• Title/Summary/Keyword: 지하연속벽

Search Result 32, Processing Time 0.013 seconds

Feasibility Study to Apply Automated Trench Cutter (지하연속벽 공법 자동화 도입 타당성 검토)

  • Park, Kyoung-Soon;Koo, Ja-Kyung;Lee, Tai-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.364-367
    • /
    • 2007
  • According to increase of construction projects which is accomplished in the town, diaphragm wall method was proposed. This method diminished noise and vibration. And it is able to excavate deeper than other methods. But excavation work is difficult to maintain vertical and requires much time to work. Also the work result depends on know-how, experience and intuition of excavating machine operator. We interviewed technical experts related with slurry wall method and find equipment's characteristics. We used cost-concern matrix to investigate the propriety for the introduction of trench cutter automation. Through the research, it is proper to apply trench cutter automation.

  • PDF

A Study on the Compression of Construction Period by the Improvement of Trench Excavation for Slurry Wall Method (지하연속벽 시공 시 트렌치 굴착방법 개선을 통한 공기단축에 관한 연구: 현장적용사례를 중심으로)

  • Lee, Young Soo;Park, Hyung-Keun;Kang, Kyubyung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.5D
    • /
    • pp.499-505
    • /
    • 2012
  • As the excavation depths during excavation works in urban sites are getting deeper and bigger, It is necessary to study for the improvements to solve the problems in the excavation processes. This research deals with the excavation method that can not only minimize the effect on the surrounding constructions, but also shorten the construction period of the excavation work. For this research, there have been an extensive literature review of the bibliographic data about Slurry Wall Method, which is recognized around the world, and the analysis of the major problems in the existing ineffective construction step. These efforts led to the technical improvements. Accordingly, a new construction method applied with the new technical factors has been suggested, and it was possible to compare Slurry Wall Method with the construction method and analyze them on the base of the examples using the suggested method. This new method decreased the excavation period by 15 days. It took only 33days to finish the excavation work, as compared to 48 days that can be seen on the pre-modification schedule. Furthermore, the suggested method in this research is safer, more economically feasible, and better for the environment than Slurry Wall Method. It will contribute to shortening the construction period of Slurry Wall Method in the end.

Overview of Seismic Design for Vertical Construction Joints of Slurry Walls Used as Permanent Basement Walls (영구벽체로 사용하는 지하연속벽 수직시공이음부의 내진설계 개요)

  • Lee, Jeong-Young;Kim, Seung-Weon;Kim, Doo-Kie
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.393-394
    • /
    • 2023
  • This paper provides an overview of seismic design considerations for vertical construction joints of a slurry walls used as a permanent basement walls.

  • PDF

Design Considerations and Method for Vertical Construction Joints of Slurry Walls Used as Permanent Basement Walls (영구벽체로 사용하는 지하연속벽 수직시공이음부의 설계방법)

  • Lee, Jeong-Young;Kim, Seung-Weon;Kim, Doo-Kie
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.395-396
    • /
    • 2023
  • The current building structural standards present design requirements for the vertical construction joint of a slurry wall when it is used as a permanent wall. This paper proposes design methods and considerations according to the requirements of the relevant standards.

  • PDF

Force-Displacement Relationship Diagram for Shear Connections in Vertical Construction Joints of Slurry Walls (지하연속벽 수직시공이음부의 전단접합부에 대한 힘-변위 상관도)

  • Lee, Jeong-Young;Kim, Seung-Weon;Kim, Doo-Kie
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.397-398
    • /
    • 2023
  • To design the shear connections for vertical construction joints of slurry walls, it is necessary to create a force-displacement curve that represents the structural performance of the shear connections. This paper proposes a method for preparing the force-displacement curve of the shear connections including major considerations.

  • PDF

The Fluid Loss and Sealing Mechanisms in Slurry Trench Condition (I) : A Large Scale Test and Design Procedure (Slurry wall 공법에서 안정액의 역할 (I) : 대형모형실험과 설계절차)

  • Kim, Hak-Moon
    • Journal of the Korean Geotechnical Society
    • /
    • v.18 no.4
    • /
    • pp.239-248
    • /
    • 2002
  • Bentonite slurries in a slurry wall construction must fulfill a stabilizing function by forming impermeable membrane (surface cake and penetrated cake) on the excavated soil faces. Thus problems are occurring in practice for the construction of diaphram walls and cut-off walls with a low permeability for wastes disposal areas in some deep excavations or different grounds. In this paper, the fundamental mechanics of fluid loss and filter cake formation in various soil beds are investigated using large scale laboratory apparatus. The sealing efficiency of filter cake from the large scale tests and the significance of fluid loss in a slurry trench are utilized for practical situation as a recommended design procedure.