• 제목/요약/키워드: 초전도 전력케이블

검색결과 109건 처리시간 0.022초

고온초전도 전력케이블 설계 및 계통적용 (Conceptual Design and Application of HTS Power Transmission Cable)

  • 조전욱;성기철;김해종;이언용;류강식;박종수
    • 한국초전도저온공학회:학술대회논문집
    • /
    • 한국초전도저온공학회 1999년도 제1회 학술대회논문집(KIASC 1st conference 99)
    • /
    • pp.129-133
    • /
    • 1999
  • In recent years, there is a growing needs for large capacity underground power transmission lines with the increasing demand of electric power in the urban area, where various environmental limitations are imposed on the overhead transmission lines. But it is difficult to get the space for the underground power transmission cables because of complicated distributions of underground public facilties such as subway, water pipes, gas etc. As the superconducting power cables have the large power transmission capacity, the high power transmission capacity, the high power transmission density, and low loss characteristics in comparison with a conventional cable, it would be a solution to meet the increased power demand. In this paper, the results of the conceptual design and analysis of power system of HTS power transmission cable is described.

  • PDF

고온초전도 전력케이블 적용효과 검토 (A Study on the Application Effects of HTS Power Cable)

  • 성기철;조전욱;김해종;권영길;최상봉;류강식;김봉태;유인근
    • 한국초전도ㆍ저온공학회논문지
    • /
    • 제2권2호
    • /
    • pp.32-36
    • /
    • 2000
  • In this study, we performed the long-term expansion planning for the conceptual design of HTS power cable in Seoul area. In Korea, underground power cable has been required gradually with increasing demand of electric power transmission density and low loss characteristics in the comparison with a conventional power cables, so we assumed that the HTS power cable is applied between the downtown area and the outskirts of the city for the large power transmission capacity. This paper is to show the effects of HTS power cables in Seoul based on the power system analysis.

  • PDF

연방향 영향을 고려한 2층 고온초전도 전력케이블 코어 설계 (Design of a 2-Layer HTS Power Transmission Cable Core According to the effect of Winding Direction)

  • 주진홍;김석환;조전욱;배준한;김해종;김해준;성기철;홍정표
    • 한국초전도저온공학회:학술대회논문집
    • /
    • 한국초전도저온공학회 2003년도 학술대회 논문집
    • /
    • pp.58-61
    • /
    • 2003
  • A typical HTS power transmission cable has multi-layer conductor structure to increase the current capacity. The current distribution among the conductor tapes is controlled mainly by pitches and winding directions of the layers, because the inductance of the layer is determined by the pitch and the winding direction. However, usually the current is not evenly distributed among the layers. This paper describes a method to make the current distribution more uniform and hence reduce the AC loss. If we choose a good combination we can find the optimal pitches and make an even current distribution. We studied the effect of the winding direction on a 2-layer cable by a statistical way. Calculation results and discussions will be presented.

  • PDF

2층 고온초전도 전력케이블 코어의 전자장 해석 (Electro-magnetic Field Analysis of 2-Layer HTS Power Transmission Cable Core)

  • 조전욱;주진홍;김석환;배준한;김해종;김해준;성기철;홍정표
    • 한국초전도저온공학회:학술대회논문집
    • /
    • 한국초전도저온공학회 2003년도 학술대회 논문집
    • /
    • pp.269-271
    • /
    • 2003
  • A typical HTS power transmission cable has multi-layer conductor structure to increase the current capacity. The tapes of the innermost layer are wound on a round former, and adjacent tapes of another layer are separated by a thin insulating film. In steady state, the total current flows in the conductor layer, and consequently there is magnetic field between the inner and outer layer. This paper describes a magnetic field amplitude around the conductor layer and the HTS tape by a transport current. Also, this paper will help for future cable conductor prototypes.

  • PDF

국내 실계통에서의 22.9 kV 초전도케이블/한류기 시범적용을 위한 보호시스템 설계 (Protection system for the application of 22.9 kV HTS cable and FCL to real power grid in Korea)

  • 이승렬;윤재영;양병모
    • 한국초전도ㆍ저온공학회논문지
    • /
    • 제12권3호
    • /
    • pp.25-28
    • /
    • 2010
  • 22.9 kV HTS cable and FCL will be installed in 154 kV Icheon substation. It is necessary to design a protection system of the substation for a successful application of the HTS devices. This paper proposes a new power protection system for the application of 22.9 kV HTS cable and SFCL to 154 kV Icheon substation in Korea.

초전도케이블/한류기 실계통 적용 변전소 및 설치위치 선정 기술검토 (Determination of a Substation and Installation Site for applying Superconducting Cable/FCL to Real Power Grid)

  • 양병모;원영진;김병헌;강지원;윤재영;이승렬;문영현
    • 한국초전도ㆍ저온공학회논문지
    • /
    • 제11권3호
    • /
    • pp.55-59
    • /
    • 2009
  • In attempts to closely study the effect of high efficiency, friendly environment HTS(High Temperature Superconducting) cable and SFCL(Superconducting Fault Current Limiters) on power system, several projects were carried out around the world. Promising results have been achieved in terms of cable capacity and reliability. commercial HTS cable and SFCL, however, must not only be only be feasible, but meet practical requirements as well. To facilitate the transition of HTS cable technology from the Lab. to the Real Grid, a New project for applying 22.9kV HTS cables and SFCL to the commercial Power Grid supported by Government has just started in KEPCO. Target of this project is to operate two 22.9kV, 50MVA, 150MVA HTS cables and two 22.9kV 630A, 3000A SFCL in a KEPCO Grid in order to demonstrate its reliability and stable operation. This paper will present the technology for selecting appropriate site and its plan for installation & operating of 22.9kV HTS cables & SFCL in KEPCO Grid.

국내 실계통에서의 초전도케이블 적용가능성 검토 (A Study on the Application of HTS Cable in Korean Power System)

  • 이승렬;김종율;윤재영
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제54권1호
    • /
    • pp.8-17
    • /
    • 2005
  • As power system is developed, an expansion of power equipments is very necessary to the stability of power system and the problem of locating the facilities on downtown is more serious. At this time introduction of superconducting devices are very good alternative to solve the problem. This study describes cases possible to apply HTS cable to Korean power system and analyzes the power system with HTS cable. First of all, we determine the case that HTS cable can be applied to KEPCO systems and analyze the static state of power system. Then we propose a solution of the problem resulting from the analysis.

컴퍽트형 고온 초전도 전력 케이블의 기대 효과와 경제성 평가 (Effect of compact HTS superconduction 7ower cable and evaluation of its economical efficiency)

  • 최상봉;성기철;조건욱;정성환;김대경;김학만;전영환
    • 한국초전도ㆍ저온공학회논문지
    • /
    • 제3권2호
    • /
    • pp.10-14
    • /
    • 2001
  • This paper presents the possible application of a HTS superconducting power cable fro transmitting electric power in metropolitan areas, reflecting its important distinction such as compactness for installation in underground ducts and considerable efficiency improvement comparable to present underground cables. In this paper, we investigated characteristic and market scale compact HTS transmission cable which is possible to install in under-ground ducts. and reviewed its economical efficiency comparing to present existed CV cable construction and duct or tunnel installation.

  • PDF

콤팩트형 고온 초전도 전력 케이블의 도입 효과와 경제성 검토 (Effect of compact HTS superconduction power cable and investigation of its economical efficiency)

  • 최상봉;성기철;조전욱;정성환;김대경
    • 한국초전도저온공학회:학술대회논문집
    • /
    • 한국초전도저온공학회 2001년도 학술대회 논문집
    • /
    • pp.108-111
    • /
    • 2001
  • This paper presents the possible application of a HTS superconducting power cable for transmitting electric power in metropolitan areas, reflecting its important distinction such as compactness for installation in underground ducts and considerably economical efficiency comparable to present underground cables. In this paper, we investigated characteristic and market scale compact HTS transmission cable which is possible to install in underground ducts. And reviewed its economical efficiency comparing to present existed CV cable from point of view such as cost for cable construction and duct or tunnel installation.

  • PDF