• Title/Summary/Keyword: 철도 운행계획

Search Result 93, Processing Time 0.026 seconds

Estimation of the Optimum Number of Rail Cars to Increase the Benefit (철도편익 증대를 위한 소요차량수 산정 방안)

  • Kim, Kyoung-Tae;Lee, Jin-Sun;Park, Bum-Hwan
    • Journal of the Korean Society for Railway
    • /
    • v.13 no.3
    • /
    • pp.333-338
    • /
    • 2010
  • Investment in railroad, it is very important to find a way to increase a benefit to make the economic efficiency more positive, but is also considering that the cost will be higher. In this paper, we suggest a optimized model for increasing the benefit of railroad business considering of stopping patterns. According to existing analytical method, the operation hour is calculated based on that scenario regarding that it stops at all major stations but it does not fit the actual operation conditions. Considering various stopping patterns can be reasonably calculated the cost for required rail cars in the planning stages, and can also affect economic efficiency in a positive way.

Based on the Demand, A Scheduling Method for the Seoul-Busan High Speed Rail (수요기반의 경부고속철도 열차운행계획 수립기법에 관한 연구)

  • Park, Jin-Yong;Chang, Justin S.
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.380-388
    • /
    • 2010
  • This paper explored an effective scheduling method for the Seoul-Busan High Speed Rail. It is important to decide train frequency influencing on scheduling method. Main factors to decide train frequency are location of station, social economic index, land use of station area and travel demand. In this paper, we focused on travel demand which is critical factor to decide train frequency. And we studied on standardized scheduling method. Simulation method is used to analyze the performance of explored method.

  • PDF

A Study on the Process of Constructing a Long-Term Railway Network Plan (장기철도망 구축계획의 구축과정에 관한 연구)

  • Seo, Kwang Seok
    • Journal of the Society of Disaster Information
    • /
    • v.8 no.3
    • /
    • pp.267-275
    • /
    • 2012
  • Long-term national railway building comprehensive review of the proposal had 100 in railway history, railway rail network plan. Planning routes for establishing a plan, but, considering the rail network, the plan was that could with the very important meaning in the What more economical route considering the costs and benefits of building a rail network under budget constraints, went through the process of background lines of business unit interval expenses to adopt a business unit interval. Especially in building the railway network, as well as the road plan was to reflect in order to build for the future railway facilities was secured examine the possibility of possible budget commitment. Budget of securing the transportation tax, gasoline tax, and other transportation facilities in order to secure and commit the current funding approach and Review Bodu possible budget scenarios based on it written. Was also enforce rail system built in reviewing the demand more than anything that can take advantage of the railway distance by railway and the merits of the competition means to compete in the form of the assumed situation. The rail network deployment plan, considering this was discussed, based on the results of the plan to establish the first annual or period of the plan change was based on the budget that was unknown.

Development of Planning Method for Double-Tracking of Single Track Railroad based on the Intelligent Rail Alignment Planning Program (ei-Rail) (지능형철도선형계획 프로그램(ei-Rail) 기반의 단선철도 복선화 계획 기술개발)

  • Kim, Jeong Hyun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.6
    • /
    • pp.837-842
    • /
    • 2022
  • The "Intelligent Railroad Alignment Design Program (ei-Rail) developed in 2013 has been adopted in the planning and the evaluation/validation of design results of oversea railroad construction projects. Target countries of Korean railroad industries requires the operating speed increase with alignment improvement and the double tracking of prevailing single track railroads as well as new railroad construction. This study is to develop an additional module for double tracking project of prevailing single track railroads in the ei-Rail. The developed method is based on the geometrics of prevailing railroad, and the definition of planned project determines the project cost based on the unit cost by work type, and provides the draft design of double track. The module was validated with a oversea case. It is then expected for oversea railroad double tracking project more efficiently in planning and the evaluation of design results.

Finding Train Frequencies and Halting Patterns Using Optimization Models : a Focus on the Line Plan for High-Speed Trains (최적화 모형을 활용한 열차 운행 횟수 및 정차 패턴 생성 : 고속 열차 노선 계획을 중심으로)

  • Park, Bum Hwan;Kim, Jang-Wook
    • Journal of the Korean Society for Railway
    • /
    • v.20 no.4
    • /
    • pp.529-538
    • /
    • 2017
  • There has been much interest in optimizing the halting patterns of high-speed trains, for example by introducing more non-stop trains to supply faster train service to the passengers, which could later bring about a discussion about introducing new high speed train service with differentiated price and service. In general, halting patterns can be considered by constructing an efficient line plan, in which all demand should be covered and the total travel time can be reduced as much as possible. In this study, we present a two-step process based on two optimization models. One is to minimize total kilometers of trains to run on each route ; this will be done using a line planning model under the assumption of all-stop patterns. Then, in the next step, the all-stop patterns are optimally decomposed into several halting patterns in order to minimize the total travel time. We applied the two-step process to the latest demand data in order to develop KTX halting patterns as well as to determine the frequency of each line and compare the current line plan with the optimized one.

A Study on TPS based on ATO for Driverless LRT (ATO 자동운전 기반의 무인운전 경전철 TPS에 관한 연구)

  • Lee, Chang Hyung;Lee, Jongwoo
    • Journal of the Korean Society for Railway
    • /
    • v.15 no.6
    • /
    • pp.609-615
    • /
    • 2012
  • TPS (Train Performance Simulation) based on ATO (Automatic Train Operation) is required for driverless LRT (Light Rail Transit) operation plan instead of typical TPS based on driver operation. In this paper, new TPS model using ATO pattern is proposed and compared with the automatic train operation result in a test line of Seoul Metro Line 6 and in a whole line of Busan-Gimhae LRT. The actual ATO pattern can be very accurately simulated by new TPS model with the introduction of 4 parameters such as commercial braking rate, jerk, station stop profile and grade converted distance. The commercial scheduled time for driverless automatic train operation can be proposed to have "Fast" mode TPS trip time plus 3 seconds/km margin recommended by Korean standard LRT specification in this paper.

A study on the Demand Variations of Gyeongchun line Upon Terminating at Seongbuk Station (경춘선 성북역 시종착에 따른 수요변화 연구)

  • Kim, Ick-Hee;Lee, Sang-Myoung;Yoon, Kyoung-Man
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1707-1714
    • /
    • 2011
  • Since 2010 December, the Gyeongchun line can provide better service than the other modes in respect of cost & time efficiency by operating electric double track from Sangbong station to Chuncheon station. However customers living in the Northern part of capital area, which there are stations of line No.1, have inconvenience to transfering twice to access Gyeongchun line. To minimize inconvenience, this study has analyzed the demand variation of Geongchun line upon changing the terminal of some trains on Gyeongchun line which reduces the number of transfer. In this study, the demand variation has been estimated by the direct demand model considering only saving time between O/D. So some additional modifications are required, because the effect of fare and accession convenience has not been considered.

  • PDF

A Study of Blind Spot Analysis for Public Transportation by Level of Service (LOS) in Public Transportation Supply Service (GIS를 이용한 시내버스와 도시철도 공급서비스 수준 측면의 대중교통 사각지대 분석에 관한 연구)

  • Chang, Kyung Uk;Kim, Hwang Bae;Kim, Young Seok;Oh, Jae Hak
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.3D
    • /
    • pp.383-389
    • /
    • 2011
  • The purpose of this paper is to analyze the blind spot for public transportation by level of service(LOS) in public transportation supply service. For the purpose, we proposed indices of service coverage area, service frequency and hours of service and analysis method for them. Service coverage area analysis is to decide station location and network design for the maximum beneficiary area. Moreover, we can use the service frequency is for the maximum service frequency decision and hours of service is for the minimum operation hours. The results of this study are applied to the plan of minimum supply service, minimum service frequency and minimum operation hours for city and national public transportation plan.

A Study on Alternatives for Activating a North Corridor of the Trans Asian Railway according to The Opening of a Cross-Border Freight Railway Service between South and North Korea (남북간 화물열차 개통이후 TAR북부노선 연계.활성화를 위한 대안 연구)

  • Yun, Dong-Hee
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.2303-2315
    • /
    • 2008
  • Finally, Musan-Bongdong section in Kyeong-Ui corridor opened on 11. DEC.2007, which is a historical event, because this connection means the restoration of 56 yrs' disconnection since 1951 and also starting point launching to connect china, Mongolia, Russia for continental railway logistic infrastructure. This is also one of master plans about the northern line in TAR, carried out by UNESCAP, so this study will touch up each country's railway status and the next tasks related with trans-continental railway such as North Korea, Russia, China. Also, this study reveal a mid-long term development strategy to improve the North Korea railroad for a continent rail link and international railroad transportation between China and Russia, and also checks the way of confrontation to the domestic infrastructure for the activation of the continent railway and the north and south, investigates concretely how to establish TAR northern part routes as soon as possible.

  • PDF

현장탐방 - 수도권고속철도(수서~평택) 터널

  • 대한기계설비건설협회
    • 월간 기계설비
    • /
    • s.311
    • /
    • pp.40-51
    • /
    • 2016
  • Rail로 세상을 연결하여 국민의 행복을 창조하기 위해 노력하는 한국철도시설공단(이사장 강영일)은 수서~평택 간 수도권 고속철도사업을 올해 안으로 완수하기 위해 노력하고 있다. 한국철도시설공단이 추진하는 수도권고속철도(수서~평택) 건설사업은 서울 강남의 수서역에서 출발하여 동탄역을 거쳐, 평택역에서 현재 운영 중인 경부고속철도와 접속하는 노선으로 총 3조7천억원이 투입됐다. 지난 2011년 착공하여 올해 말까지 완공할 계획으로, 대부분의 구간을 지하로 건설한다. 수도권고속철도가 건설되면 KTX 수서역 동탄역이 신설되어 서울 강남 강동권 및 경기 동남부 지역까지 KTX 수혜범위가 확대되고 수서에서 부산까지 2시간 2분, 목포까지 1시간 52분으로 운행시간이 크게 단축되어 이용객 증가는 물론 지역균형발전과 성장동력 확보에 기여할 것으로 예상된다. 본지는 수서역사와 율현터널 현장에서 한국철도시설공단 수도권고속철도건설단 건축설비부 신승섭 차장(기계설비 감독관)과 율현터널(제1공구) 기계설비를 시공 중인 (주)세화이엔지[대표 박현수] 윤한식 현장소장, 수서역사 기계설비를 시공 중인 (주)초록이노텍[대표 양기준] 홍승훈 현장소장, (주)서한종합건축사사무소 홍형창 기계부장(감리단)을 만나보았다.

  • PDF