • /
    • pp.74-80
    • /
    • 2011
  • Purpose: Based on previous research findings, it is well-known that the timing of surgery is generally considered the most important prognostic factor for a Kasai portoenterostomy, the primary treatment for biliary atresia. This research aimed to identify the optimal timing of a Kasai portoenterostomy and to verify if the proposed optimal timing corresponds to previous studies. All patients were classified by the timing of surgery, and pre- and post-operative fibrotic changes of the liver were measured with the elasticity value from fibroscans. Methods: The stiffness scores of the pre- and post-operative fibroscans in 34 patients who were treated by Kasai portoenterostomy from October 2007 to September 2010 in Severance children's hospital were reviewed. Results: The earlier the patients were treated by Kasai portoenterostomy, the lower the fibroscan scores. When the patients were treated prior to the 8th week, the post-operative scores of the fibroscans were significantly better than those patients who were treated after the 8th week, and some even recovered partially. Moreover, when operated before the 8th week, the differences between each pre- and postoperative fibroscan score also showed statistical relevance (p=0.0002). Conclusion: The earlier the patient was treated by Kasai portoenterostomy, the less liver fibrosis that developed, the lower the level of post-operative fibrosis, and the less the degree of fibrotic progress before and after the operation. Thus, this research proposal reconfirms once more that the 8th week is the optimal timing for a Kasai portoenterostomy.