• Title/Summary/Keyword: 진도관리단위

Search Result 14, Processing Time 0.024 seconds

Standardized Progress Measurement Package (건설진도율 산정을 위한 진도관리단위에 관한 연구)

  • Jung Youngsoo;Kang Seunghee;Chin Sangyoon;Kim Yeasang;Chung Moonhun;Park Soonchan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.565-570
    • /
    • 2004
  • The construction Progress is widely used 3s a critical index for effective project management. However, the methods, structure, data, and accuracy of progress measurement may vary depending on specific characteristics of the project, organization, or location. Even in an organization, different projects may utilize different measurement methods to effectively achieve their own management purpose. The excessive effort required to manipulate very detailed progress data is also an issue Therefore the purpose of this study is to dove]op an automated progress measurement model utilizing standard progress measurement package (SPMP).

  • PDF

A Study on the Progress Measurement Method using Percent Complete of Work and Labor Productivity - Focusing on Structural Works of Apartment Construction - (단위작업 물량 달성율과 투입 노무량을 이용한 진도율 산정방법에 관한 연구 - 공동주택공사의 골조공사를 중심으로 -)

  • Choi Hyun-Ha;Lee Junbok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.212-219
    • /
    • 2005
  • Time management is important in construction management Especially, in the high-rise apartment housing projects, it is very important to expedite the construction progress in order to meet the planned schedule. The objective of this paper is to propose the baseline for the progress rate using work volume and man $\cdot$ hours performed at work activity level. The work volume far each activity is transformed to the weighted value compared to total work volume for the floor Therefore, a progress rate for an activity is calculated by multiplying a weighted value and work volume. A progress rate for a floor and a building can calculated in this manner, respectively.

A Method to Build Daily Progress Management Model based on BIM Estimate Data in Construction Phase (BIM 기반의 시공단계 견적데이터를 활용한 일일 진도관리모델 구축 방안)

  • Jung, Jun-Ho;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.23-34
    • /
    • 2011
  • Reliable progress management at construction requires integrated information of cost and schedule, and information is used as a basis for project performance measurement. However, separate handling of cost and schedule information at construction projects makes objective measurement more difficult and decreases management productivity due to additional works for breaking down bill of quantities into corresponding activities. Recently, research related to BIM addresses issues on effective progress management based on BIM with incorporation of daily progress management. Therefore, the objective of this paper is to propose information model for daily progress rate and budgeted cost of work performed by utilizing BTM-based quantity and location information.

A study on progress measurement method of a construction project (건설공사의 진도율 산정 방법에 관한 연구)

  • Park se-Jung;Kim Soo-Yong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.450-453
    • /
    • 2003
  • It is very important to examine and compare initial plan with earned value repeatedly in construction. For this purpose, progress measurement, which reflects the actual progress correctly, is required and it is necessary that accurate field data should be offered. To measure the progress, the entire project mutt be divided into unit works that have an accurate scope of work, and required information must be distributed to the all parties. Under the circumstances of domestic construction industry which focus on the specifications, progress measurement needs to reflect the information of schedule as well as cost that includes the quantity of unit work and construction expenses. Therefore this research proposes weighted method of progress measurement based on the information of cost and schedule.

  • PDF

Construction Progress Measurement System by tracking the Work-done Performance (내역물량 측정에 의한 건설공사진도율 산정시스템)

  • Choi Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.3 s.15
    • /
    • pp.137-145
    • /
    • 2003
  • The project control system based on the actual values of three objects shall be operated continuously in a timely manner. For collecting/tracking accurate actual performance data, a reasonable basis of measuring work performance and its related measuring methods are needed. Therefore, this research proposes a method of developing and operating the construction progress measurement system. The problem of the conventional method is the difficulty to construct control accounts and to define the basis of measuring the performance of each control account. Therefore, this research proposes the preferable, formal methodology that produces the progress value of the smallest work unit by surveying the installed quantities and estimates percent complete of groups of works or entire project by earned value concept. This research in connection with the hereafter research of the weight value of control accounts will contribute to apply in practice and to develop the scientific construction management technique in the construction industry. Further researches how to trend and forecast the project using the measured progress value are recommended for putting the prosed system of this research to practical use.

A General ion Method of Measurement Units for Performance Tracking (진도율 산정을 위한 측정 단위 도출 방안에 관한 연구)

  • Yoon Su-Won;Chin Sang-Yoon;Kim Yea-Sang;Jung Young-Soo;Park Sung-Soo;Park Soon-Chan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.521-524
    • /
    • 2003
  • Recently various construction management systems are applied for more efficient project management, and through them as-built construction information is collected. However, the accuracy of the collected information shows big differences among projects, since tile collection of tile as-built information is not based on objective manner or criteria and also each management personnel uses difference criteria on this based on individual experiences. This initiates the need for a development of methods and information frameworks for efficient collection and management of as-built information with assurance of data accuracy. Therefor the objective of this study is to suggest a method to determine the task performance measurement unit depending on the characteristics of work types. A prototype system was developed for generating task performance measurement units by utilizing MS ACCESS. The information framework and the system developed in this research is expected to help standardized performance measurements across projects by improving the objectivity and the accuracy of the collected information.

  • PDF

A Study on the Cost Estimating Method based on Spatial Unit Focused on Improving Limitation Caused by Lack of Spatial Information of the Cost Based on Work Type (공간단위 공사비 산정방법에 관한 연구 - 공종별 공사비의 공간정보 부재로 인한 한계점 개선을 중심으로 -)

  • Lee, Ki-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.3
    • /
    • pp.131-139
    • /
    • 2011
  • In this Study, the Cost of Public Facility Construction in the VE Cost Model, and the Progress of the Construction Site Management, and Cost due to the Lack of Cpatial Information in Dispute Cost Work Type Recognize the limits of Historical Information, and to Overcome the Perception of Cost and Space Systems Unit In the Process of Transition that Began Seeking Ways to Improve Through this Study, Different Parts of the Proposed Area of Construction Work Unit System, the Core of Calculating Hourly and Detailed Engineering Information and Cost Information Generated Extension to Configure the Construction Unit in Every Space, Every Work Unit System, All Materials That Make Up Work Unit System, Unit Labor Costs, And All of the Configuration Items Enables Precise And Multidimensional Understanding is That.

Development of Construction Project Management System Applicable to Earth-Work Field (토공 현장관리 중심의 시공관리시스템 개발에 관한 연구)

  • Kwon, Oh-Yong;Jo, Jae-Ik;Kim, Do-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.301-304
    • /
    • 2008
  • The purpose of this study is to embody the integrated working management system for public works, focused on the management of surplus soil at a field of public works. The contents and results of this study can be classified into the design of working management DB for public works and the embodiment of working management DB. First, the design of working management DB for public works consists of three DBs - process management to analyze work plan and performance. for backhoe loader, working management and resources management for equipment and labor management - in connection with work and resources classification system. Secondly, the working management system for public works can describe work plan and performance on a floor plan using graphic. Based on this, the status of process and progress report with visual expression had been developed to facilitate the communications and performance of duties among staff in charge at the field of public works. This study is a specialized system for a company specializing in public works and a system that can be put into practical use if practicality is proved through test-bed with regard to business.

  • PDF

A real-time construction management of a tunnel using position tracking sensor (위치추적 센서를 이용한 터널의 실시간 시공관리)

  • Lee, Kang-Hyun;Kim, Dae-Won;Mun, Sung-Mo;Cho, Hun-Hee;Kang, Kyung-In;Lee, In-Mo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.13 no.2
    • /
    • pp.133-148
    • /
    • 2011
  • Construction sites are becoming larger and complex with the growth of national economy. Accordingly, it is important to identify real-time information about materials, equipments, and manpower during construction at sites. Even though research utilizing position tracking sensors has been conducted in architectural engineering fields, this area of research is almost nil in civil engineering fields. Therefore, a feasibility study to find a way to apply position tracking sensors to an in-situ tunnel construction site adopting conventional tunnelling method is performed in this study. A methodology is proposed that the progress management of the tunnelling work can be monitored by checking construction materials needed at job site and the safety management system can be assessed by checking distance between in-situ workers and construction equipments. The most representative materials were identified so that IT technology can be applied by attaching and monitoring sensors to the selected materials. Also, time of arrival (TOA) for a position determination technology along with a wireless network technology was chosen and build wireless network system. The adopted methodology was applied to an in-situ tunnelling site, and verified the usefulness of the proposed system.

An Application of Cutting-edge Technology Sensors to Real-Time Construction Management of a Tunnel (터널의 실시간 시공관리를 위한 첨단센서의 기술 적용 방안)

  • Lee, Kang-Hyun;Kim, Dae-Won;Mun, Sung-Mo;Baek, Young-In;Lee, In-Mo
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.1438-1447
    • /
    • 2010
  • Construction sites are becoming larger and complex with the growth of national economy. Accordingly, It is essential to indentify real-time information about materials, equipments and manpower during construction at job sites. Even though research utilizing cutting-edge sensors has been conducted in architectural engineering field; this area of research is almost nil in civil engineering field. Therefore a feasibility study to find a way to apply cutting-edge sensors to an in-situ tunnel construction site adopting NATM is tried as the first step. After listing all construction materials needed in each activity, the most representative materials were identified so that IT technology can be applied by attaching and monitoring sensors to the selected materials; shotcrete and lining were selected as representative materials. Moreover, a plan to visualize construction process and progress management system using selected representative materials was proposed.

  • PDF