• 제목/요약/키워드: 철도안전프로젝트

검색결과 19건 처리시간 0.023초

국가철도연구개발프로젝트의 효과적인 수행을 위한 생명주기모델 개발에 관한 연구 (A study on the Life Cycle Model to effectively conduct the National Railway R&D Project)

  • 최요철;이재천
    • 시스템엔지니어링학술지
    • /
    • 제4권1호
    • /
    • pp.11-18
    • /
    • 2008
  • As a government agency or the Government-donated Research Institute or industrial research institute is intended to develop a product or to construct a system such as a railway safety systems by research and development process, a life cycle model leading a product development or a research and development is essential to them to systematically and effectively progress it. In this paper, the refined life cycle model to effectively conduct the national railway safety project consists of the life cycle phases and their detail descriptions with reference to other life cycle model in the international standard and the other national guidance and other industrial domain such as ship-building, weapon system, and aerospace areas, the proposed life cycle model in the paper considerably reflects the characteristics of the traditional research and development project in railway safety domain. A guidance of a life cycle model which based on lots of the life cycle model in other domains proposes additionally.

  • PDF

철도터널 화재 위험도 평가 프로그램의 개발 및 적용사례 (Development of Railway Tunnel Fire Risk Assessment Program and its Application)

  • 윤성욱;박종헌
    • 한국재난관리표준학회지
    • /
    • 제2권1호
    • /
    • pp.57-64
    • /
    • 2009
  • 철도터널의 건설이 증가하고 장대화 됨에 따라 터널내에서의 화재 위험에 대한 사회적 관심이 증대되고 있는 실정이다. 하지만 현재까지 이러한 화재 위험에 대해 정량적으로 평가하기 위한 연구는 부족한 편이고 특히, 각 변수들의 불확실성을 고려하여 화재위험도를 정량적으로 평가하는 방법에 대해서는 거의 연구된 바가 없다. 따라서, 본 연구에서는 Event Tree 기법을 이용한 기존의 확률론적 위험도 평가기법을 바탕으로 몬테카를로 시뮬레이션 기법을 이용한 변수들의 불확실성을 고려할 수 있는 기법을 추가하여 철도터널의 정량적 위험도 평가기법을 개선하고자 하였으며 실제 프로젝트에 적용함으로써 그 유효성을 검증하고자 한다.

  • PDF

공공교통 전동차 안전운행을 위한 RIMS 프로젝트 적용의 성공요인 연구 (A Study on the Successful Factors in the Application of RIMS Project for the Safe Operation of Rolling Stocks in the Public Transportation)

  • 이강원;방연근;손영진
    • 한국철도학회논문집
    • /
    • 제9권5호
    • /
    • pp.555-560
    • /
    • 2006
  • This study finds out and suggests success factors for the application of RIMS project through the case study of Seoul Metro and literature survey. The successful application of RIMS needs expert knowledge and concept of BOM, standardization of maintenance planning, check lists of heavy maintenance inspection, organization structure of rolling stock maintenance offices, material management system of warehousing and the process of parts repairing between offices, connection of material ordering system, problem solving of circular spare parts administration among inspection, maintenance, and material organizational units, systemic serial number management of parts with RFID, daily closing diary connected with work process chart, and sufficient period of RIMS's test run. RIMS contributes to real time management of rolling stock maintenance, transparency of management, reliability of train operation, customer satisfaction, and management innovation.

철도종합안전기술개발사업에서 SEMP의 활용을 통한 프로젝트 관리방안 (On the Project Management utilizing the Systems Engineering Management Plan in the Railroad Safety Technology R&D Program)

  • 김재철;이재천;조연옥;김상암;한순우
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2010년도 춘계학술대회 논문집
    • /
    • pp.1798-1805
    • /
    • 2010
  • The Railroad Safety Technology R&D Program has been supported by the Ministry of Land, Transport and Maritime Affairs. The Program consists of dozen or more projects and thus is quite complex, which requires effective project management. This paper is discussing how to effectively manage the railroad safety technology R&D program based on systems engineering management plan (SEMP). The key issues dealt in this paper include the SE management, requirements management, verification and validation, integrated data base management, and traceability management. To achieve the goal, we first defined an appropriate SE process to be adopted in the program and the result was documented in the systems engineering management plan. According to the process defined, we set up the environmental frame in database. Using the database and SEMP, each project of the program was verified with respect to the corresponding requirements utilizing the traceability. All these efforts were carried out using a computer-aided SE tool, which enables efficient management of complex database.

  • PDF

공공교통 전동차 안전운행을 위한 RIMS 프로젝트 적용 제고 (RIMS project application raising for a public transportation immediacy operation)

  • 손영진;이강원;방연근;이도선
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2005년도 추계학술대회 논문집
    • /
    • pp.897-901
    • /
    • 2005
  • 21 century as the knowledge information anger society now our society industry of all fields the rolling stock maintenance conservative standardization enterprise where information anger is being turning out construction Ministry of Transportation supported with continuous development of the supply section substitution quantity information processing system which the information highway is quick and the Korean railroad technical research worker propelled the enterprise as the subjective agency, it contracted this for a vehicle field information anger system construction in link of the enterprise our construction and an agreement, information technique composed the consortium t9day and it propelled a system codevelopment. The SMSC who is a front-runner of Maj loach city railroad operation agency to 'here business relates with a vehicle field maintenance conservativeness an immediacy operation and generally and information anger it will plan it will integrate it will own jointly and business efficiency and in the dictionary an obstacle occurrence electromotive car maintenance conservative information and it will improve only maintenance conservativeness of preventive maintenance of the electromotive car it knows it will prevent to construct the maintenance conservative system of the preventive maintenance, it applied the RIMS project to sleep.

  • PDF

각국의 레일결함 관리 기준 비교 (Comparative Study of Foreign Countries on Management Rules on Rail Defects)

  • 윤경민;송명규;이진옥;임남형
    • 한국방재학회:학술대회논문집
    • /
    • 한국방재학회 2011년도 정기 학술발표대회
    • /
    • pp.184-184
    • /
    • 2011
  • 선로의 레일은 재료적인 특성과 현장의 많은 주변 요소에 의한 불확실성이 매우 높은 시스템으로 결함의 위험이 상존한다. 결함 발생과 조치에 따라 영업손실로 이어지므로 레일 결함 발생과 동시에 적절한 조치가 요구된다. 따라서 레일결함 발생 시 레일교환시기를 파악하는 것이 선로관리비용을 줄일 수 있으며 레일교환에 대한 신속한 판단을 위함 관리기준을 정립하는 것이 요구된다. 현재 국내에서 고속선의 경우 관리 기준이 있으나, 일반철도는 없는 실정이다. 본 연구는 차후 일반철도 180km/h 속도상승을 계획하고 있는 현 시점에 국외 관리기준을 분석하여 결함관리기준을 정립에 기여하고자 한다. 국내의 경우, 2004. 4. 1 프랑스 기술을 전수받아 개통한 고속선은 프랑스 레일관리기준을 적용한 "레일손상 등급별 관리기준"을 제정하여 레일관리를 시행하고 있다. 국외의 경우, INNOTRACK프로젝트 안에서 관련된 다른 IM(Infrastructure Managers, 사회기반시설 관리자들)에게 최근의 활동과 변화의 이해를 제공하기 위해서, 선택된 결함들의 최소조치들의 조사가 Network Rail, OBB, Prorail, Banverket 그리고 DB에서 수행되고 있으며 UIC 지침에도 포함되고 있다. 모든 최소조치 원칙은 초음파나 육안에 의해 발견된 길이나 초음파 또는 와류탐상기(eddy current system)를 이용한 깊이에 대한 제한(limits)을 준다. 또한 침목과 이음매 또는 용접부에 관한 위치에 관한 결함의 제한이 있다. 명시된 기간은 즉각적일 수도 있으며, 보통 속도 제한이나 비상 죔쇠(Clamps)같은 경감시키는 수단에 적용될 수 있으며, 또는 더 긴 기간이 될 수도 있다. 더 긴 기간들은 수리나 레일 교체를 통하여 선로로부터 결함이 제거되어야 하는 최대의 시간이다. 본 연구에서는 Transverse Breaks, Squats, Head Checks 3가지 결함 유형에 대해 각 국에서 사용하는 최소 조치를 비교하여 분석하였다. 분석결과, 유럽에서는 레일결함에 대하여 깊이 있는 연구를 통하여 관리기준을 정하여 관리하고 있으며 이에 따라 상세하고 구체적인 레일 관리가 가능하므로 효율적이며 안전성이 제고되는 것으로 판단된다. 차후 일반철도의 180km/h 속도상승을 계획하고 있는 현 시점에서 국내철도 일반선 여건에 적합한 레일결함관리기준을 정립하기 위한 추가적인 연구가 필요할 것으로 판단된다.

  • PDF

하이브리드 궤도회로 시험방법 및 절차에 관한 연구 (Study on Test methods and Procedures of Hybrid Track Circuit)

  • 권부석;정호형;이기서;이창룡
    • 한국전자통신학회논문지
    • /
    • 제9권3호
    • /
    • pp.335-342
    • /
    • 2014
  • 본 논문에서는 하이브리드 궤도회로(Hybrid Track Circuit : HTC)의 실용화를 위한 시험방법과 그 절차에 대하여 연구하였다. 침목이나 도상 등 다양하고 특수한 선로 환경과 RFID 태그와 리더기, 안테나 구조를 고려한 시험방법을 제시함으로서 하이브리드 궤도회로의 서울메트로 구간 시범설치와 고속열차 구간 적용 연구에 활용이 가능하다. 또한 하이브리드 궤도회로 개발 프로젝트의 산출물 간 인터페이스와 설치방법 및 시험절차 등 안전하고 신뢰성 높은 결과를 도출하기 위한 방법을 제시하였다.

시뮬레이션과 엔트로피 척도를 이용한 철도 차량기지 대안 선정 (Decision Making for Train Maintenance Facility using Simulation and Entropy measurement)

  • 김경록;천현재;이홍철
    • 한국산학기술학회논문지
    • /
    • 제11권8호
    • /
    • pp.2809-2817
    • /
    • 2010
  • 본 최근 철도 산업이 국가 중심 산업으로 부상하면서 이 분야의 학문적 관심이 높아지고 있다. 특히, 철도 산업의 규모가 커짐에 따라 승객과 화물의 안전한 수송이 강조되고 있으며 이를 위해 철도 차량의 정기적인 검수 및 청소를 담당하는 차량기지의 건설이 증가하고 있다. 하지만 철도 차량기지 건설은 막대한 투자비용과 시간이 소요되며 효율적인 설계 및 시공을 위해 고려해야 할 조건이 많다. 따라서 본 논문에서는 복수의 차량기지 설계 대안들 중 가장 효율적인 설계안을 찾기 위해 시뮬레이션을 사용하여 분석하였다. 시뮬레이션 분석은 시설의 목적을 최대한 반영 할 수 있는 종속 변수를 선정 후 Warm-up 분석을 하였고, 분석 이후 안정화 상태의 종속 변수 평가치를 대안 별로 추출하였다. 그리고 시뮬레이션 실험에 의해 얻어진 각 종속 변수의 평가치는 다 속성 의사 결정 방법을 통해 대안 선정에 사용 되는데, 기존의 다 속성 의사 결정 방법은 절차적으로 복잡하거나 의사 결정자의 주관적인 능력에 기대는 단점을 가진다. 그러나 엔트로피 척도를 활용한 대안 선정은 의사 결정자에게 신속하고 객관적인 방법으로 대안 선정을 할 수 있게끔 도와준다. 따라서 본 연구에서는 철도 차량기지 설계의 신속한 최적 설계안 도출을 위해 엔트로피 척도를 이용하였으며 이는 차량기지 설계 프로젝트처럼 신속하고 객관적인 의사결정이 필요한 상황에서 매우 유용함을 보여주었다.

터널 현장 계측결과를 통한 강관보강 그라우팅의 거동 메커니즘 (Mechanism of steel pipe reinforcement grouting based on tunnel field measurement results)

  • 신현강;정혁상;이용주;김낙영;고성일
    • 한국터널지하공간학회 논문집
    • /
    • 제23권3호
    • /
    • pp.133-149
    • /
    • 2021
  • 본 논문은 터널 굴착 시 굴착면의 안정성 확보를 위해 매우 활발히 적용되고 있는 강관보강 그라우팅의 거동 메커니즘을 실제 현장의 계측결과를 이용하여 연구한 결과를 수록하였다. 계측방법은 12 m의 강관에 형상변위계와 변형률계를 부착하여 실제 터널면에 보강을 시행한 다음 강관의 변형과 응력의 계측값을 분석하여 거동 특성을 파악하였으며, 6 m마다 강관이 중첩되는 것을 고려하여 7 m 굴착 시까지의 계측결과를 활용하였다. 또한, 허용응력이 다른 강관(SGT275와 SGT550)을 적용하여 강도차이에 따른 강관 보강재의 거동 특성도 확인하였다. 굴착면에 강관을 설치하고 최초 1 m 굴착 후 다음 굴착이 진행되기 전까지 7시간 동안의 강관 거동을 분석한 결과 굴착 이완하중에 따른 아칭효과로 응력이 재분배되는 거동 특성을 확인할 수 있었다. 1 m씩 굴착됨에 따라 3차원적인 이완하중의 응력분배로 인해 굴착된 구간은 4~6 m 굴착 시 가장 큰 변형을 나타내었다. 이러한 계측을 통해 굴착 전방지반의 설치된 강관에도 변형과 응력이 발생되는 것을 확인할 수 있었다. 또한, SGT275강관(항복강도 275 MPa)과 SGT550강관(항복강도 550 MPa)의 거동을 비교한 결과 변형량의 차이는 최대 18배, 응력은 최대 12배 정도 차이가 발생되어 강도가 큰 강관일수록 이완하중에 대응이 유리한 것으로 나타났다. 본 논문에서는 실제 터널 굴착에 따른 강관의 계측결과를 이용하여 이완하중의 아칭효과에 대응하는 강관 보강 그라우팅의 거동 메커니즘을 확인할 수 있었고, 그 결과를 본 논문에 수록하였다.