• Title/Summary/Keyword: 지원계획

Search Result 2,158, Processing Time 0.028 seconds

The Relationship between Family-Friendly Policies and the Childbearing Intentions of Female Managers: The Mediating Effect of Family-Friendly Supervisor Support and Work-Family Conflict (기혼 여성 관리자의 가족친화제도 운영 인식과 후속출산계획 간의 관계: 가족친화적 상사지원인식 및 일·가정 양립 갈등의 매개효과)

  • Kang, Hara
    • Journal of Family Resource Management and Policy Review
    • /
    • v.25 no.2
    • /
    • pp.25-39
    • /
    • 2021
  • The purpose of this study was to investigate the influence of family-friendly policies on married female managers' desire for an additional child and the mediating effects of family-friendly supervisor support and work-family conflict. The analysis included 480 married female managers from the 7th survey of the 2018 Korean Women Manager Panel. Family-friendly policies were found to have an indirect effect on the desire for an additional child via family-friendly supervisor support and work-family conflict. These findings emphasize the importance of not only implementing family-friendly policies, but also creating a culture that supports them. Based on the results, approaches to interventions in the workplace to reverse the current trend of low fertility are discussed.

Development Scheme of Science and Technology in China (중국 과학기술발전전략에 관한 일 고찰)

  • Rhie, Dong-Hee
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2003.05b
    • /
    • pp.86-89
    • /
    • 2003
  • 본 고에서는 현재 중국에서 추진되고 잇는 과학기술진흥시책을 과기공관계획(科技攻關計劃)을 중심으로 조망해 보고, 특히 863 계획과 973 계획에 대한 총제적인 내용을 소개한다. 863 계획은, 7차경제개발5개년계획 기간(75기간)부터 시작된, 고급기술 연구개발에 대한 집중적인 진흥 정책이며, 973 계획은, 9차경제개발5개년계획 기간(95기간) 중에 시작된, 기초연구분야에 대한 집중적인 진흥시책이다. 중국의 경우 이와 같은 국가 주도적인 진흥책은 중국공산당중앙위원회(중공중앙(中共中央))와 국무원의 방침 결정에 따라 집중육성(중점(重点))의 항목 결정 및 관리를 유관부문이 상호 협조하에 분담하여 지원하고 있다.

  • PDF

A Study on Renewable Energy Financing Support Program (신재생에너지 융자지원제도 고찰)

  • Park, Joo-Young;Kim, Jin-Soo;Lee, You-Ah;Heo, Eun-Nyeong
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2009.06a
    • /
    • pp.232-234
    • /
    • 2009
  • 신재생에너지 보급 확산을 위해서 정부에서는 2009년부터 2030년까지의 시평을 가진 '제3차 신재생에너지 기술개발 및 이용 보급' 기본계획을 수립하고, 이의 달성을 위하여 예산투자와 함께 기술개발 지원, 보급 보조 및 융자, 발전차액지원제도, 그린홈 100만호 보급사업 등을 다각적으로 추진하고 있다. 이러한 보급지원제도의 하위제도로써의 융자지원제도는 신재생에너지 설치자 및 생산자를 대상으로 장기저리의 융자지원을 해주는 제도이다. 이를 통해 초기 투자비를 경감, 사업적 경제성을 확보하여 신재생에너지설비 및 관련 산업을 보급, 육성하고자 하는 것이다. 융자지원을 위한 금리는 기준금리(국고채 3년물 수익률)에 연동하여 분기별로 조정되고, 시설자금, 생산자금, 운전자금으로 분류하여 태양열, 태양광, 바이오, 폐기물, 수력, 지열, LFG, 풍력, 연료전지 등의 분야에 지원한다. 따라서 본 연구에서는 융자지원제도 현황을 고찰하고, 기준금리의 변동에 따른 융자지원 금리의 변동을 함께 살펴보았다. 각 에너지원별 지원에 어떠한 영향을 주는지 알아보았다.

  • PDF

A Comparative Study on Regional Water Resources Planning (지역수자원계획수립에 관한 비교연구)

  • Kim, Seong Won;Jeong, An Chul;Lim, Young Taek;Jung, Kwan Sue
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2016.05a
    • /
    • pp.134-134
    • /
    • 2016
  • 우리나라는 지역별 및 유역별로 강수량의 편차가 심하고 홍수기에 강수량이 편중되어 내리는 특징을 가지고 있다. 최근 몇 년간 발생한 이상기후에 의해 연평균 강수량이 크게 감소하였고 이는 겨울철에서 봄까지 용수이용에 많은 어려움을 주었다. 연중 안정적으로 물을 공급하기 위해서는 대량의 물을 저장할 수 있는 대규모 저수시설이 필요하지만 사회 환경적인 이견대립으로 이를 실행하기란 쉽지 않다. 따라서 구조적인 대책이전에 지역 및 유역의 특성을 고려한 실행단위의 수자원계획 수립과 평가할 수 있는 기반이 요구된다. 현재 국가 수자원의 안정적인 확보와 하천의 효율적 이용 개발 및 보전을 목적으로 수립되고 있는 수자원장기종합계획은 국가의 수자원정책을 반영하고 있으나 하천의 건천화, 수질부문에 대한 검토가 미비하고 수자원과 관련된 하위단위의 실행계획과 연계가 미흡한 실정이다. 국외의 수자원관리는 안정적이고 효율적인 수자원관리를 위해 통합관리체계를 도입하고 있으며 이에 하위관리단위인 유역단위에서 물과 관련된 많은 부분을 고려하여 통합관리를 위한 지침을 마련하고 있다. 지속적이고 안정적인 수자원 확보와 효율적인 이용을 위해 수자원 관리정책과 제도적인 틀을 마련하여 국가 및 지역의 수자원개발 및 이용계획을 지원하고 있다. 이러한 변화는 지금의 수자원이 미래에 사회 경제적으로 상당히 중요한 가치를 가진다는 것을 의미한다. 본 연구에서는 국내의 기 수립된 수자원계획과 국외의 수자원정책적인 부분을 살피고 국가차원의 수자원 관리를 지원할 수 있는 지역(유역관리)단위 계획수립과 이를 지속적으로 이끌어 갈 수 있는 중앙 정부, 지방정부, 시민단체 등과 같은 지역거버넌스의 협력적 관계조성을 기반으로 세부적인 부분에서 출발하는 수자원관리계획에 대한 필요성을 제시하였다.

  • PDF

Material Planning Model for Multi-Project Management in Medium-sized Construction Companies (중견건설업체의 다중현장관리를 위한 자재조달계획 지원 모델)

  • Jung Sung-Lim;Han Ju-Yeon;Kim Kyung-Rai;Shin Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.106-114
    • /
    • 2004
  • As the scale of construction work is enlarged, complicated and diversified, much construction information from the large number of construction sites is generated and reported to the head office. To control much information generated in construction sites simultaneously, the necessity of supporting system which could extract necessary information is increased. However, comparing with those of large companies, medium-sized companies's organization of head office and management system are weak. So it's difficult to manage multi-projects. Among these site managements, resource management is an important management area. But, resource planning is based on experience and judgement and has not associated with schedule information. So when schedule is changed, the plan must be amended manually. This study investigates material-planning model for multi-project management which is connected with daily report system and scheduling software.

The Meaning and Challenges of Health Care Workforce Support Act (보건의료인력지원법의 의미와 과제)

  • Seo, Kyung Hwa;Kim, Kye Hyun
    • The Korean Society of Law and Medicine
    • /
    • v.20 no.3
    • /
    • pp.211-233
    • /
    • 2019
  • The 「Health Care Workforce Support Act」 was came into effect on 29 October 2019. Health care workforce is the most important national health resource, and the quantity and quality of them is also related to the level of national health care. This study examined the background and major contents of this Act and suggested future improvement by analyzing main issues. Th e Act was enacted to support the health care workforce for their recruitment and better working environment. By stipulating the establishment of the master plan, management of the supply and demand, improvement of working environment for health care workforce, the act contributed to raise the quality of health service and health promotion. Given that the act was developed in consideration to support of health care workers, it has many meanings. However, it is necessary to reexamine the above-mentioned five issues in order to develop the effective law while utilizing the significance of the law for health care workforce support and has to revise as soon as possible.

법령과고시(2) - 제1차 녹색건축물 기본계획 수립

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.294
    • /
    • pp.90-93
    • /
    • 2015
  • 국토교통부(장관 서승환)는 녹색건축물조성지원법의 후속조치로 지난해 12월 31일 제1차 녹색건축물 기본계획을 발표했다. 정부는 기본계획에 따라 2020년까지 건축물에서 배출되는 온실가스를 배출전망치(BAU) 대비 26.9% 감축 목표를 수립했다. 특히 정부는 녹색건축물의 보급과 육성을 비전으로 ${triangle}$신축 건축물의 에너지 기준 강화 ${triangle}$기존 건축물의 에너지 효율개선 촉진 ${triangle}$건축물 사용자의 에너지 절약 유도 ${triangle}$녹색건축 기술개발 및 인프라 구축 등 4대 추진전략과 10개 정책과제를 도출했다. 이번 녹색건축물조성지원법 수립을 통해 고효율 설비 의무화 등 기계설비를 확대 반영하여 기계설비업계 발전의 토대가 마련됐다. 향후 정책과제 추진에 따라 녹색건축 설비 및 시공품질 강화, 그린리모델링 활성화, 녹색건축 전문기업 및 전문인력 육성을 비롯한 기계설비분야 기술개발 촉진 등으로 구체화될 전망이다.

  • PDF

컴포넌트기반 분산형 가상대학 구축 사례

  • 임승린
    • KSCI Review
    • /
    • v.9 no.1
    • /
    • pp.9-15
    • /
    • 2002
  • 본 대학에서는 2001 재정지원사업 중 특성화 프로그램으로 "수원.화성지역 정보화 지원을 위한 원격교육센터 구축" 사업을 추진하고 있다. 총 4단계로 계획된 본 계획의 제1단계로 구축할 시스템의 프로토타이핑을 수행하는 것을 2001년도 사업 목표로 정하고 추진하였다. 본 사업은 인터넷정보과에서 추진하고 있으며 학과가 처한 여러 가지 상황에 대처하기 위한 일종의 생존 전략중 하나이다. 구상하고 있는 시스템은 완전 분산형을 추구하고 있으며 향후 확장성이나 시스템 구축의 효율을 고려하여 분석 및 설계단계에서는 UML을 기반으로하는 RUP방법을 채택하고 있으며 구현부분에서는 시스템 구성 요소를 분해하여 컴포넌트화 하고 있다. 또한 모든 문서화는 ETRI에서 제공하고 있는 방법론인 마르미 III를 채택하고 있다. 본 논문에서는 현재 구축중인 시스템에 대한 배경에서 향후 계획까지 포괄적으로 소개하여 향후 유사한 프로젝트를 구상하고 있는 조직이나 개인에게 도움을 주고자한다.도움을 주고자한다.

  • PDF

Capabilities-based Query Rewriter for Disjunctive Query with Single Source (OR 연결 질의에 대한 능력 기반 질의 재작성 과정)

  • 윤정기;이지행;문강식;이전영
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 1999.10a
    • /
    • pp.275-277
    • /
    • 1999
  • 능력기반 질의 처리기는 데이터 소스의 질의 처리 능력과 데이터 소스에 대한 목적 질의 (target query)를 입력으로 받아 목적 질의와 동일한 결과를 내는 질의 수행 계획을 출력하는 시스템이다. 이전 능력기반 질의 처리기에서는 AND 결합 질의(Conjunctive query)만을 처리하였기 때문에 데이터 소스의 질의 처리 능력을 충분히 이용하지 못했다. 본 논문에서는 AND 및 OR연결 (Disjunctive query) 형태의 목적 질의에 대한 질의 재작성 방법을 제시한다. 재 장성된 질의는 데이터 소스에서 처리 가능한 지원 질의(supported query)들의 유니온으로 표현된다. 제안된 시스템에서는 각 지원 질의의 질의 수행 계획에 대한 기여도와 수행 비용을 고려함으로써 질의 재작성에 필요한 탐색 공간을 줄이고, 최적화 된 질의 수행 계획을 생성할 수 있다.

  • PDF

Estimation of Support Working Expenses for Dam Area using GIS Spatial Analysis (GIS 공간분석을 이용한 댐 주변지역 지원사업비 산정)

  • Hwang, Eui-Ho;Lee, Geun-Sang;Chae, Hyuo-Suck;Koh, Deuk-Koo
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.8 no.4
    • /
    • pp.24-32
    • /
    • 2005
  • Budget distribution system suporting dam area was changed largely in 2005, and thus, population survey and area calculation for dam and needed to be performed based upon the new criteria. According to the former regulations, dam area was confined to inside of 5km from the H.W.L-line. However, new regulations divide it into two categories : inside and outside of catchment area within 2km from the H. W. L-line and those belong to 2~5km from the same line. In this study, topography, DEM, TIN and Hydrological Unit Map were build for the analysis of the Namgang Dam area. It shows that analysis of dam area using GIS methods produces a good results to be used for rational distribution of budget.

  • PDF