• Title/Summary/Keyword: 철도교

Search Result 224, Processing Time 0.019 seconds

Methodology for Reliability-based Assessment of Capacity-Rating of Plate Girder Railroad Bridges using Ambient Measurement Data (상시 계측 데이터를 이용한 신뢰성에 기초한 판형 철도교의 내하력 평가법)

  • Cho, Hyo Nam;Choi, Hyun Ho;Lee, Sang Yoon;Sun, Jong Wan
    • Journal of Korean Society of Steel Construction
    • /
    • v.15 no.2
    • /
    • pp.187-196
    • /
    • 2003
  • Today, the Working Stress Rating (WSR) is being widely used for the capacity-rating and the safety assessment of railroad steel bridges. Since it cannot incorporate the uncertainties, several studies have been carried out in order to get over the incompleteness of the conventional capacity-rating and safety assessment. A system reliability-based equivalent capacity-rating method, which can evaluate the capacity of existing bridges, has been recently proposed. For more efficient reliability analysis, probabilistic parameters of the random variables in the limit-state models should be reasonably evaluated. Especially, uncertainties for live load effects must be realistically included. In this study, an improved limit-state model was used for the system reliability-based equivalent strength method. This model can incorporate the probabilistic parameters obtained from ambient measurement data. To demonstrate the applicability of the improved system reliability-based equivalent capacity rating method, this was applied to the existing steel plate girder bridge for comparison with the conventional capacity-rating and safety assessment.

An Experimental Study on the Stress Behavior of Coped Stringers in Steel Railway Bridge - I : the Reason Why Crack Occurs (철도교 세로보 절취부에서의 응력거동에 관한 실험적 연구 - I : 균열 발생원인)

  • Li, Guang Ri;Park, Young Suk
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.4A
    • /
    • pp.299-305
    • /
    • 2009
  • In this study, in order to research the causes lead to fatigue crack in the coped stringer of a steel railway bridge, we take the steel railway bridge which actually occurs fatigue crack as a research object and manufacture the full size of crossbeam-stringer and floor system model to perform the experimental test. The results indicates that, the fatigue crack in the top of coped area of stringers is caused by the reciprocal action of the in plane stress in the tip of coped area of web by the negative moment occurred in the end of the stringers. While the fatigue crack in the bottom of coped area of stringers is due to the plane stress caused by the out-plane deformation relative to the bottom of coped area of web of the fixed end in the stringers.

An Experimental Study on the Stress Behavior of Coped Stringers in Steel Railway Bridge - II : Repair · Strengthening Method (철도교 세로보 절취부에서의 응력거동에 관한 실험적 연구 - II : 보수·보강 방법)

  • Li, Guang Ri;Park, Young Suk
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.4A
    • /
    • pp.307-313
    • /
    • 2009
  • In this study, in order to research the repair-strengthening methods, when fatigue crack occurs in the coped stringers of a steel railway bridge, we manufacture the full size of crossbeam-stringer and floor system model. Also the experimental test is performed on the coped stringers applying the repair-strengthening methods using the stop hole, combination plate, connection plate, bracket, and so on. The results indicate that, the most effective method is to set up connection plate and bracket in the top flange and bottom flange of the stringers, while we can consider the method of punching stop holes in the end of the crack as a subsidiary method. It is necessary to set up the combination plate when the length of crack is quite long.

The Methodology of Determination of the Allotment Ratio in Maintenance Cost on the Multi-Purpose Steel Bridge (복합이용 강교량의 유지관리비 분담비율 결정을 위한 방법)

  • Kim, Kyoung Nam;Lee, Seong Haeng;Jung, Kyoung Sup
    • Journal of Korean Society of Steel Construction
    • /
    • v.18 no.6
    • /
    • pp.747-758
    • /
    • 2006
  • With the growth of economy, the esthetic values of bridges become significant points in the decision process of a type of new bridges. So, it is common that a long-span bridge or a multi-purpose bridge are selected as the type of new bridges. Also, the economic growth derives increase in traffic and then the increased traffic derives multi purpose bridges from the decision process of bridge types. In the multi-purpose bridges with private fund, the construction cost is simply alloted to several organizations according to the percentage of participation and usage. But the allotment of the maintenance cost is not simple. Because the loads and safety factors in design are different between the criterion of design of highway bridges and that of railway bridges. In this study, we verify the possible problems in case of allotment method of maintenance cost in foreign examples as well as domestic example. As one of the method of determination of allotment ratio in maintenance cost, the method based on the stress of structural analysis is presented and it can be an example in the similar problem later.

경부고속철도 트러스교 건설

  • 황낙연;배선순;김창환;김병용
    • Journal of the Korean Society for Railway
    • /
    • v.5 no.3
    • /
    • pp.33-42
    • /
    • 2002
  • 김천시 및 경부고속도로를 통과하는 8-2공구는 고속철도구간 중 최고 난공사 구간중의 하나로서 (주)대우건설컨소시엄에 의해서 수행되었는데 건설초기 원가 절감과 공기완수라는 목표를 두고 전면적인 설계검토를 착수하였다. 교량구간이 전체 연장중 절반이 넘는 9.6km이므로 교량에서 대안 설계가 중점적으로 검토되었고 이에 따라 PSM(Precast Span Method)공법이 적용되었다. (토목학회지1999. 6.) PSM공법은 25m 경간이므로 도로, 철도등을 통과하는 구간에는 한계가 있어 50m 경간의 강합성교량을 적용하였다. (중략)

고속철도 PC Box교량 잭업을 위한 교각코핑부 안정성 검토

  • 강진욱;이명섭;김진욱
    • Journal of the Korean Society for Railway
    • /
    • v.7 no.1
    • /
    • pp.51-56
    • /
    • 2004
  • 경부고속철도 제7-2공구 현장은 충청북도 영동군 심천면 초강리에서 영동읍 화신리에 이르는 총연장 10km의(182k800∼199k800) 고속철도 노반공사 현장으로서 총 연장 중 교량공은 3.6km, NATM터널 2.6km, 그리고 토공 3.8km로 구성되어 있다. 이중 교량공은 PC Box 연속교(2@40m, 2@25m, 3@25m 등)가 주를 이루고 있으며 가설공법으로는 현장타설공법인 FSM(Full Staging Method) 공법을 채택하였다. 교량의 받침 형식으로는 고정단에는 포트받침 그리고 가동단에는 탄성받침이 적용되었다(참조 : www.ktx7-2.wo.to). (중략)

Variation of Natural Frequency and Dynamic Behavior of Railway Open-Steel-Plate-Girder Bridge with Installing Disk Bearings (디스크 받침에 의한 철도 판형교의 고유진동수 및 동적 거동 변화)

  • Choi, Eun Soo;Lee, Hee Up;Kim, Sung Il;Kim, Lee Hyeon
    • Journal of Korean Society of Steel Construction
    • /
    • v.18 no.4
    • /
    • pp.437-446
    • /
    • 2006
  • Open-steel-plate-girder(OSPG) bridges are one of the most prevalent bridge types among Korean railway bridges. They account for about 40% of all Korean railway bridges. However, the line-type bearings used for OSPG bridges generate several problems with respect to the bridges' dynamic behavior and maintenance. The replacement of the existing bearings with polyurethane disk bearings could be a possible solution to this problem. This type of disk bearing is an elastic bearing using a polyurethane disk. This study estimated the variations in the natural frequency of a bridge when disk bearings were installed and the bridge's dynamic behavior with a running locomotive and running trains. The first natural frequency of the bridge was 3% lower than that of the as-built bridge after the installation of the disk lower, respectively. Also, the second and third frequencies were 7 and 15% lower, respectively. The disk bearings increased the vertical displacement of the bridge, but the pure displacement, excluding the disk deformation, did not vary. The vertical acceleration did not increase when the disk bearing was installed, with trains running. The shear pin in the disk bearing reduced the lateral displacement and the acceleration of the bridge.