• Title/Summary/Keyword: 천공기계

Search Result 77, Processing Time 0.024 seconds

Performance Optimization of Down-the-Hole Hammer Using Taguchi Method (다구찌 기법을 이용한 Down-the-Hole Hammer의 타격성능 최적화에 관한 연구)

  • Shin, Dae-Young;Song, Chang-Heon
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.36 no.1
    • /
    • pp.109-116
    • /
    • 2012
  • There are a number of studies concentrating on drilling equipment and drilling methods, but none investigates the impact performance and optimization of DTH (down-the-hole) drilling. It is very difficult to experimentally evaluate the performance of a DTH hammer, because putting together an experimental setup for DTH drilling requires a great deal of money and time. Therefore, this paper examines the characteristics and performance of DTH hammers through pneumatic simulation after a thorough investigation of their working mechanism. In addition, the parameters linked to the performance of DTH hammers were selected using the design-of-experiment method, and then the optimization of performance factors, which are the impact rate and impact energy, was investigated using Taguchi method.

A Study on Estimating Time for PRD (Percussion Rotary Drill) Piling Work (도심지 토공사 PRD (Percussion Rotary Drill) 공법의 천공작업 소요시간 산정 방안에 관한 연구)

  • Kim, Yong-Gyu;Choi, Chang-Hoon;Han, Choong-Hee;Lee, Junbok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.3
    • /
    • pp.3-10
    • /
    • 2018
  • In recent years, mechanized construction has become commonplace due to increases in the scale and complexity of construction, and construction machinery is a major factor in successful construction. However, even though the proportion of construction machinery is increasing, analysis of the work capacity of construction machinery is inadequate. In addition, since the standards for all construction machines are currently not defined in quantity-per-unit, the construction period is arbitrarily applied according to the operator at the time of the construction plan. As a result, the construction period of the actual construction is insufficient, and rushed work or construction delays occur. Therefore, in this study, in order to calculate the construction period of the piling work of the pile driver used in the PRD method more accurately than the existing method, the formula for calculating the time required for the piling work of the pile driver was established by collecting piling time data from the daily task reports through the field survey. If the precise construction period of piling work is estimated based on the results of this study, it will be possible to prevent the rushed work and construction delays that occur due to the short construction period.

Prediction of Geological Condition Ahead of Tunnel Face Using Hydraulic Drilling Data (유압 천공데이터를 이용한 터널 굴진면 전방 지질상태 예측)

  • Kim, Kwang-Yeom;Kim, Chang-Yong;Kim, Kwang-Sik;Yim, Sung-Bin;Seo, Kyoung-Won
    • The Journal of Engineering Geology
    • /
    • v.19 no.4
    • /
    • pp.483-492
    • /
    • 2009
  • During construction of a tunnel and underground structure, it is very important to acquire accurate information of the rock mass will be excavated. In this study, the drill monitoring method was applied for rapid prediction of geological condition ahead of the tunnel face. Mechanical data(speed, torque and feed pressure) from drilling process using a hydraulic drilling machine were analyzed to assess rock mass characteristics. Rock mass information acquired during excavation from drilling monitoring were compared with results from horizontal boring and tunnel seismic profiling(TSP). As the result, the drilling monitoring method is useful to assess rock mass condition such as geological structures and physical properties ahead of the tunnel face.

The Improvement of Tunnel Construction Cost Standards Considering the Site Conditions in Korea (현장실태를 고려한 국내 터널공사 공사비산정기준 개선)

  • Ahn, Bang-Ryul;Lee, Han-Soo;Oh, Jae-Hoon;Song, Tae-Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.8
    • /
    • pp.26-35
    • /
    • 2020
  • Tunnel construction is an important part of Korean public construction projects. Although the development of various equipment and technologies has led to advances in tunnel construction methods that are implemented on sites, the cost standards related to such works do not yet reflect the realities of the construction sites. A literature review and site surveys were conducted to suggest reasonable cost standards for tunnel work that reflects the realities of the field. First, each item in the cost standards for tunnel work, as established in the Construction Standard Production Rates, were analyzed. The results were compared with the actual costs implemented on tunnel projects. The key items analyzed included those regarding the work cycle time, such as rock classification, profiling survey, drilling speed, and muck-disposal processing equipment combination, as well as the number of people put to tunneling work. Based on the site survey results, improved estimates regarding the cycle time per one tunnel drilling blast, drilling speed of the machine, muck disposal processing equipment combination, and the number of people put to tunneling work were suggested. This study suggests the cost standards that reflect the realities of tunneling sites. The results are expected to help ensure adequate costs for tunnel construction projects.

Study on the Natural Convection Heat-Transfer Enhancement in Radial Heat Sink Using the Perforation and Flow Guide (천공과 유동 가이드를 활용한 방사형 히트싱크의 자연대류 열전달 향상에 관한 연구)

  • Jeon, Sora;Li, Bin;Byon, Chan
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.40 no.5
    • /
    • pp.339-345
    • /
    • 2016
  • In this study, we numerically investigate the thermal performance of an enhanced radial heat sink with a perforation and chimney structure. We estimate the thermal performance of the enhanced radial heat sink, and compared it with that of a conventional radial heat sink. The results show that the radial heat sink with perforation has a higher thermal performance when either of the diameter and the number of perforations is high. With regards to the radial heat sink with a chimney structure, we investigate primarily the effect of the fin number, and the spacing between the chimney and the base plate on the thermal performance. The results show that there are optimal values for the fin number and the spacing between chimney and base plate. In addition, the enhanced radial heat sinks have maximum thermal performance when facing upward ($0^{\circ}$), while it has worst performance when facing sideward ($90^{\circ}$). The perforation and chimney are shown to cause thermal performance enhancements of 17% and 20%, respectively, compared with a conventional radial heat sink. The proposed method is useful for starting business, and is useful in terms of venture and entrepreneurship.

Analysis of empirical impedance model using Strouhal number (스트롤 수를 이용한 천공요소의 실험 임피던스 모델의 분석)

  • Lee Seong-Hyun;Ih Jeong-Guon
    • Proceedings of the Acoustical Society of Korea Conference
    • /
    • autumn
    • /
    • pp.375-378
    • /
    • 2001
  • 천공 요소는 유체 기계의 흡기계나 배기계의 소음기에 널리 사용되고 있으며, 스치는 유동 (grazing flow)과 통과하는 유동 (cross flow)을 접하게 된다. 천공 요소의 임피던스는 소음기의 음향학적인 특성에 영향을 미치게 된다 본 연구에서는 유동이 임피던스에 미치는 영향을 고려하기 위하여, 실험을 통하여 얻은 임피던스 값을 유동 레지스턴스 (flow resistance)와 종단 보정 비 (end correction ratio)로 나타내고, 스트롤 수 (Strouhal number)로 무차원 화하여 분석하였다 이를 난류를 고려하여 제안된 선행 임피던스 모델들과 비교하여 난류가 미치는 영향을 분석하였다.

  • PDF

Credibility Evaluation of Versatile Weight Lightening Plywood Using Piercing (천공공법을 이용한 다목적 경량 합판의 신뢰성 평가)

  • Kim, Jin-Woo;Kim, Hye-Soo;Kim, Chang-Uk;Song, Jung-Il
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.12 no.4
    • /
    • pp.55-60
    • /
    • 2013
  • In this study, mechanical properties of versatile light weight plywood(manufacturing using piercing) are studied. A credibility evaluation was carried out for different perforation patterns including octagonal shape, rectangular shape and circular shape. A static structural analysis is conducted to find the stresses produced. Circular perforations are found to have better strength to weight ratio. Results of each type of perforation are discusses and compared.

Effects of flow field on the acoustic performance of the concentric resonator (동심관형 공명기 내부의 유동장이 음향학적 성능에 미치는 영향)

  • 이성현;이정권
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2002.11a
    • /
    • pp.371.2-371
    • /
    • 2002
  • 자동차 및 유체기계의 흡기계나 배기계에 사용되는 소음기의 음향 성능은 전달손실로 기계성능은 배압으로 표현된다. 유체가 흐르는 관 사이의 임피던스 부정합을 이용하는 반사형 소음기의 경우, 내부 유로에 천공을 주어 음향 감쇠를 시키거나 유동을 안정시키는 경우가 많다. 본 연구에서는 동심관형 공명기의 내부 관에 존재하는 천공의 분포양상이 공명기 내부의 유동장에 어떤 영향을 미치며, 그 유동장의 변화에 따라서 소음기의 성능에 어떠한 영향을 미치게 되는지를 고찰하였다. (중략)

  • PDF

Redo Konno Procedure - A case report - (Konno씨 수술 재수술 -1례 보고-)

  • 구관우;강신광;원태의;김시욱;박상순
    • Journal of Chest Surgery
    • /
    • v.35 no.2
    • /
    • pp.133-136
    • /
    • 2002
  • A 28 year-old male who had received Konno procedure twelve years ago with 23mmmechanical aortic valve and bovine pericardium with which his small aortic annulus, ventricular septum and right ventricular outflow tract had been enlarged was transferred due to sudden congestive heart failure. There were perforations on aortic and interventricular portion of bovine pericardial patch above and below the aortic valve, respectively, which was calcified and denaturated severely. The perforations seemed to be attributed to the cracks, resulting from mobility of mechanical aortic valvc itself and stiffness of calcified and denaturated bovine patch. We performed a redo Konno procedure applying PTFE patch.

Arthroscopic Transosseous Suture Repair for Bankart Lesion with a Flexible Drill Device - An Experimental and Preliminary Clinical Report - (유연성 천공기를 이용한 Bankart 병변의 골관통식 봉합 - 동물 실험 및 예비 임상 결과 보고 -)

  • Park, Jin-Su;Won, Ye-Yeon;Yoo, Jung-Han;Park, Yong-Wook;Noh, Kyu-Chul;Chung, Kuk-Jin;Kim, Hong-Kyun;Hwang, Ji-Hyo;Lee, Young-Bum;Suh, Il-Woo
    • Clinics in Shoulder and Elbow
    • /
    • v.13 no.1
    • /
    • pp.72-78
    • /
    • 2010
  • Purpose: Too develop a flexible drill device that can be inserted into the shoulder joint so that arthroscopic transosseous suture repair for Bankart lesion is possible. Materials and Methods: We created a device composed of a flexible drill unit and a guide pipe unit. The flexible drill unit was made of flexible multifilament wires (1.2 mm in diameter) that was twisted into one cord so that it can flex in any direction and a drill bit (1.2 mm in diameter) that is attached onto one end of the flexible wire. The guide pipe unit was a 150 mm long metal pipe (2.0 mm in inner diameter and 3.0 mm in outer diameter), with one end bent to 30 degrees. The flexible drill set was inserted into the shoulder joint through the posterior portal of the joint. The guide pipe component was placed onto the medial wall of the glenoid so that the pipe was placed 5 mm posterior to the margin of the anterior glenoid rim. The flexible drill was driven through the glenoid by the power drill so that holes were made in the glenoid. A non- absorbable suture was passed through the hole. Tying of a sliding knot tying was accomplished over the capsule and labrum after making a stitch through the capsule and labrum with a suture hook loaded with suture passer. The same procedures were done at the 2 and 4 O'Clock positions of the glenoid. Results: Five cases with Bankart lesion received arthroscopic transosseous repair with our flexible drill device. There were no intraoperative problems. Neither redislocation nor subluxation was reported at final follow-up. Conclusion: Arthroscopic transosseous suture repair without suture anchors and easy tying of a sliding knot are possible with a flexible drill set.