The purpose of this study is to develop a new technique to quickly assess the quantitative stability of a tunnel by using measured displacement at the tunnel construction site. To achieve this purpose, in this study, a critical strain concept was introduced for the first time and applied to an assessment of a tunnel under construction. The new technique calculates numerically the strains of the surrounding ground by using displacements measured during tunnel excavation. The techniques considering the relative displacement, shotcrete, and anisotropic characteristics of ground were newly introduced after reinvestigating the existing analysis technique. In addition, an analysis module was developed based on the proposed analysis technique in this study, and the applicability of the developed module was verified. To verify the module, first of all, the calculated excavation displacements of a cylindrical tunnel by analytic method and commercial programs (Pentagon-3D, Flac-2D) were compared for the confirmation of applicability of commercial programs. Then, the calculated excavation displacements under the same initial condition, both with and without a shotcrete lining, by two commercial programs were compared. finally, we assess the load condition and material properties of in-situ ground by inputting tunnel excavation displacement, which was calculated by a commercial program, into the developed analysis module (FAST-Ver. 1.2, feedback Analysis System for Tunneling), and checked whether the assessed results conform to the originally assumed values.
KSCE Journal of Civil and Environmental Engineering Research
/
v.28
no.1C
/
pp.53-62
/
2008
A constitutive model, which can simulate the effect of principal stress rotation associated with direct simple shear test, is proposed in this study. The model is based on two mobilized planes. The plastic strains occur from the two mobilized planes, and depend on stress state, and they are added. The first plane is a plane of maximum shear stress, which rotates about the horizontal axis, and the second plane is a horizontal plane which is spatially fixed. The second plane is used to consider the effect of principal stress rotation on simple shear tests under different stress states. The soil skeleton behavior observed in drained simple shear tests is captured in the model. This constitutive model is incorporated into the dynamic coupled stress-flow finite difference program FLAC. The model is first calibrated with drained simple shear tests on loose Fraser River sand. The measured shear stress and volume change are partially induced by principal stress rotation and compared with model calculations. The model is verified by comparing predicted and measured settlements due to rigid footing resting on loose sands. Settlements predicted by the proposed model were very similar to measured settlements. Mohr-Coulomb model can not consider the effect of principal stress rotation and its prediction was only 20% of measured settlements.
KSCE Journal of Civil and Environmental Engineering Research
/
v.43
no.6
/
pp.689-693
/
2023
Domestic bridges with a service life of more than 30 years are expected to account for approximately 54% of all bridges within the next 10 years. As bridges rapidly deteriorate, it is necessary to establish an appropriate maintenance plan. Recent domestic and international research have focused on the integration of BIM to digitize bridge maintenance information and then enhance accessibility and usability of the information. Accordingly, this study developed a BIM-FEM interoperability algorithm for bridge decks to convert maintenance information into data and efficiently manage the history of maintenance. After creating an initial crack BIM based on an exterior damage map, bridge specification and damage information were linked to a numerical analysis that performs damage analysis considering damage scenarios and design loads. The spread of cracks obtained from the analysis results were updated into the BIM. Based on the damage spread information on the BIM, an automated technology was also developed to assess both the current and future condition ratings of the bridge deck. This approach can enable an efficient maintenance of the deck using the history data from bridge inspection and diagnosis as well as future information on cracks and defects. The expected early detection and prevention would ultimately improve the lifespan and safety of bridges.
Journal of the Microelectronics and Packaging Society
/
v.31
no.2
/
pp.36-44
/
2024
Copper electrodeposition technology is essential for producing copper films and interconnects in the microelectronics industries including semiconductor packaging, semiconductors and secondary battery, and there are extensive efforts to control the microstructure of these films and interconnects. In this study, we investigated the influence of crystallographic orientation on the local plastic deformation of copper films for secondary batteries deformed by uniaxial tensile load. Crystallographic orientation maps of two electrodeposited copper films with different textures were measured using an electron backscatter diffraction (EBSD) system and then used as initial conditions for crystal plasticity finite element analysis to predict the local plastic deformation behavior within the films during uniaxial tension deformation. Through these processes, the changes of the local plastic deformation behavior and texture of the films were traced according to the tensile strain, and the crystal orientations leading to the inhomogeneous plastic deformation were identified.
Seo, Jae-Min;Kim, In-Ju;Bae, Min-Soo;Lee, Jung-Jin;Ahn, Seung-Geun
The Journal of Korean Academy of Prosthodontics
/
v.58
no.2
/
pp.77-85
/
2020
Purpose: The aim of the present study was to investigate the effects of N-acetyl cysteine (NAC) loading on the bone formation surrounding sandblasted, large-grit and acid-etched (SLA) implants. Materials and methods: Implantation of NAC loaded SLA implants (NSI group) and SLA implants (SI group) was performed bilaterally in the mandible of 4 adult beagle dogs (each group, n = 8). The animals were sacrificed after a healing period of 3 and 6 weeks, respectively (n = 2 animal each). Dissected blocks were processed for histomorphometrical analysis. Bone to implant contact percentage (BIC%) and bone volume (BV%) were assessed histomorphometrically. Results: BIC% of NAC loaded SLA implants were about 50% higher than that of SLA implants at 3 weeks of bone healing, but not significantly (51.79 vs 35.43%; P=.185). BV% of NAC loaded SLA implants were significantly higher than that of SLA implants at 3 weeks of bone healing (45.09 vs 37.57 %; P=.044). At 6 weeks of bone healing, BIC% and BV% of two experimental groups were similar (P>.05). Conclusion: Within the limits of the present study, NAC loading have a positive effects on the early bone formation surrounding SLA implants. So, it might be concluded that NAC loading enhance the osseointegration and shorten the healing time after implantation of the SLA implants.
Journal of the Korean Institute of Landscape Architecture
/
v.14
no.2
/
pp.7-16
/
1986
This study was carried out to investigate the effects of such erosion control measures as sowing, planting and small earth structures on the soil and vegetation. In order to study the changes in soil and vegetation, 36 plots were surveyed from 1981 to 1982 in the large erosion control area which is restored last 20 years. The factors which were measured included vegetation coverage, tree growth, number of species, soil depth, soil consistancy, and Chemical properties of soil. The results were as follows; 1) Maximum coverage of the overstory and understory was attained 7 years after the initiation of erosion control. So the overstory need to be tended and pruned. 2) Diversity of species increased until age 6 after which it began to decrease. 3) In order of tree growth, black locust was the fastest, followed by siberian alder and pitch pine. The initial growth of black locust, though the best among the 3 tree stop., decreased rapidly year by year. At the same time, siberian alder and pitch pine grew well until 12 and 6 years after the initiation of erosion control respectively. 4) Fifty percent of the initially planted trees died within 8 yeard. The mortality of siberian alder occurred until the 20th year while the mortality of pitch pine stopped after 10 years. Thereafter 500 trees per hectare were maintained. 5) The soil depth in A and B horision increased by 2cm annually during 20 years. The soil consistency also decreased rapidly until 7th year. The physical soil properties of the rehabilitated areas were improved after the 14th year. 6) The soil pH tend to decrease from 5.3 during the first year to 5.1 during the twentieth year. 7) The organic matter and nitrogen content in the soil were increased by fertilization but after 20 years these nutrients are still deficient for normal tree growth. 8) The phosphorous content in the soil was high in the first year but the longer the period after the initiation of erosion control the lese the content of phosphorous. 9) The biomass of black locust was the highest and increased continuously. The biomass of siberian alder on the contrary decreased from the 15th year because the number of trees in this place was very low. The total biomass in the twentieth year after erosion control initiation was 105.7 ton per hectare.
Purpose: Pedicle screw insertion has been traditionally used as a surgical treatment for degenerative lumbar spine disease. As an alternative, the cortical-bone trajectory screw allows less invasive posterior lumbar fixation and excellent mechanical stability, as reported in several biomechanical studies. This study evaluated the clinical and radiological results of a case of early failure of cortical-bone screw fixation in posterior fixation and union after posterior decompression. Materials and Methods: This study examined 311 patients who underwent surgical treatment from 2013 to 2018 using cortical orbital screws as an alternative to traditional pedicle screw fixation for degenerative spinal stenosis and anterior spine dislocation of the lumbar spine. Early fixation failure after surgery was defined as fixation failure, such as loosening, pull-out, and breakage of the screw on computed tomography (CT) and radiographs at a follow-up of six months. Results: Early fixation failure occurred in 46 out of 311 cases (14.8%), screw loosening in 46 cases (14.8%), pull-out in 12 cases (3.9%), and breakage in four cases (1.3%). An analysis of the site where the fixation failure occurred revealed the following, L1 in seven cases (15.2%), L2 in three cases (6.5%), L3 in four cases (8.7%), L4 in four cases (8.7%), L5 in four cases (8.7%), and S1 in 24 cases (52.2%). Among the distal cortical bone screws, fixation failures such as loosening, pull-out, and breakage occurred mainly in the S1 screws. Conclusion: Cortical-bone trajectory screw fixation may be an alternative with comparable clinical outcomes or fewer complications compared to conventional pedicle screw fixation. On the other hand, in case with osteoporosis and no anterior support structure particularly at L5-S1 fusion sites were observed to have result of premature fixation failures such as relaxation, pull-out, and breakage.
Considering that the number of cases in which a structure foundation is located on weathered rock has been increasing recently, for adequate design bearing capacity of a foundation on weathered rock, allowable bearing capacities of such foundations in geotechnical investigation reports were studied. With reference to the study results, the allowable bearing capacity of a foundation on weathered rock was approximately 400-700 kN/m2, with a large variation, and was considered a conservative value. Because the allowable bearing capacity of the foundation ground is an important index in determining the foundation type in the early design stage, it can have a significant influence on the construction cost and period according to the initial decision. Thus, in this study, six large-scale plate-bearing tests were conducted on weathered rock, and the bearing capacity and settlement characteristics were analyzed. According to the test results, the bearing capacities from the six tests exceeded 1,500 kN/m2, and it shows that the results are similar with the one of bearing capacity formula by Pressuremeter tests when compared with the various bearing capacity formula. In addition, the elastic modulus determined by the inverse calculation of the load-settlement behavior from the large-scale plate-bearing tests was appropriate for applying the elastic modulus of the Pressuremeter tests. With consideration of the large-scale plate-bearing tests in this study and other results of plate-bearing tests on weathered rock in Korea, the allowable bearing capacity of weathered rock is evaluated to be over 1,000 kN/m2. However, because the settlement of the foundation increases as the foundation size increases, the allowable bearing capacity should be restrained by the allowable settlement criteria of an upper structure. Therefore, in this study, the anticipated foundation settlements along the foundation size and the thickness of weathered rocks have been evaluated by numerical analysis, and the foundation size and ground conditions, with an allowable bearing capacity of over 1,000 kN/m2, have been proposed as a table. These findings are considered useful in determining the foundation type in the early foundation design.
This research has studied the changes of Gwi-po(轉角包) by taking the cases of China's medieval wooden buildings as objects. The purpose of the study is to examine the time-periodic transition process of Gwi-po through the cases of 71 wooden buildings which were built from Tang(唐) dynasty(AD 618~690 & 705~907) until Jin(金) dynasty(AD 1115~1234) and also designated as 'Major Historical and Cultural Sites Protected at the National Level'. This research has taken note of various frame types of Jwau-dae(左右隊), which are architectural components of Gwi-po, to study the changes and development process of Gwi-po. The results are as follows. An important factor in the transformations of Gwi-po format is the changes in perception of the craftsmen about Jwau-dae, who took charge in the building process. In the early periods, the principles of Yidou sanshen dougong(一斗三升) in constructing ancons of Gwi-po had been well-maintained, while there appeared many different types of Gwi-po in later periods, due to the usage of Jwau-dae and $Shu{\check{a}}$$t{\acute{o}}u$(?頭) in each Chulmok of Gwi-po. Transitional types of Gwi-po, which were evolved from the earlier ones, are divided into 3 categories by different forms of Jwau-dae, placed on odd number stages. The first one is 'none-$f{\bar{a}}ng$$t{\acute{o}}u$(無枋頭) type' of Song(AD 960~1127, 1127~1279) and Liao dynasty(AD 907~1125) buildings, which doesn't have $f{\bar{a}}ng$$t{\acute{o}}u$(枋頭)s, for the reason that Jwau-dae(左右隊) is in direct contact with Gwihan-dae(耳限大). The second one is '$Shu{\check{a}}$$t{\acute{o}}u$$f{\bar{a}}ng$$t{\acute{o}}u$(?頭枋頭) type' of Song(AD 960~1127, 1127~1279) and Jin dynasty(AD 1115~1234), that has $f{\bar{a}}ng$$t{\acute{o}}u$(枋頭)s of Jwau-dae(左右隊) identical to $Shu{\check{a}}$$t{\acute{o}}u$(?頭) in form. The last one is '$Xi{\check{a}}o$$g{\check{o}}ng$$t{\acute{o}}u$(小?頭) type' of Jin(AD 1115~1234) and Yuan dynasty(AD 1271~1368), which has $f{\bar{a}}ng$$t{\acute{o}}u$(枋頭)s of Jwau-dae identical to $Xi{\check{a}}o$$g{\check{o}}ng$$t{\acute{o}}u$(小?頭) in form. The earlier forms of Gwi-po, which appeared between Tang dynasty(AD 618~690 & 705~907) and Five Dynasties periods(907~960) went through transitional forms of 'non-$f{\bar{a}}ng$$t{\acute{o}}u$(無枋頭) type', '$Shu{\check{a}}$$t{\acute{o}}u$$f{\bar{a}}ng$$t{\acute{o}}u$(?頭枋頭) type' and '$Xi{\check{a}}o$$g{\check{o}}ng$$t{\acute{o}}u$(小?頭) type' and finally had its form settled between Yuan(元, AD 1271~1368) and Ming(明. AD 1368~1644) dynasty periods. In Liao(遼) dynasty period(AD 907~1125), as the buildings got bigger and the tendency of longer eave-exposure was implemented, there grew a certain need to structurally reinforce Gwi-po, on which load of the whole roof is concentrated. Especially, the transition from Tōuxīn $z{\grave{a}}o$(偸心造) style to Jì xīn $z{\grave{a}}o$(計心造) style in this period had a great influence on standardization of Gwi-po, along with None-${\acute{A}}ng$(無仰) style. Furthermore, Wing-type Gong(翼型?), which developed in Liao dynasty(AD 907~1125), is also thought to have had a great influence on the transition from Tōuxīn $z{\grave{a}}o$(偸心造) style to Jì xīn $z{\grave{a}}o$(計心造) style by changing the forms of Gongs(?), such as Gwi-po. However, unlike None-${\acute{A}}ng$(無仰) style, there occurred a gradual change from '$Shu{\check{a}}$$t{\acute{o}}u$$f{\bar{a}}ng$$t{\acute{o}}u$(?頭枋頭) type' to '$Xi{\check{a}}o$$g{\check{o}}ng$$t{\acute{o}}u$(小?頭) type' of Gwi-po in $Xi{\grave{a}}$${\acute{a}}ng$ style.
Due to the limited areal space for installation, borehole heat exchangers (BHEs) at depths deeper than 300 m are considered for geothermal heating and cooling in the urban area. The deep vertical closed-loop BHEs are unconventional due to the depth and the range of the typical installation depth is between 100 and 200 m in Korea. The BHE in the study consists of 50A (outer diameter 50 mm, SDR 11) PE U-tube pipe in a 150 mm diameter borehole with the depth of 300 m. In order to compensate the buoyancy caused by the low density of PE pipe ($0.94{\sim}0.96g/cm^3$) in the borehole filled with ground water, 10 weight band sets (4.6 kg/set) were attached to the bottom of U-tube. A thermal response test (TRT) and fundamental basic surveys on the thermophysical characteristics of the ground were conducted. Ground temperature measures around $15^{\circ}C$ from the surface to 100 m, and the geothermal gradient represents $1.9^{\circ}C/100m$ below 100 m. The TRT was conducted for 48 hours with 17.5 kW heat injection, 28.65 l/min at a circulation fluid flow rate indicates an average temperature difference $8.9^{\circ}C$ between inlet and outlet circulation fluid. The estimated thermophysical parameters are 3.0 W/mk of ground thermal conductivity and 0.104 mk/W of borehole thermal resistance. In the stepwise evaluation of TRT, the ground thermal conductivity was calculated at the standard deviation of 0.16 after the initial 13 hours. The sensitivity analysis on the borehole thermal resistance was also conducted with respect to the PE pipe diameter and the thermal conductivity of backfill material. The borehole thermal resistivity slightly decreased with the increase of the two parameters.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.