• Title/Summary/Keyword: 철도편익

Search Result 61, Processing Time 0.031 seconds

The Study on Determination of Benefit Factor as Constructing Traffic Facilities Using ANP (ANP기법을 이용한 교통시설 건설사업의 편익항목 선정에 관한 연구)

  • Kim, Man Kyeong;Jung, Hun Young;Lee, Sang Yong
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.1D
    • /
    • pp.41-47
    • /
    • 2006
  • The construction of traffic facilities has generated a variety of problems in the equality and efficiency when it would be planed and evaluated. One of the reasons for these phenomena isn't the definition of an objective standard about benefit items. Thus, results of evaluation couldn't give a demonstration of confidence. But, the traffic facility construction and its operation costs are securely appeared. Therefor, it will be demonstrated to decide the benefit items in this study. Before deciding the items, user's satisfaction evaluation and economic analysis would be carried. We find out subway user's satisfaction higher than load traffic mode user in satisfaction evaluation, while subway's economic feasibility is lower than load facility, as a result of B/C analysis. In this inconsistent results, we found out that the benefit value is a little lower because of indefinite standard of it's items as comparing Busan Metropolitan City's population with subway's modal split ratio. Accordingly, we enumerate some benefit items in the case of feasibility evaluation as constructing traffic facility. And each of evaluation items' weight is estimated by using ANP. We found out that the weight value of accessibility has the highest one, that of punctuality has second, that of travel time has third, and benefit items according to improvement of user's traffic condition have much more important than those which were considered in the existence economic analysis.

The Study for an Improved Methodology of Rail Investment Rating System (철도투자평가체계 개선방안의 고찰)

  • Roh, Byoung-Kuk;Kim, Young-Bea;Jin, Hak-Ki
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2192-2204
    • /
    • 2011
  • Recently, The government is actively transit road-oriented Traffic System to the eco-friendly and high-efficiency railroad-oriented transportation system for the sustainable green growth. The second plan of Nationwide Railway Network which has been officially announced rearrange to integration, multi-core, open architecture country by the railway network and integrate to the one mega city that rink an important city in one hour 30 minute. But the railroad industry is disadvantageous when it compares with the road industry on the ground that railroad industry peculiarities(a cost-benefit analysis, an environment value, etc) have not reflected in the (preliminary) feasibility study for SOC industry. The government establish Improved methodology of Rail Investment Rating System and improved preliminary feasibility study in railroad project by introduction many content(analysis periods, rate of discount, the benefits of shortening of transit hours, the estimation of traffic accident reduction benefits, investment cost of vehicle substitution and operation and maintenance cost of high speed rail) about the Improved methodology of Rail Investment Rating System. This study is intended to consideration the key content that was included in the Improved methodology of Rail Investment Rating System. In addition, the points to be considered for additional study have been reviewed in this study. We hope we will carry out make a reasonable and objective Rail Investment Rating System and to perform the railway industry of the virtuous cycle such improvement plans are reflected at a hereafter railroad section.

  • PDF

PRT Benefit Estimation Study; Focused on Nan-Gok line (PRT시스템 도입시 편익산정 연구; 난곡노선을 중심으로)

  • Lee, Jin-Sun
    • Journal of the Korean Society for Railway
    • /
    • v.14 no.4
    • /
    • pp.370-375
    • /
    • 2011
  • In this paper, as a follow-up PRT studies of "J. Lee & K. Kim[2]", in terms of public transportation systems, economic feasibility of PRT systems was investigated. Based on previous studies, PRT demand was estimated and the required number of PRT vehicles has been calculated and the benefit was estimated. To ensure the economic feasibility, construction cost of a PRT system should be the level of 8 billion won per km, and the annual operating costs of the PRT system construction should be approximately 4.63% level. As a result, how much to reduce PRT construction costs, depending on whether decisions are considered to be economically feasible. Thus, PRT technology development will be conducted by targeting the most lightweight and by minimizing the infrastructure and vehicles of PRT.

Economic Analysis on Transshipment and the Gauge-Adjustable System for Trans-Continental Container Transportation (대륙연계 컨테이너 수송을 위한 환적방식과 궤간가변방식의 경제성 비교)

  • Chung, Kwang Woo
    • Journal of the Korean Society for Railway
    • /
    • v.17 no.5
    • /
    • pp.373-380
    • /
    • 2014
  • With a view to the commercialization of the Korean automatic variable-gauge bogie in the Eurasia railway system, the aim of this research was to perform an economic analysis concerning the possible introduction and operation of this bogie at the present time. For this purpose, we compared the possible types of freight connection service for container transportation, transshipment and the gauge-adjustable system, estimating the total life-cycle cost (LCC) incurred by each system, depending on type and quantity, over the whole process of acquisition, operation, maintenance and disposal. Based on this, we presented a case-by case analysis. Furthermore, in estimating economic feasibility, we analyzed the cost-benefit ratio taking into account not only the objective LCC, but also the reduced time required for the gauge-change and customer convenience. After estimating the LCC and analyzing the cost-benefit ratio of the respective systems, we demonstrated the economic superiority of view of the gauge adjustable system.

Benefit-Cost Analysis of BIM Application - Case Study on Osong Test Line Railway - (철도인프라 BIM 적용에 따른 비용편익 효과 분석 - 오송 철도종합시험선로 사례를 중심으로 -)

  • Kim, Hwan-Yong;Shin, Min-Ho;Han, Sang-Cheon;Choi, Young-Woo;Kim, Chang-Ho
    • Journal of KIBIM
    • /
    • v.8 no.4
    • /
    • pp.41-48
    • /
    • 2018
  • Recent technological improvements have made abundant changes in construction industry. In specific, some technical applications, such as Building Information Modeling (BIM) opens up many possibilities. Some studies have articulated the use of BIM and its advantages in construction, but most of them are theoretical, not practical. This study is to provide an insight to such obstacles in BIM research. By investigating a real project that could utilize BIM in planning and construction phases, the authors try to investigate a possible outline of advantages in BIM implementation. The study area was set to a railway construction site in South Korea. The site covers a multiple railway tracks, stations, telecommunication facilities, infrastructure facilities, railway structures, and so numerous. In the site, the authors have identified 12 errors in 7 projects that could be prevented if BIM was utilized before the construction.

Raynoise를 이용한 철도소음의 예측에 관한 연구

  • 김태구;박민수;박철우;김광일
    • Proceedings of the Korean Institute of Industrial Safety Conference
    • /
    • 2003.10a
    • /
    • pp.286-292
    • /
    • 2003
  • 철도는 1960년대 산업화 이후 급속한 도시화 과정에서 인구의 집중, 도시의 비대화로 인해 늘어나는 교통의 수요와 대량운송 및 정시운행이라는 장점으로 국가산업의 발전과 국민편익에 편리함을 제공하는 등의 지대한 공헌을 하였다. 그럼에도 불구하고, 이러한 발전과 편리함 속에 소음과 진동의 환경공해를 유발하여 철도 주변에 위치하고 있는 거주시설 및 상업시설 등의 거주민들이 생활을 영위함에 있어 불쾌감, 수면방해, 집중력 감소, 시설물의 피해 등의 영향을 주고 있다.(중략)

  • PDF

Review of Railway Projects Evaluation Methodologies considering the Benefit Incidence (편익귀속을 고려한 철도사업의 평가방법론에 대한 고찰)

  • 정병두;박정욱;김경철
    • Proceedings of the KSR Conference
    • /
    • 1999.11a
    • /
    • pp.65-72
    • /
    • 1999
  • In this paper, we reviewed the evaluation methodologies of railway project considering the benefit incidence. Generally railway projects are much more reduced tile energy consumption, traffic accident and environmental pollution than road projects. But conventional B/C analysis of railway project does not measured including those benefits. Also there is a few attention to an incidence of benefits producing from railway construction. So we developed the evaluation method of railway project contained the railway oriented benefits and also considered of the benefit incidence producing from railway construction.

  • PDF

Estimation of Willingness-to-pay for Mitigating Crowdedness in High-speed Rail Trains (고속철도 차량 내 혼잡도 완화에 대한 지불 용의액 추정 연구)

  • Lee, Jang-Ho;Kim, Dong-Sun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.2
    • /
    • pp.379-387
    • /
    • 2017
  • As the average load factor of High-Speed Rail (HSR) trains increased up to 98%, it caused uncomfortable crowdedness in the cabin and deteriorated the level of service to the HSR users. In this paper, we estimated the willingness-to-pay (WTP) of the HSR users for mitigating the crowdedness in the cabin. The contingent valuation method based on the stated preference data was used and the tobit model was applied for the estimation of WTP. It can be concluded that WTP for mitigating the crowdedness in the HSR trains is proportional to the congestion level of train and income level of user. Males, first-class users, not-assigned ticket users, and monthly pass users have relatively higher WTPs, while homemakers, travelers in weekends, commuters and leisure travelers have relatively lower values. The results can provide the fundamental information to estimate the benefits of mitigating crowdedness or the magnitude of governmental subsidy to railway operators for additional introduction of HSR trains.