• Title/Summary/Keyword: 지하철 지반진동

Search Result 31, Processing Time 0.029 seconds

Study on the Prediction of Ground-Borne Vibration with Distance induced by Subway Transit System (지하철에 의한 거리별 지반진동 예측에 관한 연구)

  • 김득성;김형곤;장서일
    • Proceedings of the KSR Conference
    • /
    • 2002.05a
    • /
    • pp.597-602
    • /
    • 2002
  • This study reviews several of the procedures that have been used to predict ground-born vibration. The vibration responses are measured at three sites that have different soil qualities. The measured vibration levels are compared with the predicted results by previously used vibration level prediction models. In this study a numerical method, which is based on explicit differential method, is used to compensate tot existing prediction models. Although numerically computed results are not quantitatively in good agreement with the measured results, the trends are comparable in the sense that vibration level does not decrease monotonically with distance. Also, The site with the deepest tunnel gives the highest vibration level.

  • PDF

A Measurement and Analysis of Groundborne Noise nearby Subway railroad track (지하철의 운행로 주변의 지반전달음 측정 및 분석)

  • Kim, Hee-Cheul;Kim, Woo-Young;HuH, Young;Shin, Han-Chul
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 1996.10a
    • /
    • pp.402-407
    • /
    • 1996
  • Noise and vibration induced by subway operation is one of the major problem for the residents living nearby railway tracks. Many scientists and engineers have been working on the more accurate prediction of noise and vibration to provide the better residential environment. Some prediction equations were determined to compare the measurement value of a noise obtained from the inside of a residential area. It was observed that the condition of a soil type is one of the major parameter which should be considered to obtain the more accurate prediction value of a noise.

  • PDF

Behavior of Rapidly Expansion Materials for Maintenance Railroad Bed Subjected to Cyclic Loading (반복하중을 받는 철도노반 보수용 급속 팽창재료의 거동)

  • Lee, Jundae;Shin, Eunchul
    • Journal of the Korean GEO-environmental Society
    • /
    • v.10 no.2
    • /
    • pp.45-50
    • /
    • 2009
  • The differential settlement may be generated by the variation of stresses caused by the soft ground or ground water. The cracks are usually created when the structures are leaned or deformed due to the differential settlement. A grouting method has been mainly used till now to improve the bearing capacity of the ground when the foundation of the structure is deformed by differential settlements. However, when this method is used, it takes too long time to obtain the required strength and the period of the reinforcement effect is not long enough. The advantage of GPCON injection method is to have good mechanical properties and durability, and easy construction. In addition, the GPCON method rapidly fills up the void in soils by injecting some materials into underground and also obtain the increase of bearing and shearing forces due to the expansion. In this paper the restoration capability of the foundation settlement of railway and subway subjected to cyclic loading is analytically and experimentally evaluated using the high density rapidly expansion GPCON in order to investigate the types of deformations and vibrational characteristics.

  • PDF

Vibration Analysis of Buried Gas Pipeline by Blast Vibration (발파진동에 의한 매설가스관의 진동 해석)

  • Jeong S. Y.;Park C. S.;Hong S. K.;Kim J. H.;Koh J. P.
    • Journal of the Korean Institute of Gas
    • /
    • v.6 no.1 s.17
    • /
    • pp.46-51
    • /
    • 2002
  • In subway or road construction, the vibration caused by various construction equipments influences gas pipelines directly or indirectly Especially buried gas pipelines are influenced by the blast occurred near the pipeline buried Place. To analyze vibration response of buried gas pipeline caused by blasting works, the nonlinear behavior of ground is realized by applying equivalent linear analysis. According to the results of this analysis, the acceleration response values of gas pipeline are close to the measured values and the occurring time of peak values are agreed to the measured values. Thus, It is concluded that conventional seismic analysis mechanism can be applied to the dynamic analysis of buried gas pipeline.

  • PDF

Shield TBM trouble cases review and parameter study for the cause analysis (쉴드 TBM 트러블 사례 및 매개변수 연구를 통한 원인 분석)

  • Koh, Sungyil;La, You-Sung;Kim, Bumjoo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.2
    • /
    • pp.197-217
    • /
    • 2020
  • Shield TBM tunneling, used in the construction of Seoul subway line 7 and line 9, has been well known as a very efficient, as well as safe, tunneling method. Although the Shield TBM method has been known to be effectively used in poor ground conditions, a number of troubles have occurred during the use of the shield TBM, due to inappropriate machine selection, machine breakdown, and unpredicted ground conditions etc. In this study, several accidents and trouble cases occurred during excavation by Shield TBM, reported from Japan, were investigated. A series of numerical analysis was then performed to compare with the trouble cases and back-analysis results for the cause analysis. The lessons learned from the case studies are presented at the end.

A Study on the Near Construction Range Considering the Factors Affecting the Stability of Water Tunnel (수로터널 안정성에 미치는 요소를 고려한 근접시공범위에 대한 연구)

  • Mingyu Lee;Donghyuk Lee
    • Journal of the Korean GEO-environmental Society
    • /
    • v.24 no.5
    • /
    • pp.5-12
    • /
    • 2023
  • Recently, due to urban development and expansion, construction plans have been increasing adjacent to existing tunnel structures such as subways, roads, and large pipelines. Structural plans adjacent to existing tunnels have different effects on tunnel stability depending on the construction method, degree of proximity, and location of new structures. In particular, the pressure water tunnel shows a very large difference from other road tunnels and railway tunnels in geotechnical characteristics and operation characteristics. Therefore, it is necessary to review the safety zone due to adjacent construction in consideration of the geotechnical characteristics of the water tunnel and the new sturure construction method. In this study, the existing tunnel safety zone standards were investigated. A stability evaluation performed numerical analysis considering the deterioration of concrete lining in operation and the characteristics of water tunnel. In addition, the impact of vibration caused by pile construction and blasting excavation of new structures was reviewed. Based on this, a pressure water tunnel safety zone was proposed in consideration of adjacent construction.

An application of the tubular roof construction method for Seoul subway tunnel construction (서울지하철 터널의 T.R.c.M. 공법 적용 사례 연구)

  • Jie, Hong-Keun;You, Kwang-Ho;Park, Yeon-Jun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.6 no.4
    • /
    • pp.345-356
    • /
    • 2004
  • Open-cut method has been widely used to construct underground structures, but it causes several problems such as traffic congestion and public resentment resulting from severe construction noise and ground settlement. In many cases, it is very difficult to build underground structures safely due to the unknown locations of buried facilities such as water pipes, drainage pipes, gas pipes and high-pressure cable conduits etc. Also in open-cut method, moving buried facilities causes additional cost and extension of construction period. Therefore, this paper is to present a case study in which Tubular Roof construction Method (T.R.c.M.), a newly developed construction method for underground structures using slab steel pipes and PC wall trench, is applied for the construction of a subway tunnel in Seoul. As a result, it is found that T.R.c.M. is a construction method by which tunnels can be constructed safely without any effect on the surrounding environment and traffic flow due to the minimized construction vibration and noise.

  • PDF

Hybrid Integration of P-Wave Velocity and Resistivity for High-Quality Investigation of In Situ Shear-Wave Velocities at Urban Areas (도심지 지반 전단파속도 탐사를 위한 P-파 속도와 전기비저항의 이종 결합)

  • Joh, Sung-Ho;Kim, Bong-Chan
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.1C
    • /
    • pp.45-51
    • /
    • 2010
  • In urban area, design and construction of civil engineering structures such as subway tunnel, underground space and deep excavation is impeded by unreliable site investigation. Variety of embedded objects, electric noises and traffic vibrations degrades the quality of site investigation, whatever the site-investigation technique would be. In this research, a preliminary research was performed to develop a dedicated site investigation technique for urban geotechnical sites, which can overcome the limitations of urban sites. HiRAS (Hybrid Integration of Surface Waves and Resistivity) technique which is the first outcome of the preliminary research was proposed in this paper. The technique combines surface wave as well as electrical resistivity. CapSASW method for surface-wave technique and PDC-R technique for electrical resistivity survey were incorporated to develop HiRAS technique. CapSASW method is a good method for evaluating material stiffness and PDC-R technique is a reliable method for determination of underground stratification even in a site with electrical noise. For the inversion analysis of HiRAS techniuqe, a site-specific relationship between stress-wave velocity and resistivity was employed. As for outgrowth of this research, the 2-D distribution of Poisson's ratio could be also determined.

Pseudo-DC Resistivity Survey for Site Investigation at Urban Areas with Ambient Electrical Noises (전기잡음 간섭이 있는 도심지 지역 탐사를 위한 유사직류 전기비저항 기법)

  • Joh, Sung-Ho;Kim, Bong-Chan
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.1C
    • /
    • pp.37-44
    • /
    • 2010
  • Recently, urban retrofit and extension, development of new buildings and facilities, and construction of underground structures like subway tunnels in urban areas give rise to significance of site investigation at urban areas. However, ambient electric noises, traffic vibrations, embedded objects work as obstacles to high-quality and accuracy in site investigation at urban areas. In this paper, a new technique called the pseudo-DC resistivity survey (in brief, PDC-R) was proposed to minimize the adverse effect of ambient electrical noises in resistivity survey. PDC-R technique utilizes an AC current with frequency range of 0.1 to 1.0 Hz rather than DC current, which is used for conventional resistivity survey. The motivation of using low-frequency AC current is to avoid 60-Hz components or its multiples in the resistivity survey which ambient noises are mostly composed of. The implementation of PDC-R technique also included the parametric study on skin effect, frequency effect and current-level effect, which led to the determination of optimal values of frequency and current level for PDC-R survey. The reliability and feasibility of PDC-R technique was verified through field tests, accompanied by the comparison with DC resistivity survey and CapSASW tests.

A Study on Practicalization of Low Vibration New KINRECKER-II (미진동 발파용 New KINECKER-II 실용화에 관한 연구)

  • Jang, Seung-Ho;Park, Hee-Won;Lim, Jung-Hyuk;Lee, Chang-Yeop;Ahn, Bong-Do;Kang, Dae-Woo;Lee, Ha-Young
    • Explosives and Blasting
    • /
    • v.35 no.1
    • /
    • pp.43-52
    • /
    • 2017
  • Mountain and hill areas occupy by more than 70% in South Korea and Rock drilling should be applied in order to reduce noisy & vibration from massive civil engineering business such as road expansion, high-way construction, subway construction and construction of site renovation such as a newly-built & re-development of apartment, newly-built of high-rising building in downtown area. As Blasting noise & vibration such as vibration, noise, fly rock etc caused by blasting operation from large small scale construction occurs, neighboring residents who demand the compensation file a civil complaint so that the business reach a deadlock. As the excavation method for these areas, There are blasting of micro-vibration, mechanical excavation method(Rock splitter, Breaker etc), similar blasting method(plasma, gel fragmentation etc) to date. In this study, we are trying to find the feature & performance which get improved economic feasibility & construct ability through improving sympathetic detonation of New KINECKER-I used in blasting of micro-vibration & formulation and would provide convenience for use by introducing standard blasting pattern & construction method. Also, checked and confirmed all the blasting with connecting cap has been cleary detonated.