• Title/Summary/Keyword: 철도 도상 자갈

Search Result 91, Processing Time 0.022 seconds

Evaluation of Geogrid-Reinforced Track substructure Effectiveness Using A Large-Scale Pullout Device (대형인발시험기를 이용한 지오그리드로 보강된 궤도하부구조층의 효율성 평가)

  • Oh, Jeongho
    • Journal of the Society of Disaster Information
    • /
    • v.10 no.1
    • /
    • pp.40-48
    • /
    • 2014
  • A number of attempts has been made to reinforce ballasted track substructure to meet the requirement of high-speed operation and effective rehabilitation of existing railroads. For the purpose of this, the use of geogrid has been applied, and the benefit of its use has been recognized via previous studies. In this study, an experimental pullout test was carried out to investigate the influence of normal stress on pullout strength of geogrid using different types of soil and geogrid. The results revealed that the pullout resistance generally tends to increase proportional to normal stress while the pullout coefficient interaction decreases, which is a function of material interface properties, such as the friction angle of soil, and interlocking condition between soil and geogrid. In addition, a methodology based on work-energy concept was proposed to evaluate effectiveness of geogrid and limitedly verified using test results.

A Study on Analysis Electrical Characteristics of Cable Lenght change about area Boundary of UM71C Audio Frequency Track Circuit (고속철도 AF궤도회로경계구간 케이블길이 변화에 따른 전기특성 분석연구)

  • Choi, Jae Sik;Kim, Hie Sik;Park, Ju Hun;Kim, Bum Gon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.7
    • /
    • pp.4849-4854
    • /
    • 2015
  • It has been often occurred for the outside components(BU, SVaC, DB) of UM71c AF track circuits to be broken down caused by some pieces of falling ice in the winter time or by infrastructure repairing equipments while facility maintenance works since 2004, opening of Kyeongbu High Speed Rail Express. In this paper, we proposed that we could move the outside components of UM71c track circuit out of wayside from present place. Then we can assure that the life time of those components would be extended. So we simulated the electrical characteristics by changing cable length using MATLAB Simulinks and we designed the compensation capacitor. Also, we obtained the same results as those of simulation by field demonstration test on site. The design specifications obtained from this field verification test could be applied in the absent section of track circuit, if only have a little more intensified research to compensate changed electrical characteristics and to redesign inner impedance of the track circuit.

A Comparative of Ground Stress with Difference of the Fixed Point Loading and Moving Wheel Loading (모형실험을 통한 고정 및 이동하중 재하 방법에 따른 노반 변형거동 비교)

  • Choi, Chan-Yong;Shin, Eun-Chul;Eum, Ki-Young;Shin, Min-Ho
    • Journal of the Korean Society for Railway
    • /
    • v.14 no.1
    • /
    • pp.49-56
    • /
    • 2011
  • In this paper, it was compared the characteristics of the stress and settlement that occur from a track on the ground using a model test and has quantitatively analyzed the difference based on stress path and effect of the rotation of principal stress. Under identical roadbed conditions, the settlement generated by moving wheel loads were found to be 6 times and 3 times larger than that from static loads and cyclic loads, respectively. The deviator stress affecting shear deformation and the length of stress path generated by moving loads were twofold or greater increase than those by static loads. Furthermore, the stress path generated by moving loads was approached more closely to Mohr-Coulomb failure criteria compared to that by static loads. Also, it was found that ballasted track was occurred about 60% of maximum stress at $40^{\circ}$ of the rotation angle of principal stress and was affected with rotation of principal stress with moving wheel loading condition.

Evaluation of Optimal Horizontal Alignment Considering Ride Comfort in Renewal of Curved Tracks (곡선부 선형개량 시 승차감을 고려한 최적평면선형 평가)

  • Um, Ju-Hwan;Choi, Il-Yoon;Lee, Jun S.
    • Journal of the Korean Society for Railway
    • /
    • v.18 no.5
    • /
    • pp.457-465
    • /
    • 2015
  • A method of evaluating the optimal alignment range while considering ride comfort when performing line renewal of curved tracks for speed-up is proposed in this study. The proposed method was applied to analyze the optimal renewal range for horizontal alignments with the smallest curve radii in the Kyung-Bu high-speed line; a parametric study on the effects of various initial design conditions on the permissible renewal range and optimal alignment range was also performed. From the analysis results, it was found that the permissible range is enhanced in proportion to the increase in the curve radius and the cant. It was also verified that a slight adjustment of the horizontal alignment enables speed-up even in the case of R7000/R8000, placed in the ballasted track section of the Kyung-Bu high-speed line.

Study on The Modification of The Transition Curve to Increase Operating Speed of Existing Line (기존선 속도 향상을 위한 완화곡선 변경 방안 연구)

  • Kim, Jae-Bok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.10
    • /
    • pp.26-32
    • /
    • 2019
  • The purpose of this study is to improve the running speed on a small-radius curved section on an existing train line. When the transition curve was extended, and the amount of movement in the horizontal direction tended to increase as the curve radius increased. The amount of increase in the transition curve extension was lowest when extending the curve radius, and the amount of horizontal movement was the lowest when changing the curve radius to a cosinusoidal curve. As a result of applying the pass rate after improvement to the Kyeongbu line, there was a time-shortening effect of 9.4 to 11.6% and a facial expression speed increasing effect when the curve radius was fixed and the transition curve was changed to a sinusoidal curve. In conclusion, the most effective way to improve the running speed on an existing train route is to change the image to concrete and to change the relaxation curve to a cosinusoidal curve. The amount of horizontal movement of the track is small, and the speed improvement effect is excellent.

Evaluation of Design Characteristics in the Reinforced Railroad Subgrade Through the Sensitivity Analysis (민감도 분석을 통한 철도보강노반 설계 특성 평가)

  • Kim, Dae-Sang;Hwang, Sung-Ho;Kim, Ung-Jin;Park, Young-Kon;Park, Seong-Yong
    • Journal of the Korean Geosynthetics Society
    • /
    • v.12 no.3
    • /
    • pp.15-22
    • /
    • 2013
  • By changing from ballasted track to concrete slab track, new type railroad subgrade is strongly required to satisfy strict regulations for displacement limitations of concrete slab track. In this study, sensitivity analysis was performed to assess the design characteristics of new type reinforced railroad subgrade, which could minimize residual settlement after track construction and maintain its function as a permanent railway roadbed under large cyclic load. With developed design program, the safety analysis (circular slip failure, overturning, and sliding) and the evaluation of internal forces developed in structural members (wall and reinforcement) were performed according to vertical installation spacing and stiffness of short and long geotextile reinforcement. Based on this study, we could evaluate the applicabilities of 0.4 H short geogrid length with 0.4 m vertical installation spacing of geotextile as reinforcement and what the ground conditions are for the reinforced railroad subgrade. And also, we could grasp design characteristics of the reinforced railroad subgrade, such as the importance of connecting structure between wall and reinforcement, boundary conditions allowing displacement at wall ends to minimize maximum bending moment of wall.

The Effect of Pile Distallation on the Reduction of Cumulative Plastic Settlement (말뚝 설치를 통한 콘크리트궤도의 누적소성침하 감소 효과)

  • Lee, Su-Hyung;Lee, Il-Wha;Lee, Sung-Jin;Kim, Dae-Sang
    • Journal of the Korean Geotechnical Society
    • /
    • v.24 no.5
    • /
    • pp.129-137
    • /
    • 2008
  • An active application of concrete track is being expected far the future constructions of Korean railroad. In comparison with the existing ballasted tract, a concrete track is very susceptible for the settlement, since its rehabilitation requires much time and cost. When a concrete track is constructed on fine-grained subgrade soil, excessive cumulative plastic settlements due to repetitive train road may occur. In this case, the settlement of the concrete track may be effectively reduced by installing a small number of small-diameter piles beneath the track. This paper presents the effect of pile installation on the reduction of cumulative plastic settlement of concrete track. A method combining experiential equation and numerical method is proposed. Using an existing experiential equation and the estimated earth pressure distribution, the cumulative plastic strain was calculated. From the results, it is verified that the effects of the pile installation is significant to effectively reduce the cumulative plastic settlement of concrete track. The reduction effects of the cumulative plastic settlement according to the pile number and pile arrangement are presented.

A Dynamic Analysis of PSC Box Bridge Varying Span Lengths for Increased Speeds of KTX (고속철 속도변화에 대한 PSC박스 교량의 경간길이 별 동적해석)

  • Oh, Soon Taek;Lee, Dong Jun;Shim, Young Woo;Yun, Jun Kwan
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.15 no.4
    • /
    • pp.204-211
    • /
    • 2011
  • A dynamic analysis procedure is developed to provide a better estimation of the dynamic responses of bridge during the passage of high speed railway vehicles. Particularly, a three dimensional numerical model including the structural interaction between high speed vehicles, bridges and railway endures to analyse accurately and evaluate with in-depth parametric studies for dynamic responses of various bridge span lengths running KTX railway locomotive up to increasing maximum speed(450km/h). Three dimensional frame element is used to model the simply supported pre-stressed concrete (PSC) box bridges for four span lengths(40~25m). Track irregularity employed as a stationary random process from the given spectral density functions and irregularities of both sides of the track are assumed to have high correlation. The high-speed railway vehicle (KTX) is used as 38-degree of freedom system. Three displacements (Vertical, lateral, and longitudinal) as well as three rotational components (Pitching, rolling, and yawing) are considered in the 38-degree of freedom model. The dynamic amplification factors are evaluated by the developed procedure under various traveling conditions, such as track irregularity camber, train speed and ballast. The dynamic analysis such as Newmark-${\beta}$ and Runge-Kutta methods which are able to analyse considering the dynamic impact factors are compared and contrasted.

A Study on Coupling Coefficient Between Rail and Reinforcing Bars in Concrete Slab Track (콘크리트 슬래브궤도에서 레일과 철근 사이의 결합계수에 대한 연구)

  • Kim, Min-Seok;Lee, Sang-Hyeok;Lee, Jong-Woo
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.3
    • /
    • pp.405-411
    • /
    • 2009
  • Railway signaling system in a rapid transit using the ATC system the approved a speed limit to a train and a part of signaling system in a metro approved a distance which is possible to move. Referring to the way of transmitting train control information, there are the one transmitting it to the on-board system of a train using the direct track, the another transmitting it establishing an instrument, and the other transmitting an instrument by a railway track. The one is the method using the direct track as a conductor for composing the part of the track and attaining the information controlling a train by transmitting a signal to the track. It is used for the high-speed railway and the subway. The method using the track attains information by transmitting it to returned information, and the on-board system of a train attains it by magnetic coupling. Because many reinforcing bars on the concrete slab track are used, interaction between a rail and a reinforcing bar that is not produced on ballast track is made. Due to the interaction, the electric characteristic of rail is changed. In the current paper, we numerically computed the coupling coefficient between the rail and the reinforcing bar based on the concrete slab track throughout the model related to the rail and the reinforcing bar using the concrete slab track that is used in the second interval of the Gyeongbu high-speed railway, and we defined the coupling coefficient not changed in the electric characteristic of rail in the condition that there is no interaction between the rail and the reinforcing bar.

Study of the Long-Term Behavior Characteristics of Roadbed on Concrete Track of High-speed Railway (고속철도 콘크리트 궤도상 토공노반의 장기거동 특성 연구)

  • Choi, Chan-Yong;Jung, Jae-Hyun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.4
    • /
    • pp.8-16
    • /
    • 2018
  • This study examined the long-term behavior of a roadbed using high-speed railway concrete track and roadbed measurement data and evaluated the long-term performance of the track and roadbed. Recently, high-speed railway track type has been adopted as a concrete slab. On the other hand, the concrete track is vulnerable to roadbed settlement. In the case of gravel tracks, it is easy to restore the original state by maintenance even if the roadbed settles. On the other hand, in the case of the concrete track, if excessive settlement of the roadbed occurs, cracks are generated continuously on the slabs and sleepers, resulting in greatly reduced usability. For this reason, it is difficult to restore the original state only by partial maintenance. In this paper, a long-term performance evaluation was carried out on a concrete track during operation by monitoring the measurement data of sensors buried from the beginning of construction for approximately 3 years after the high-speed railway opened. Performance evaluation methods include a performance evaluation of track/roadbed when the train passes, long-term track and roadbed performance evaluation, analysis of the track/roadbed effect on long-term settlement and analysis of the factors influencing long-term settlement. The trail response of KTX-Sancheon was greatest in the track/roadbed performance evaluation by train. The results of the long-term track and roadbed performance evaluation were measured within the standard values. The track and roadbed performance impact assessment with long-term settlement was strongly related to TCL settlement. The influences of the water content and groundwater level were verified by analyzing the external factors of long-term settlement. Through such a method, the stability of a track/roadbed can be secured.