Design of the Railbeam Lengths at the Roadbed (철도 레일빔 설계법에 대한 연구)

  • Jung, Hyuksang
    • Journal of the Korean GEO-environmental Society
    • /
    • v.17 no.1
    • /
    • pp.21-28
    • /
    • 2016
  • This paper deals with contents on the estimation of rail beam from the geotechnical engineering aspect. Rail beam is reinforced rail installed on the inside and outside of rail to prevent differential settlement during the construction period of railroad crossing construction. Such rail beam is frequently being installed to ensure stability of existing railroad facilities because of increasing constructions of underground structures crossing railroad in recent. However, there is a difficulty in design due to lack of design standard on rail beam length. Furthermore, derailing accidents are also occurring as a result of rail beam length shortage. Accordingly, this paper presented flow chart based on the classification into soil ground and bedrock ground for the rail beam length estimation. In addition, case study was conducted on rail combination and location through which effective rail combination and location were ensured.

Investigation Study on Underground Cavity Scale Estimation Based on GPR Exploration (지하공동 규모 평가를 위한 GPR 탐사 기반의 조사 연구)

  • Byoung-Jo Yoon;Han-Joo Lim;Yeon-Gyu Kim
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.3
    • /
    • pp.737-746
    • /
    • 2023
  • Purpose: Ground subsidence due to cavity can bring about various problems, such as casualties, decrease of the safety of the structures, and indirect social costs. Therefore, ground subsidence should be prevented through the exploration and recovery of the cavity under the pavements. Method: In this study, GPR exploration method was carried out on both actual roadway and mock-up site to compensate for the problems caused by excavation and restoration process. Result: This study compared the cavity scales obtained from GPR exploration results and the direct excavation of the identified cavity. It was confirmed that the predicted soil depth by GPR exploration was similar to the identified soil depth, but the predicted cavity scale by GPR exploration overestimated the longitudinal and cross-sectional widths compared to the identified cavity scale. Conclusion: Based on the correlation between the predicted cavity scales by GPR exploration, it is possible to qualitatively estimate the cavity scales using the empirical formula proposed in this study.

Analysis on the Safety of Structure and Economics of Replacement Method Using Rock Debris in the Soft Ground - Case Study of Miho Stream Crossing Road in Cheongju City (연약지반 암버럭 치환공법의 구조물 안정성과 경제성 분석 - 청주시 미호천 횡단도로를 대상으로)

  • Heo, Kang Kug;Park, Hyung Keun;Ahn, Byung Chul;Min, Byeong Uk
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.4
    • /
    • pp.705-713
    • /
    • 2016
  • For the soft ground construction, the factors not considered in the design stage occurs in the construction stage so that they cause the increase of the construction cost due to the structural stability and the design change. The subject of the study is the construction section of the industrial complex access road made in the Ochang region of Chungcheongbuk-do. The study is concerned with selecting the soft ground handling method such as the replacement method using rock debris and the surcharge reflecting the service load as the soft ground handling measure and analyzing the effect of reducing the construction cost with the stability of structures and the reduction of the construction period. The soft ground in the study section consists of sandy and cohesive soil and is 2.4m to 5.5m deep. It is distributed unevenly between the 1.5m to 5.9m stratums under the ground surface. Settlement is not serious, but the future uneven settlement and difference are expected so that the future settlement behavior is estimated by analyzing the site measurement results after the soft ground treatment. Moreover, in consideration of the regional characteristics and economic efficiency, soil with good quality is replaced with rock debris as the replacement material so that 29% of the construction cost is reduced due to the increase of stability and the reduction of duration. If the estimation of the dispersion of the pore water pressure within the dam body and the change of the underground water level and the relation of the actually measured soft ground with consolidation is studied further on the basis of the study, it is expected that the behavior of the soft ground will be correctly estimated in various site conditions.