Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
/
v.24
no.5
/
pp.399-408
/
2006
Railroads have been developed as public transportation and made a great contribution to national economic growth. But after the mid-20th century, its qualities have been getting low because of focusing on the investment and development of cars and airplanes. Its role which is getting the excellent merits on the mass transportation, rapid transit, safety, state period, energy efficiency, and prevention of environmental pollution has been reconsidered. Elements of horizontal alignment are needed in the case where the existing railroad lines should be improved or moved. If its design drawing was lost or damaged, it is impossible to recover. It is not easy to repair for it as disasters. We must understand an existing railroad line to bring a function included a basic geography situation. In this study, we acquire, analyze, and process the digital images of the railroad and then reappear shape of three dimension. And we expect to be utilized to construct the facility information by extracting the alignment elements of existing railroad lines reversely.
Kwon, Tae Ho;Park, Sang I.;Shin, Min Ho;Lee, Sang-Ho
Journal of the Computational Structural Engineering Institute of Korea
/
v.30
no.6
/
pp.507-514
/
2017
As BIM has been widely used in the field of architecture, efforts to apply BIM to civil engineering structures are increasing rapidly. Since commercial BIM softwares are focused on building structure, it is difficult to apply to alignment-based civil infrastructures. In this study, we proposed a method to generate an information model that reflects cant by sharing information between alignment-centered modeling tools and BIM authoring tools to manage information of railway track. The railway track modeling process consists of classifying structures into continuous and non-continuous structures, creating continuous structures by alignment-centered modeling tools, and using the shared alignment information to generate information model of the non-continuous structures. Non-continuous structures were generated by an algorithm that calculates the position and rotation information of each structure based on discretized railway alignment and cant information transmitted to the BIM authoring tools. The availabilities of proposed method were studied by applying to the osong test-line. Using the test model, it was shown that the objects were identified, the properties were extracted, and the quantities of each structure were calculated.
Kwon, Tae Ho;Park, Sang I.;Seo, Kyung-Wan;Lee, Sang-Ho
Journal of the Computational Structural Engineering Institute of Korea
/
v.31
no.6
/
pp.339-346
/
2018
An Industry Foundation Classes(IFC), which is a data schema developed focusing on architecture, is being expanded to civil engineering structures. However, it is difficult to create an information model based on extended IFC since the BIM software cannot provide support functions. To manage a railway track based on the extended IFC, this paper proposed a method to create an alignment-centered separated railway track model and convert it to an extended IFC-based information model. First, railway track elements have been classified into continuous and discontinuous structures. The continuous structures were created by an alignment-based software, and discontinuous structures were created as independent objects through linkage of the discretized alignment. Second, a classification system and extended IFC schema for railway track have been proposed. Finally, the semantic information was identified by using the property of classification code and user interface. The availability of the methods was verified by developing an extended IFC-based information model of the Osong railway site.
Kim, Hyun Ki;Kim, Sung Jin;Choi, Chan Yong;Hwang, Soo Beom
Journal of the Korean Society for Railway
/
v.17
no.2
/
pp.106-113
/
2014
In this study, a practical evaluation technique to detect the deterioration of railroad lines by means of train performance and track geometry measures is suggested. A train that has a specific performance and is running the straight line can make minimum travel time (ideal time). But the actual travel time will be increased by the track geometry and various speed limitations. By comparing these travel times, we can easily define the degree of line deterioration. This method does not require complex vehicle performance measures and/or specifications that exceed those of typical Train Performance Simulations (TPS). For this reason, ease of use is ensured and the results are similar to those obtained by running a TPS for practical evaluations.
Journal of Information Technology and Architecture
/
v.11
no.4
/
pp.441-448
/
2014
The application of spatial information has drawn significant attention from a wide range of industries. Railway spatial information facilitates the cooperation among related parties and improves the efficiency of asset management and operations. This study proposes the structure of Railway Object IDentifier(ROID) on railway spatial information. Current facility management and train operation are based on relative positioning system. Despite many advantages, relative positioning system causes serious problems such as the entire reconfiguration of positioning in the case of line change. Another major concern is the interface compatibility between individual facilities with different relative positioning. ROID based on absolute positioning addresses these issues, allowing the information exchange and convergence between independent parties. This study proposes ROID based on OID standard with object IDentifier and service object-oriented reference system. Our ROID employs the absolute positioning and the unique identifier, maintaining the compatibility with existing management system.
In this paper through Honan high-speed railroad which is planned with the north and south axis, we will verify the feasibility of the coordinate conversion using railroad control points after regarding current planned-railroad as the linear central axises. From analysis, distortion of Y axis varies 21 cm to 40 cm diminishing to a gentle straight line, distortion of X axis varies 14 cm to 29 cm. Through a revision, the deviation value between the coordinates were 6 mm to 9 mm and it satisfied the allowable error of national geographic information institute which is following ITRF (International Terrestrial Reference Frame) and cadastral boundary survey (10 cm). consequently the coordinate conversion is possible using railroad control points as common control points.
Jang, Seong Geun;Kwon, Tae Ho;Park, Sang I.;Lee, Sang-Ho
Journal of the Computational Structural Engineering Institute of Korea
/
v.30
no.6
/
pp.549-557
/
2017
In order to improve the productivity in the civil engineering field, efforts to apply BIM have been continuing, however, research on information modeling of tunnel structures considering alignment is insufficient. In this study, we proposed the method of building tunnel models reflecting curved alignment by transferring point data to BIM Authoring Tools(BAT) through discretization of alignment in Alignment-centered Modeling Tools(AMT). IFC data schema was derived to consider the physical and spatial elements of tunnel structures and alignment and IFC-based information management for tunnel alignment, tunnel structures and ground conditions was possible by referring to the extended data schema and including meanings in IFC property sets. The ratings for ground condition in Rock Mass Rating(RMR) and Q-system was automatically derived by using generated information model according to the proposed method.
Korean Journal of Construction Engineering and Management
/
v.24
no.2
/
pp.13-23
/
2023
Unlike building construction projects, where the activity is repeatedly carried out in a limited area, civil engineering projects such as roads and railroads are carried out in a linear type in a horizontal working space over several tens of kilometers. Each activity is managed with a station number that has a unit of distance from the starting point to the end point. For this reason, since the work location information of the activity is a major management factor, the Gantt chart system that expresses only schedule information may have limitations. In this study, authors propose a method for constructing a linear schedule chart that can simultaneously express schedule information indicating the start and finish dates and location information indicating the start and end positions of each activity, and develop a system for generating a linear schedule chart. In the study, the coordinate axes of the linear schedule chart consisted of distance and date values on the X and Y axes, respectively, and each activity was expressed as a symbol that can infer the type of work to increase the visibility of the linear schedule chart compared to the simple bar chart method. The linear schedule chart generation system was reviewed for practical applicability by utilizing the actual schedule data of bridge structures in a railroad project.
In this paper through Honam high-speed railroad which is planned with the north and south axis, we will verify the feasibility of the coordinate conversion using railroad control points after regarding current planned-railroad as the linear central axises. From analysis, distortion of Y axis varies 21cm to 40cm diminishing to a gentle straight line, distortion of X axis varies 14cm to 29cm. Through a revision, the deviation value between the coordinates were 6mm to 9mm and it satisfied the allowable error of national geographic information institute which is following ITRF (International Terrestrial Reference Frame) and cadastral boundary survey(10cm). consequently the coordinate conversion is possible using railroad control points as common control points.
본 논문에서는 개인고속이동(PRT: Personal Rapid Transit)시스템에서 차량의 속도를 제어하기 위해서 필요한 속도 프로파일의 생성과, 생성된 속도 프로파일의 추종 특성을 관찰하기 위한 제어 시스템의 구축에 관해서 다룬다. 제어 시스템을 구축하기 위해서 Labview Real Time Module과 Matlab/Simulink 를 채용한다. 제어기준신호인 속도 프로파일은 간단한 선형방정식을 이용해서 생성할 수 있으며 방정식에 포함되어 있는 변수들에 대한 정보를 얻기 위해서 가상의 선행차량으로부터 feedback되는 차량의 상태정보를 이용한다. 간단한 모의시험을 통해서 속도 프로파일 추종특성의 평가를 위한 제안된 제어시스템의 효용성을 보인다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.