A Study on the Monitoring Case of the Soil Blocking Facilities Due to Water Pipe Rupture Accident (상수관 파열 사고로 인한 흙막이 가시설 계측사례 연구)

  • Woo, Jong-Tae
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2023.11a
    • /
    • pp.244-246
    • /
    • 2023
  • 아파트 신축공사 흙막이 가시설 현장에 근접 매설된 상수관의 누수 및 파열 사고로 인접 건물이 공사현장 방향으로 58~188mm 기울어졌으며, 지중수평경사계 계측결과 21.07.20일 22.64mm가 21.10.18.일 101.46mm로 급격하게 78.82mm의 큰 수평 변위가 발생되었으며, 이로 인해 흙막이 가시설의 사보강재가 변형되고 토류판 일부가 파손되었다.

  • PDF

Characteristics of Subsidence of a Road During the New Tubular Roof Construction Around a Shallow Tunnel (저심도 터널주변의 NTR보강 중 발생한 도로면 침하의 특성)

  • Kim, Cheehwan
    • Tunnel and Underground Space
    • /
    • v.28 no.6
    • /
    • pp.620-634
    • /
    • 2018
  • The NTR(New Tubular Roof) method was used to secure the stability of the tunnel and minimize the subsidence of the road. The tunnel was constructed at about 7.5 meters deep below the highway. with a width of about 21 meters. Following the NTR method, 13 steel pipes with a diameter of 2.3 meters were digged and pushed in longitudinally along the tunnel profile and cut out sides of pipes to connect to adjacent pipes, then filled the inside of pipes and the connected space between pipes with concrete to complete the lining of the tunnel to be excavated. As the steel pipes were digged in sequentially, the area of relaxation was connected to each other and behaves like a gradually widening tunnel. When the steel pipes were digged in to the widest points of the tunnel, the settlement rate of the road surface was increasing to the maximum as 2.2 mm and the total settlement until the lining construction was approximately 7.7 mm. After that, by excavating a tunnel inside the pre-installed lining, an additional settlement of about 4.3 mm was occurred, resulting in the total settlement of about 11.8 mm after completing of tunnel construction.