• Title/Summary/Keyword: 차세대 고속철도

Search Result 109, Processing Time 0.029 seconds

Analysis of Effect of Pantograph Cover on the Current Collection Quality of High Speed Train using Real Train Experiment (실차시험을 통한 팬터그래프 커버가 고속열차의 집전성능에 미치는 영향에 대한 분석)

  • Oh, Hyuck Keun;Kim, Seogwon;Cho, Yong-hyun;Kwak, Minho;Kwon, Sam Young
    • Journal of the Korean Society for Railway
    • /
    • v.19 no.4
    • /
    • pp.409-416
    • /
    • 2016
  • The contact force characteristic between the pantograph and the catenary wire represents the current collection quality of trains; it should be precisely controlled under international standard. Recently, a noise reduction cover has been installed around the pantograph of high speed trains. However, little study on the contact force by the pantograph cover has been conducted. In this study, the impact on the current collection performance of the pantograph cover was analyzed by dynamic contact force measurement using a next generation high speed train (HEMU-430X). As a result, it was confirmed that the attachment of a pantograph cover could lower the mean contact force by approximately 50N at 300km/h. In addition, the pure difference of the average contact force by the presence of pantograph cover, except for the static pressure, was measured and found to be up to 110N at 300km/h. It was also found that the standard deviation of the contact force of 3~5N could be changed by use of a pantograph cover.

A Design Method of Three-phase IPMSM and Clamping Force Control of EMB for High-speed Train (고속철도차량의 EMB 적용을 위한 3상 IPMSM의 설계 및 제동압부력 제어)

  • Baek, Seung-Koo;Oh, Hyuck-Keun;Kwak, Min-ho;Kim, Seog-Won
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.4
    • /
    • pp.578-585
    • /
    • 2018
  • This paper proposes a design method for a 3-phase interior permanent magnet synchronous motor (IPMSM) and clamping force control method for an electro-mechanical brake (EMB) using co-simulation for a high-speed train (HST). A traditional pneumatic brake system needs much space for the compressor, brake reservoir, and air pipe. However, an EMB system uses up to 50% less space due to the use of a motor and electric wires for controlling the brake caliper. In addition, it can reduce the latency time for brake control because of the fast response and precise control. A train that has many brakes is advantageous for safety because of the control by sharing the braking force. In this paper, a driving method for a cam-shaft-type EMB is modeled. It is different from the ball-screw-type brakes that are widely used in automobiles. In addition, a co-simulation method is proposed using JMAG and Matlab/Simulink. The IPMSM was designed and analyzed with the JMAG tool, and the control system was simulated using Matlab/Simulink. The effectiveness of the co-simulation results of the mechanical clamping force and braking force was verified by comparison with the clamping force specifications of a HEMU-430X HST.

A Study on the Design for Floor Construction which Installed on Next Generation High Speed Train (차세대고속전철 상구조 설계에 대한 연구)

  • Yoo, Bo-Sun;Lee, Joung-Yul;Kim, Kuk-Jin
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.35-42
    • /
    • 2011
  • Recently, the Next Generation High Speed Train(hereinafter HEMU-400X) which has been developing is the power distribution type high speed train. The power is on every each car and all bogies are installed on the front and rear of every car comparison with KTX and KTX-Sancheon which are consist of power cars and linkable bogies. HEMU-400X can be designed much more seats than others because there are not power car separately. However, that type has no advantage for vibration and noise due to distributed power and more faster design speed. Therefore, in this study, the design of floor construction for preventing the vibration from under the floor is considered.

  • PDF

A Study on Overall Measurement System Development of HEMU-400X Performance Test (차세대고속열차 성능시험을 위한 종합계측시스템 개발 연구)

  • Lee, Young-Yeob;Ryu, Sang-Hyun;Kim, Bong-Rae;Kim, Kyung-Taek
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.1118-1123
    • /
    • 2011
  • The introduction of high speed railway(KTX) in Korea after the Korean high speed train through the KTX-II of the development is being run is made. Thus the demand for the railway technology advances and high performance, Korean government promoted the development of the next-generation high speed train system(HEMU-400X). In addition to the production of train system essential element of the train through an on-line test is to evaluate the performance. Through the on-line test of the train in order to evaluate the performance test items should be selected first and need to the test procedures are required. In addition, an Overall Measuring System(OMS) to measure the performance of the train system should be established. In this study for the on-line test of the HEMU-400X test items was selected for detailed measurements and performance evaluation of a comprehensive and efficient trains to test an OMS for the development are discussed.

  • PDF

Verification about the HEMU Pantograph Performance of the Dynamics Behaviors (차세대고속전철용 판토그라프에 대한 성능 검증)

  • Kim, Ki-Nam;Cho, Yong-Hyeon;Ko, Tae-Hwan;Jang, Hyeon-Mog
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.3019-3026
    • /
    • 2011
  • The pantograph on HEMU400 perform the simulation of following characteristics for pantograph's performance prediction and confirming the EN50119's requirement. To meet the performance requirements for the input data are proposed. Simulation result of the performance requirements are satisfied from proposed input data. The new model was developed by proposed data base on the simulation result. A new developed model data used in following characteristics meet to be sure about what the test was done to count the equivalence of mass. Depending on the results of test to performance prediction, and propose research directions.

  • PDF

A Study on Optimization of the Overall Measurement System for HEMU-400X (차세대고속열차 종합계측시스템 최적화 방안 연구)

  • Lee, Young-Yeob;Ryu, Sang-Hyun;Lee, Jin-Jong;Kim, Kyung-Taek
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1-6
    • /
    • 2011
  • In Korea, high-speed train(HEMU-400X) system with distributed power is being developed, and the highest test speed of this train is 400km/h. This developed the first high-speed train as a distributed power train in Korea, as well as for the development of train system and evaluation system included evaluation technology is needed. Accordingly, a comprehensive and efficient OMS(Overall Measurement System) was build up for verifying the performance of HEMU-400X. By the case study of the G7 and TTX, OMS of HEMU-400X was improved the test performance and maintainability. In particular, the existing Window-based systems has a limit to the control, due to this reason OMS applying enhanced RT(Real-time) system. In this study, compare the advantages and disadvantages of RT systems with Window-based systems, as well as the configuration of the RT systems.

  • PDF

A Study on Performance Evaluation Plan of Next-Generation High-Speed Prototype Train during Test Run (차세대고속열차 본선 시운전 성능평가 방안에 대한 연구)

  • Kim, Sang-Soo;Choi, Snng-Hoon;Park, Choon-Soo;Kim, Seok-Won;Kim, Ki-Hwan
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1814-1820
    • /
    • 2010
  • Korean Train Express (KTX) has been commercially operating and achieving elevation on transport capacity since 2004. And the first hish-speed prototype test train, HSR-350x, was developed and succeeded in testing of running over 350km/h. Now KTX-II based on HSR-350x was started in service run. The new high-speed train development project, HEMU-400x project, has started since 2007. The protype train is being designed and manufactured. After the train are developed completely, it will run on the commercial line and will be test to verify the estimated performance. The authors devised the performance evaluation method and process of the HEMU-400x prototype system. And we introduce the definite performance test items and the method to vitrificate them in this paper.

  • PDF

A Study on Propulsion Characteristic of HEMU-400x (차세대고속열차 추진성능 검토)

  • Han, Young-Jae;Park, Chun-Soo;Kim, Sang-Soo;Kim, Ki-Hwan;Lee, Tae-Hyung;Han, In-Su
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1978-1983
    • /
    • 2008
  • With the increase in population, the area of human activities has expanded, resulting in the dramatic increase in the need for transportation system. Various infrastructures necessary for efficient logistics, however, have not been supplied enough and the logistics efficiency in Korea is in a bad situation now. As a result of the situation, the demand for the railroad transportation system that can provide large volume transportation has increased dramatically. An electric railway system is composed of high-tech subsystems, among which main electric equipment such as motors and converter are critical components determining the performance of electric vehicle. Among the on-board equipments, traction equipment is important part that has influence on safety and performances of vehicles. We is studied for high-speed train of foreign countries. From this research, we knows that axle weight of HEMU-400x is reasonable within 13ton.

  • PDF

Development of Performance Estimate and Verification Process for Next Generation High-speed Prototype Train (차세대고속열차 차량시스 성능예측 및 성능검증 체계 개발)

  • Kim, Sang-Soo;Lee, Tae-Hyung;Choi, Sung-Hoon;Park, Choon-Soo;Han, In-Soo;Mok, Jin-Yong
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.555-560
    • /
    • 2008
  • Korean Train Express (KTX) has been commercially operating and achieving elevation on transport capacity since 2004. And HSR-350x was developed and succeeded in testing of running over 350km/h. The new high-speed train development project, HEMU-400x project, has started since last year. To develop the train system, it is important how we progress the configuration of the system, design, manufacturing and test verification. The authors devised the performance estimate and verification process of the HEMU-400x and the project is performed following the developed processes.

  • PDF

Analysis of the Suspension Characteristics for Next Generation High Speed Train Formed with 6 Cars in Concept Design Stage (개념단계에서 차세대고속철도 6량 편성차량의 현가요소 특성 분석)

  • Park, Chan-Kyoung;Kim, Yong-Guk;Kim, Ki-Whan;Kim, Young-Mo
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.387-392
    • /
    • 2008
  • Next Generation High Speed Train having a distributed electrical motor system has just been developing to aim the experimental maximum speed at 400km/h since August, 2007. This project is in stage of concept design and so, it needs to take some review and analysis the characteristics of suspensions on the view of concept design. A train dynamic modeling is modified with the one car model presented in the previous conference and it was extended to 6cars models having the same suspensions and added some connection's characteristics between the cars with Vampire program. It is used to analyze the effect on the dynamic performances according to the variation of primary and secondary suspension characteristics in the condition of 6 cars configuration. The results would be useful to manage the potential risks in the next stage of basic and critical design that will be done by the manufacturing company.

  • PDF