Standardized Progress Measurement Package (건설진도율 산정을 위한 진도관리단위에 관한 연구)

  • Jung Youngsoo;Kang Seunghee;Chin Sangyoon;Kim Yeasang;Chung Moonhun;Park Soonchan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.565-570
    • /
    • 2004
  • The construction Progress is widely used 3s a critical index for effective project management. However, the methods, structure, data, and accuracy of progress measurement may vary depending on specific characteristics of the project, organization, or location. Even in an organization, different projects may utilize different measurement methods to effectively achieve their own management purpose. The excessive effort required to manipulate very detailed progress data is also an issue Therefore the purpose of this study is to dove]op an automated progress measurement model utilizing standard progress measurement package (SPMP).

  • PDF

A Study on the Calculation of Emission from Meter Vehicles Considering Traffic Volume (통행량을 고려한 자동차 대기오염 배출량 산출 조사연구)

  • 장영기;최상진;조규탁;김태승
    • Proceedings of the Korea Air Pollution Research Association Conference
    • /
    • 2000.04a
    • /
    • pp.33-35
    • /
    • 2000
  • 대도시 대기오염을 정확하게 평가하기 위해서는 자동차에 의한 대기오염물질 배출량이 정확하게 산출되어야 한다. 그러나 현재 우리 나라는 이동오염원에 의한 배출량 산출자료가 부족한 상태이다. 그 이유는 배출량 산출방법이 정립되어 있지 못하고 관련된 기초자료가 다양하며, 연계가 잘 이루어지지 못하였기 때문이다. 본 연구에서는 이동오염원중 자동차에 의한 지역별 대기오염 배출량 산출을 개선하기 위하여 기존의 지역별 둥록대수에 의한 방법 대신 지역별 통행량을 고려한 자동차 부문 대기오염배출량 산출 방법을 비교 검토하고자 한다.(중략)

  • PDF

A Study on the Progress Measurement Method using Percent Complete of Work and Labor Productivity - Focusing on Structural Works of Apartment Construction - (단위작업 물량 달성율과 투입 노무량을 이용한 진도율 산정방법에 관한 연구 - 공동주택공사의 골조공사를 중심으로 -)

  • Choi Hyun-Ha;Lee Junbok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.212-219
    • /
    • 2005
  • Time management is important in construction management Especially, in the high-rise apartment housing projects, it is very important to expedite the construction progress in order to meet the planned schedule. The objective of this paper is to propose the baseline for the progress rate using work volume and man $\cdot$ hours performed at work activity level. The work volume far each activity is transformed to the weighted value compared to total work volume for the floor Therefore, a progress rate for an activity is calculated by multiplying a weighted value and work volume. A progress rate for a floor and a building can calculated in this manner, respectively.

Improvement of Cost-Schedule integration based Progress Management through PMIS (비용-일정통합기반 진도관리 개선방안)

  • Yoon, You-Sang;Suh, Sang-Wook;Jang, Gyu-Seong;Choi, Jang-Shik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.144-152
    • /
    • 2013
  • Recently construction projects become more bigger. So construction companies have being performed cost and schedule management task by using PMIS. In engineering and construction phase, progress management which occur the most frequent information I/O(input and output) should be managed effectively by PMIS. Although most information by PMIS manage efficiently, cost-schedule information for progress management is difficult to be managed due to recurrent information input. thus when changed by price fluctuation and change order, progress management could not connnect cost information with schedule information. So it caused inaccuracy of progress measurement and data increase in PMIS. To solve this problem, This study suggests improved module for progress management through integration of cost-schedule using quantity take-offs as progress measurement method.

Typical Seismic Intensity Calculation for Each Region Using Site Response Analysis (부지응답해석을 이용한 지역별 대표 진도 산출 연구)

  • Ahn, Jae-Kwang;Son, Su-Won
    • Journal of the Korean GEO-environmental Society
    • /
    • v.21 no.1
    • /
    • pp.5-12
    • /
    • 2020
  • Vibration propagated from seismic sources has damping according to distance and amplification and reduction characteristic in different regions according to topography and geological structure. The vibration propagated from the seismic source to the bedrock is largely affected by the damping according to the separation distance, which can be simply estimated through the damping equation. However, it is important to grasp geological information by location because vibration estimation transmitted to the surface are affected by the natural period of the soil located above the bedrock. Geotechnical investigation data are needed to estimate the seismic intensity based on geological information. If there is no Vs profile, the standard penetration tests are mainly used to determine the soil parameters. The Integrated DB Center of National Geotechnical Information manages the geotechnical survey data performed on the domestic ground, and there is the standard penetration test information of 400,000 holes. In this study, the possibility of quantitation the amplification coefficient for each region was examined to calculated the physical interactive seismic intensity based on geotechnical information. At this time, the shear wave column diagram was generated from the SPT-N value and ground response analysis was performed in the target area. The site coefficients for each zone and the seismic intensity distribution for the seismic motion present a significant difference according to the analysis method and the regional setting.

Automation of Construction Management System for Bridge Construction Site (교량 건설현장의 시공관리 자동화 기술 연구)

  • Lee, Kee Sei;Choi, Jun Ho;Jiang, Meiling;Kang, Young Jong
    • 한국방재학회:학술대회논문집
    • /
    • 2011.02a
    • /
    • pp.164-164
    • /
    • 2011
  • 최근들어 교량 건설 프로젝트는 그 규모가 방대해 졌을 뿐만아니라, 건설에 사용되는 장비 및 자재, 인력의 종류 또한 다양해 지고 있다. 이에 따라 종래 구조적 안전만을 추구하던 건설현장은 이러한 제반 요소들을 효율적으로 관리하여 경제성뿐만 아니라 시공의 효율성 까지 고려할 수밖에 없게 되었다. 따라서 건설 현장의 진도 및 자재, 인력관리는 현대 건설 산업의 주요 과제라 할 수 있다. 이에 따라 본 연구에서는 현장의 시공정보를 무선으로 송신할 수 있는 단말기 및 RFID를 이용하여 종래에 시행되던 작업을 자동화함으로써 작업의 편리성을 도모하고 이를 통하여 시간과 인력의 낭비를 줄일 수 있는 시공관리 시스템에 대한 모듈을 제안 하였다. 제안된 시스템은 3D모델을 기반으로 하여 진도 및 공비를 한눈에 알아볼 수 있는 방안을 제시한다. 사용자는 현재 진행되고 있는 공정을 3차원 모델에서 확인할 수 있으며, 현재까지 사용된 비용 및 공정률을 손쉽게 확인할 수 있다. 3D모델은 공사 시작 전 공정에 맞추어 분절된 형태로 제작되어 현장에서 송신한 위치정보가 통합관리 시스템에서 수신되면 해당 새그가 화면에 나타나게 된다. 3D모델은 공정시각화의 역할을 할 뿐만 아니라 각 새그에는 사용된 자재의 종류나 수량등이 DB화 되어 있어, 실시간으로 공사에 사용된 물량을 산출 할수 있도록 한다. 시공정보의 수신은 각 자재에 부착한 RFID태그를 직접 읽어서 송신하거나, 작업자가 시공상황을 단말기를 통하여 직점 송신함으로써 이루어지게 된다. 수집된 시공정보는 3D모델과 연계됨과 동시에 통합관리 시스템에 내장된 DB와 연결되어 사용 자재 및 물량에 대한 비용산출에 중요한 역할을 하게 된다. 현재 우리나라의 교량 시공 현장에서는 기성청구시 내역서를 기준으로 비용을 산정하게 되는데, 시공관리 통합 프로그램에서는 각 공정이 DB화된 내역서와 연계되어 3D모델에서 얻어진 물량으로 공비를 산출하는 과정이 자동으로 이루어지게 된다. 이러한 과정은 단일 현장뿐만 아니라, 공구 내의 여러 교량 현장에 대하여도 적용이 가능하므로, 방대한 현장의 공사관리에 소요되던 시간과 노력을 절감 할 수 있다. 본 연구를 통하여 현장에서 이루어지는 공사관리 작업에 대해 IT기술을 접목하여 자동화 할 수 있는 방법에 대한 알고리즘을 제시하였다. 이는 모바일 오피스 및 단말기를 이용하여 현 공정까지 사용된 물량, 인력, 장비 정보를 관리하는 한편, 현재까지 진행된 공사 내용을 3D모델을 통하여 한눈에 알아볼수 있는 교량 건설현장 통합관리 시스템의 모듈을 제공한다. 이에따라 공무 작업에 소모되는 인력 및 시간을 크게 절약 할 수 있을 것이라 판단된다.

  • PDF