• Title/Summary/Keyword: 최대연속강우량

Search Result 28, Processing Time 0.034 seconds

Probability Distribution of Rainfall Events Series with Annual Maximum Continuous Rainfall Depths (매년최대 연속강우량에 따른 강우사상 계열의 확률분포에 관한 연구)

  • 박상덕
    • Water for future
    • /
    • v.28 no.2
    • /
    • pp.145-154
    • /
    • 1995
  • The various analyses of the historical rainfall data need to be utilized in a hydraulic engineering project. The probability distributions of the rainfall events according to annual maximum continuous rainfall depths are studied for the hydrologic frequency analysis. The bivariate normal distribution, the bivariate lognormal distribution, and the bivariate gamma distribution are applied to the rainfall events composed of rainfall depths and its durations at Kangnung, Seoul, Incheon, Chupungnyung, Teagu, Jeonju, Kwangju, and Busan. These rainfall events are fitted to the the bivariate normal distribution and the bivariate lognormal distribution, but not fitted to the bivariate gamma distribution. Frequency curves of probability rainfall events are suggested from the probability distribution selected by the goodness-of-fit test.

  • PDF

An Evaluation of Landslide Probability by Maximum Continuous Rainfall in Gangwon, Korea (강원지역의 최대연속강우량에 의한 산사태 발생가능성 평가)

  • Yang, In-Tae;Park, Jae-Kook;Jeon, Woo-Hyun;Chun, Ki-Sun
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.15 no.4
    • /
    • pp.11-20
    • /
    • 2007
  • Most natural disasters in Korea are caused by meteorological natural phenomena, which include storms, heavy rains, heavy snow, hail, tidal waves, and earthquakes. Rainfall is the most frequent cause of disasters and accounts for about 80% of all disasters. Particularly in recent years, Korea has seen annual occurrences of natural disasters associated with landslides (slope and retaining wall collapse and burying) due to meteorological causes from the increasing intensity of heavy rains including local heavy rainfalls. In Korea, it is critical to analyze the characteristics of landslides according to rainfall characteristics and to take necessary and proper measures for them. This study assessed the possibility of landslides in the Gangwon region with a geographic information system by taking into account the inducer factors of landslides and the maximum continuous rainfall of each area. It also analyzed areas susceptible to landslides and checked the distribution of landslide-prone areas by considering the rainfall characteristics of those areas.

  • PDF

Modeling reservoir water balance for generating quasi realtime operation data (준 실시간 저수지 운영자료 생산을 위한 물수지 모형)

  • Noh, Jaekyoung;Lee, Jaenam
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.125-125
    • /
    • 2022
  • 저수지 운영자료는 다목적 댐 경우와 마찬가지로, 유입량, 저수량, 방류량 자료로 구성된다. 여기에 강우량을 포함하여, 실시간으로 관리돼야 한다. 그러나 우리나라 저수지는 저수율 자료만 관리하고 있다. 유입량, 방류량이 없는 것이 아니고 관리를 하지 않는다. 강우량은 전혀 없다. 큰 문제인데, 아직도 그 심각성을 모르고, 대충하면 되는 줄 알고 있다. 가장 기초가 되는 일을 무시하고 물관리를 하고 있는 상황이고, 누구도 그 신뢰성을 믿지 않고 있다. 여기서는 이를 해결하는 방안으로 준 실시간 물수지 모형을 구축하여, 10분 단위, 30분 단위, 1시간 단위로 저수위, 저수량, 유입량, 방류량, 강우량을 연속하여 생산하고 검증하는 체제를 제시한다. 준 실시간의 뜻은 계산에 의하지 않고 유입량을 모의에 의해 적용하고 검증하는 과정이 필요하여, 실시간 보다 하루 이틀 늦게 자료를 생산한다는 의미다. 대상 저수지는 유역 내 강우량 수집이 가능한 유역면적 218.80km2, 유효저수량 3,494만m3, 수혜면적 5,117 ha인 탑정지를 선정했다. 탑정지 방류량은 탑정1(폭 7.5m×높이 1.5m), 탑정2(4m×1.6m), 양수장(3m×1.6m) 수로로 관개용수 공급량과, 9연의 수문(9m×7.5m)으로 홍수기 방류량으로 구성된다. 분석기간은 1월1일부터 1시간 단위로 연속하여 기간은 자유롭게 설정하여 검정하는 체제를 갖추고 검증된 결과를 제시토록 했다. 2021년 9월의 1시간 단위의 탑정지 저수지 물수지 모의 결과를 요약하면 다음과 같다. 첫째, 탑정지 유역의 환경부 관리 장선, 양촌, 연산 관측소의 면적우량은 최대 15.3mm, 총 160.4mm(3,510만m3)였고, ONE 모형에 의해 연속유량을 모의한 결과, 유입량은 최대 35.6m3/s, 총 1,464만m3로 유출률 41.7%였다. 둘째, 탑정1, 탑정2, 양수장 수로의 수위자료에 수위-유량 관계식을 적용해 수로유량을 산정한 결과 합하여 최대 16.8m3/s였고, 총 548만m3였으며, 수문 방류량은 최대 20.0m3/s였고, 총 108만m3였다. 셋째, 저수지 수위는 관측수위는 EL.28.21~29.38m, 평균 EL.28.87m, 모의수위는 EL.28.08~29.62m, 평균 EL.28.80m로 나타났고, R2는 0.910로 만족한 결과를 얻었다. 정리하면 저수지 운영자료가 없는데도, 10분, 1시간 단위로 연속으로 유입량, 저수량을 모의하여 관측저수량과 비교한 결과가 괄목할 신뢰도를 나타냈다. 이를 바탕으로 저수량, 유입량, 방류량, 강우량 등 준 실시간 저수지 운영자료 생산체제를 마련한 것으로 결론을 내렸다.

  • PDF

Studies on the Some Hydrological Quantities of Principal Locations in the Basin of Geum River(I) (금강유역(錦江流域) 주요지점(主要地点)의 제(諸) 수문량(水文量)에 관(關)한 연구(硏究)(I))

  • Ahn, Byoung Gi;Cho, Seung Seup
    • Korean Journal of Agricultural Science
    • /
    • v.2 no.1
    • /
    • pp.281-300
    • /
    • 1975
  • The precipitation data and water level data in twenty-four sampling places, to investigate same hydrological quantities along the basin of Geum River, have been analyzed, and the findings for the first report are summarized as follows. 1. The mean annual precipitation in the basin of Geum River is of 1203mm, and the areal weight of areal rainfall by Thiessen's method shows as Table 1. 2. The areas where have maximum annual precipitation of 1501 to 2000mm, are seventeen placed among twentyfour gauging stations, and it is founded to be the highest rate with 71 percents. The precipitation of below 1500mm is measured in the other three statinons, and that of above 2001mm in four stations, too. 3. The areas where have maximum rainfall of 201 to 300mm within a day, are fifteen places, and that comes in the highest rate of distribution with 63 percents. 4. As to distribution of the places with maximum rainfall of below and above 300mm within two days, it shows respectively 50 percents. 5. The areas where have maximum rainfall of 301 to 400mm within three days, are fifteen places, and it is the highest rate of distribution with 63 percents. 6. The fourteen places have maximum rainfall of 401 to 600mm within a continuous day, it is the highest rate of distribution with 58 percents. 7. Table 5 shows probable maximum rainfall within a day, and it does the most rainfall a long the upper stream of Daecheong dam site around Muju, and the next shows in the areas around Ganggyeung, Gongju and Buyeu. 8. During irrigation period on paddy corp, for 100 days from early ten days in June to early ten days in September the areas where have rainfall of 601 to 800mm are sixteen places, and it is the highest rate of distribution with 76 percents, as Table 6 9. The areas where have effective rainfall of 501 to 600mm, are fifteen places, and it is the highest rate of distribution with 71 percents. Thirteen places have the effective ratio of 66 to 75 percents, and it means 62 percents of distribution, and the next, 76 to 85 percents in the seven places, and it comes 33 percents. 10. The areas where have probable effective rainfall of 401 to 500mm, are fourteen places, which is about 100mm less than mean effective rainfall in each area, and that comes 67 percents of distribution. 11. A particular year can not be appointed as once -in-10 year drought in the same year as a whole in the basin of Geum River. 12. The basin of Geum River, s/S being 0.53 to 0.74, has relatively proper conditions in the aspect of water resources.

  • PDF

A Programming of Hydrologic Analysis Procedure for the Probable Isohyetal Chart in Korea (한국 확률강우량도 작성을 위한 수문해석방법 개발)

  • 이원환
    • Water for future
    • /
    • v.20 no.2
    • /
    • pp.139-150
    • /
    • 1987
  • The present study is to develop the hydrologic analysis procedure for the purpose of drawing the probable isohyetal charts in Korea. In the establishment of optimal distribution types, the eleven continuous probability distribution types included the transformed variable normal distribution (Y-k method) is applied to the annual maximum rainfall depth series in each duration. The optimal selection of distribution is done by Chi-square test and Kolmogorov-Smirnov test in the eui-class interval. The application of probability distribution is checked by the fitting on four durations of annual maximum rainfall data(10 min., 60 min., 6 hrs., and 24hrs.) at four meteorological stations in Korea (Seoul, In Cheon, Bu san, and Kwang Ju). The properties in hydrologic application of the considered distribution and the hydrologic characteristics of the applied rainfall data groups are investigated from the results of this study.

  • PDF

Decision of Rainfall Time Distribution Method for Storm Sewer Design (우수관로 계획시 확률강우량의 시간분포방법 선정)

  • Park, Jong Pyo;Kim, Mun Mo;Jo, Min Hyun;Lee, Kyoung Do
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2015.05a
    • /
    • pp.405-410
    • /
    • 2015
  • 우리나라는 2000년대 이후, 하천 및 수공구조물 계획시 Huff 분포를 지배적으로 사용해 왔다. 그러나 Huff 방법은 호우선정, 평균방법, 지속기간별 동일분포 가정 등 여러 가지 문제를 가지고 있어 극치 호우사상을 적절히 모의하지 못하는 약점이 있다는 의견이 많았다. 본 연구에서는 하천, 수공구조의 계획시 국내에서 주로 사용해 왔던 강우량 시간분포 방법인 Huff 방법이 과연 하수도시설물 계획시 적정한가를 평가하고 중소규모 배수(排水)시설물 설계시 합리적이라고 알려져 있는 ABM 방법의 적용성을 비교, 평가하여 하수도시설물의 계획시 적정한 확률강우량의 시간분포 방법을 제안하고자 한다. 연구대상 지역은 삼척지역이며 기상청 산하 동해관측소 자료를 이용하여 연구를 수행하였다. 삼척지역의 지속기간별 확률강우량을 Huff 방법을 적용하여 시간분포하면 지속기간 2시간, 3시간 호우의 1시간 최대치의 경우 지속기간 1시간 최대치 보다 크게 산정된다. Huff 1분위의 경우 지속기간 1시간 호우는 55.3mm이나 지속기간 2시간, 3시간 호우의 1시간 최대치는 각각 61.8mm, 60.7mm 로 지속기간 1시간 호우보다 더 크게 평가되었다. 이러한 구간별 최다 강우량의 지속기간별 역전현상은 도달시간 1시간이내의 소유역이라 할지라도 지속기간 2, 3시간호우에서 첨두홍수량이 발생할 수 있는 문제점을 내포하고 있다. 지속기간의 개념을 고려하여 빈도별 홍수시 ABM, Huff 방법의 적용성을 검토하였다. ABM 방법의 경우 적용 유역 면적(0.1~2,000ha) 전체에서 지속기간이 길어지면 첨두홍수량 결과가 수렵하는 것으로 검토되었다. 반면, Huff 방법의 경우 유역면적이 커짐에 따라 임계지속기간이 길어진다. 30년 빈도 홍수의 경우 유역면적 0.1~0.5ha 에서는 30분, 1~50ha 에서는 1시간, 80~300ha 에서는 2시간, 500~2,000ha 에서는 3시간이 임계지속기간인 것으로 분석되었다. 소규모 유역에서는 ABM과 Huff 방법의 홍수량 산정결과의 차이가 크지 않았으며 하수도시설물 계획시 적용성이 높은 강우량 시간분포 방법은 유역의 연속성을 고려할 수 있는 ABM 24시간 호우를 이용하는 것이 타당할 것으로 사료된다.

  • PDF

Probable rainfall variability using the Annals of Chosun Dynasty (조선왕조실록의 호우기록을 이용한 확률강우량의 변동성)

  • Park, Min-Kyu;Yoo, Chul-Sang;Kim, Hyun-Jun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2009.05a
    • /
    • pp.1131-1135
    • /
    • 2009
  • 본 연구에서는 조선왕조실록의 호우기록을 이용하여 강우량 기록기간을 확장하는 효과를 얻어 이를 반영했을 때의 확률강우량의 변화를 검토하였다. 우리나라의 조선왕조실록은 약 500여년에 걸친 조선왕조의 주요한 사건들을 다루고 있으며 큰 피해를 입힌 홍수나 가뭄피해 및 현상을 잘 기록하고 있다. 특히 조선시대의 경우 조선초기부터 강우량의 과학적 측정에 대한 관심으로 측우기를 개발하여 전국적인 우량 관측망을 갖춘 바 있으며 현재는 영조 말년에 해당하는 1777년 이후의 측우기 기록이 남아있다. 따라서 조선왕조실록의 큰 호우사상이 발생하였을 때의 기록을 당시의 대처, 기록방법 등의 검토와 함께 측우기 기록과 비교하여 조선왕조 전체에 걸친 주요호우사상을 판별할 수 있었다. 이때, Stedinger가 제시한 censored data를 이용한 빈도해석 방법을 적용할 경우 조선왕조실록을 검토하여 얻은 주요 호우사상의 개략적인 규모 및 회수를 이용하여 확률 강우량을 산정할 수 있었다. 이 방법은 일정기간동안 특정 크기 이상의 호우사상의 크기를 안다면 연속적인 연최대강우량계열이 있는 것과 거의 동일한 수준으로 확률강우량을 산정하는 방법이다. 현대 강우빈도해석의 가장 큰 문제는 자료의 관측기간의 부족으로 인해 고빈도에 대한 신뢰도가 떨어지는 문제이다. 이에 대한 대안으로 조선왕조실록과 측우기 자료를 이용하여 장기간의 강우자료를 확보한 효과를 반영할 때 확률강우량은 현재보다 상당히 증가할 수 있는 것으로 검토되었다.

  • PDF

Estimation of Maximum 30-min Intensity using Hourly-based Data in Daegu station (시강우량을 이용한 30분 최대 강우강도 추정방법에 관한 연구)

  • Lee, Joon-Hak;O, Gyeong-Du;Heo, Jun-Haeng
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2011.05a
    • /
    • pp.388-391
    • /
    • 2011
  • 강우침식인자를 구하기 위해서는 개별 호우사상의 30분 최대 강우강도를 산정해야 한다. 이를 위해서는 연속된 분단위 강우자료가 필요하지만, 자료 획득이 제한되어 지점별로 보다 얻기 쉬운 시간 단위 강우량을 이용하여 30분 최대 강우강도를 추정하려는 노력이 있어왔다. 본 연구는 시강우량을 이용하여 개별 호우사상의 30분 최대 강우강도를 추정하기 위한 것으로서 대구 지점의 1960년~1999년 기간의 818개 호우사상을 이용하였다. 분류된 호우사상별 30분 최대 강우강도를 기상청으로부터 획득한 분단위 강우자료를 이용하여 산출한 뒤, 이를 참값으로 하여 60분 최대 강우강도와의 상관관계를 분석하였다. 그 결과 대구 지점의 60분 최대 강우강도로부터 30분 최대 강우강도를 추정할 수 있는 변환계수는 1.228로 나타났으며, 고정시간 1시간 최대 강우강도로부터 30분 최대 강우강도를 추정할 수 있는 변환계수는 1.3778로 나타났다.

  • PDF

Simulating flood inflow to multipurposed dam on 2020.8.7.~8.8 storm with ONE model (ONE 모형에 의한 2020.8.7.~8.8. 호우의 댐 유입량 모의)

  • Noh, Jaekyoung
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2021.06a
    • /
    • pp.120-120
    • /
    • 2021
  • 2020년 8월 7일부터 8월 8일까지 호우는 용담댐, 섬진강댐, 합천댐 하류 유역의 막대한 침수피해를 일으켰다. 이들 다목적 댐 유입량의 신뢰도 높은 모의는 홍수기 댐 운영 및 하류하천의 홍수 해석에 필수다. 여기서는 일 유출 모의 기반으로 개발된 ONE 모형을 10분 단위, 1시간 단위로 적용한 결과를 제시하고자 한다. 보통 홍수모의는 사상별로 실시하지만, 여기서는 1월1일부터 12월 31일까지 연속으로 모의한 결과에서 해당 홍수사상 결과를 제시하였다. 3개 다목적 댐의 홍수사상은 8월6일부터 8월 10일까지 5일간으로 설정하였다. 유역면적은 용담댐, 섬진강댐, 합천댐, 각각 930km2, 763km2, 925km2, 총강우량은 각각 490.7mm, 451.9mm, 452.4mm, 첨두유입량은 10분 단위는 각각 4,872.7m3/s, 3,533.7.0m3/s, 2,776.0m3/s, 1시간 단위는 각각 4,394.9m3/s, 3,401.8m3/s, 2,745.6m3/s, 총유입량은 각각 3억8,836만m3, 3억1,324만m3, 3억2,816만m3였다. 첨두유입량 상대오차가 0일 때의 매개변수로 모의한 결과를 제시하며, 총유입량 상대오차(Vq), R2, RMSE, NSE 등으로 평가하였다. 용담댐 결과는 10분 단위 경우 최대면적강우량 7.3mm, 첨두유입량 4,872.4m3/s, 총유입량 3억 8,138만m3, Vq 1.9%, R2 0.968, RMSE 207.347, NSE 0.978였고, 1시간의 경우 최대면적강우량 29.6mm, 첨두유입량 4394.9m3/s, 총유입량 4억157만m3, Vq -8.4%, R2 0.970, RMSE 186.962, NSE 0.982였다. 섬진강댐 결과는 10분 단위 경우 최대면적강우량 9.2mm, 첨두유입량 3,533.3m3/s, 총유입량 2억7,223만m3, Vq 18.4%, R2 0.885, RMSE 808.296, NSE 0.925였고, 1시간의 경우 최대 면적강우량 37.9mm, 첨두유입량 3401.6m3/s, 총유입량 2억7,029만m3, Vq 13.7%, R2 0.907, RMSE 285.544, NSE 0.936였다. 합천댐 결과는 10분 단위 경우 최대면적강우량 5.5mm, 첨두유입량 2,776.2m3/s, 총유입량 3억3,667만m3, Vq -2.7%, R2 0.941, RMSE 191.896, NSE 0.965였고, 1시간의 경우 최대면적강우량 17.0mm, 첨두유입량 2,746.7m3/s, 총유입량 3억1,333만m3, Vq 4.5%, R2 0.965, RMSE 140.739, NSE 0.981였다. 이상 ONE 모형으로 10분, 1시간 단위의 댐 홍수 유입량 모의결과는 높은 신뢰도를 나타냈다.

  • PDF

Water Budget Analysis of Agricultural Reservoirs Using Continous Rainfall-runoff Model (연속유출분석모형을 이용한 농업용 저수지 물 수지 분석)

  • Lee, Myung-Jin;Jeong, Woo-Chang
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2011.05a
    • /
    • pp.293-293
    • /
    • 2011
  • 고성군의 상수도 보급률은 2008년 기준으로 61%이며, 인근지역인 통영시의 92%에 비하여 매우 낮은 실정이다. 고성군 용수공급 전망을 살펴보면 2014년 일 최대 $25,830m^3$/일의 수요가 예상되나 현재 광역상수도를 전량 수수하는 고성군의 배분량은 $20,500m^3$/일로 $5,330m^3$/일이 부족하여 용수 확보가 필요한 실정이라고 볼 수 있다. 이러한 배경을 바탕으로 본 연구에서는 고성군의 218개소 저수지중 주변의 오염요소가 적은 42개소 저수지 유역에 대해서 강우-유출모형을 모의 수행하였으며, 토양과 관련된 각종 자료와 이를 GIS기법을 이용하여 매개변수를 산정하여, 연속유출분석모형인(NWS-PC)를 통하여 42개 유역의 유입량을 모의 수행하였다. 이러한 산정된 매개변수를 통해 2006년~2009년 동안의 강우량을 토대로 유출모의를 수행하였으며, 2008년 강우량을 토대로 극한 가뭄시의 경우도 모의 수행하였다. 최악의 가뭄시 최저 강우량을 2008년으로 선정하였기에 고성군의 평균유입량은 2,866.8천$m^3$/년으로 나타났다. 1990년~2005년도 평균 농업용수 이용량은 5,879.4천$m^3$/년이며, 2006년~2007년의 평균 농업용수 이용량은 2,186.2천$m^3$/년으로 2005년 이전 농경지 면적이 50%이상 줄어듦에 따라 이용량도 줄었다. 고성군의 평균 식수량은 406.3천$m^3$/년으로 산정되었으며, 고성읍, 하이면, 마암면, 거류면에서 유입량과 농업용수 및 식수량 차이에서 부족한 현상이 나타났으나 고성군 전체 평균으로 봤을 때는 274.3천$m^3$/년의 양이 남는 것으로 나타났다. 본 연구를 통하여 고성군 지역은 대부분의 농촌지역에서 생활용수를 마을상수도나 지하수에 의존하며 생활한다. 고성군 관내 농업용 저수지 중 식수겸용 저수지로 활용함으로써 인근 마을의 생활용수를 공급하게 되면 안정적인 마을상수원확보와 이상기후에 대비한 물 부족 대책을 수립할 수 있으며, 상습가뭄지역의 물 부족 문제가 해결하는데 기초자료로 활용할 수 있다고 판단된다.

  • PDF