The Analysis of Ground Behavior on the Crossing Construction Under Railroad Using Field Measurement (철도지하횡단공사시 현장계측을 통한 지반거동 분석)

  • 엄기영;신민호;김지훈
    • Proceedings of the KSR Conference
    • /
    • 2001.10a
    • /
    • pp.546-551
    • /
    • 2001
  • We analysed the affection to subgrade that railway underground crossing construction make with studying displacement of subgrade of each construction methods and processing of Front jacking method and Pipe roof method with already-measured data(during the construction) and additionally-measured field test data in railway underground crossing construction. We measured vertical and horizontal displacement at two construction places of front jacking method and pipe roof method each, and we analysed the results of the measurement at each stage of construction to applied to the excution of construction.

  • PDF

A case study on perforation under Daejeon station building by Front-Jacking method (Front-Jacking공법에 의한 대전역사 하부 관통사례)

  • Kim, Yong-Il;Hwang, Nak-Yeon;Jeong, Du-Seok;Cha, Jong-Hwi;Lee, Nae-Yong
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 2006.03a
    • /
    • pp.195-203
    • /
    • 2006
  • The crossing construction under railroad have two methods which are cut and cover and trenchless method. first, cut and cover method is an extremely limited method concerning non-running time. Whereas, trenchless method is free from restriction such as train speed and running time, and has the strong points of safe and rapid construction. Front Jacking method, one of the trenchless methods, is frequently applied recently due to its stability during construction and vantage of assuring schedule reliability. The procedure is that after minimizing interlocking friction with structure and earth pressure due to jacking the small steel tube, pulling the precast box manufactured at the field in the ground using PC strand and hydraulic Jack. This method is able to be applied regardless of section size and length of box and condition of ground. And that is also pro-environmental. This paper presents the case of Daejeon E. W. perforate Road Project applied with the Front Jacking method.

  • PDF

Design of the Railbeam Lengths at the Roadbed (철도 레일빔 설계법에 대한 연구)

  • Jung, Hyuksang
    • Journal of the Korean GEO-environmental Society
    • /
    • v.17 no.1
    • /
    • pp.21-28
    • /
    • 2016
  • This paper deals with contents on the estimation of rail beam from the geotechnical engineering aspect. Rail beam is reinforced rail installed on the inside and outside of rail to prevent differential settlement during the construction period of railroad crossing construction. Such rail beam is frequently being installed to ensure stability of existing railroad facilities because of increasing constructions of underground structures crossing railroad in recent. However, there is a difficulty in design due to lack of design standard on rail beam length. Furthermore, derailing accidents are also occurring as a result of rail beam length shortage. Accordingly, this paper presented flow chart based on the classification into soil ground and bedrock ground for the rail beam length estimation. In addition, case study was conducted on rail combination and location through which effective rail combination and location were ensured.

The Analysis of Ground Behavior on the Crossing Construction Under Railroad Using In-door Model Experiment (실내모형실험을 이용한 철도지하횡단공사에서의 지반 거동 분석)

  • 엄기영;정흥채;김지훈
    • Proceedings of the KSR Conference
    • /
    • 2001.10a
    • /
    • pp.540-545
    • /
    • 2001
  • When a testing body is being inserted to the ground by Front Jacking Method, the influence of friction forces around the body plays important role in the characteristics of whole ground behavior. In the study, the Front Jacking Method that most frequently used in Korea who applied with experimental way. And the characteristics of ground behavior that caused by the friction that acts to the upper slab was analysed for the basic data that can be utilized for real scale experiment.

  • PDF

A Case Study on Construction of Front-Jacking method in Daejeon E.W. perforate Road Project (대전 동서관통도로 Front-Jacking공법 시공사례)

  • Kim Yong-Il;Hwang Nak-Yeon;Cha Jong-Whi;Jang Sung-Wook;Lee Nai-Yong
    • Proceedings of the KSR Conference
    • /
    • 2005.05a
    • /
    • pp.646-654
    • /
    • 2005
  • The crossing construction under railroad have two methods which are cut and cover and trenchless method. First, cut and cover method is an extremely limited method concerning non-running time. Whereas, trenchless method is free from restriction such as train speed and running time, and has the strong points of safe and rapid construction. Front Jacking method, one of the trenchless methods, is frequently applied recently due to its stability during construction and vantage of assuring schedule reliability. The procedure is that after minimizing interlocking friction with structure and earth pressure due to jacking the small steel tube, pulling the precast box manufactured at the field in the ground using PC strand and hydraulic Jack. This method is able to be applied regardless of section size and length of box and condition of soil. And that is also pro-environmental. This paper presents the case of Daejeon E. W. perforate Road Project applied with the Front Jacking method.

  • PDF

한국전력공사 전력연구원 "BOX 구조물자동화 설계시스템(BOXCAD)"에 대한 소개

  • 송영철;우상균
    • Computational Structural Engineering
    • /
    • v.10 no.2
    • /
    • pp.34-39
    • /
    • 1997
  • BOXCAD Vㄷㄱ.2.00의 개발을 통하여 얻은 결론은 다음과 같다. 1) 다양한 설계조건 즉 설계차량하중, 토피, 지하수위, 사용재료의 강도 등의 변화에도 쉽게 자동화설계가 가능하도록 설계시스템이 개발되었다. 2) 개발된 설계시스템은 도로교 표준시방서와 콘크리트 시방서의 하중계수에 의한 방법을 모두 포함하고 있으며, 설계시방서에 따른 변화에도 신속하고 용이하게 대처할 수 있도록 개발되었다. 3) 개발된 본 설계시스템에 국부적인 기하조건, 설계하중, 구조세목만 보완하면 전력구 외에도 발전소의 배수 BOX구조, 도로 및 철도 횡단용 BOX구조, 지하차도 및 보도, 하수도 및 배수 BOX구조, 분류하수관거, 지하철 BOX구조 등의 자동화설계에도 작용할 수 있도록 시스템이 구축되었다. 4) 본 연구에서 개발된 자동설계시스템은 단면의 산정, 설계도면의 제작기능은 물론 설계 정보의 데이터베이스 기능이 있으므로, 실무에서 활용할 경우 설계도면 재료량 산출 및 설계정보의 효율적인 관리가 가능할 것으로 사료된다.

  • PDF

A Study on the Cost-Benefit Analysis for the Construction Method of Underground Railway Crossing (철도지하횡단공사 공법의 비용.편익 분석에 관한 연구)

  • Seok, Chong-Chen;Shin, Min-Ho;Eum, Ky-Yong;Kim, Mu-Il
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.407-413
    • /
    • 2006
  • Railways are very important to get stability of railway structure as transportation system carrying a lot of passengers and freight. These days the construction of underground railway crossing such as expansion of new roads, construction of subway and gas pipe is increasing because of economic and social development. But these kinds of construction didn't take into account Cost-benefit analysis of railway which has the most important aspects of railway safety, so the results of construction didn't get a good evaluation. This study adapt Cost-benefit analysis to evaluate the economic validity of underground railway crossing. This study adjust about Cost-benefit analysis of railway part, and analyze the new method and technology of underground railway crossing constructed by Korean National Railroad and Railway Network Authority. Also this study divide between high frequency line and low frequency lineusing B/C, NPV, and IRR analysis. After analysis, B/C ratio method is the most suitable method among B/C, NPV, and IRR analysis method. Therefore this study can express economic benefit quantitatively and decrease the cost by adapting Cost-benefit analysis, and can clearly express the construction feasibility and investment effects of construction of underground railway crossing method.

  • PDF

Safety Evaluation Method for Ground Ammunition and Explosive Storage Facilities due to Underground Tunnel Blast (지하시설 굴착공사에 따른 탄약저장시설 안전성 평가방법 연구)

  • Park, Sangwoo;Kim, Kuk-Joo;Park, Young-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.19 no.4
    • /
    • pp.331-339
    • /
    • 2019
  • Recently, expansion of urban and social infrastructures is planned to go through the transfer of military facilities or crossing the infrastructures via underground tunnels. However, when crossing facilities such as ammunition and explosive storages, a high level of safety assessment is required to prevent an accidental explosion of ground ammunition. In this study, a case study was conducted to evaluate the effect of blasting for the construction of tunnel on the ground ammunition facilities. The design section of Sinansan train operated by the Korea Railroad Authority with agreement of the Ministry of National Defense was selected. For the purpose of this study, the vibration velocity due to explosion was predicted by using GTS-NX, a numerical analysis program. Through literature review, it was confirmed that the vibration velocity of 0.2cm/sec can be a safety evaluation standard. These safety evaluation indicators and procedures used in this study can be utilized as an index of safety evaluation in the planning of social infrastructures that cross the ammunition facilities in the future.