• Title/Summary/Keyword: 지연사유

Search Result 28, Processing Time 0.024 seconds

An Administration Model for Causes of Delay in Construction Projects to Decide Time Extension Responsibility (건설공사 공기연장 책임구분을 위한 지연사유 관리 모델)

  • Kim, Jong-Han;Kim, Kyung-Rai;Han, Ju-Yeoun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.31-41
    • /
    • 2011
  • Since the cases of time extension have continuously transpired in the public construction project, the potential of economical loss and claims is increasing because the concerned parties such as an owner or a contractor have not properly performed their own responsibility for time extension. One of the main reasons is that the present planning and scheduling do not support the method to apportion the proper responsibility to the right party. This problem has repeatedly led to time extension and made it difficult for the concerned parties to perform the responsibility for time extension. In order to overcome this problem, a framework of delay administration is required as the method to apportion the proper responsibility to the right party. To solve this problem, this paper aimed to develop the conceptual model and prototype system as the practical method to administrate delay causation. Furthermore, the verification result for the reliability and applicability throughout the case studies on real construction projects shows that the conceptual model and prototype system developed would help efficiently to administrate the delay causation.

Improvement of Apportioning Responsibility for the Time Extension in Construction Projects (건설공사 공기연장 책임구분의 문제점 및 개선방안 제시)

  • Kim, Jong-Han;Kim, Kyung-Rai
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.60-67
    • /
    • 2007
  • Cases of the time extension have continuously transpired in the public construction projects. The potential of economical loss and claims is increased because the concerned parties such as an owner or a contractor have not properly performed their own responsibility for the time extension. Therefore, this paper aimed to improvement of apportioning responsibility for the time extension in construction projects.

  • PDF

Estimating System for Responsible Days of Schedule Delay for Construction Projects through Time Impact Analysis (건설공사 공기지연 영향분석을 통한 책임일수 산정체계 구축방안)

  • Kang, Leen-Seok;Kwon, Jung-Hee
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.5D
    • /
    • pp.685-694
    • /
    • 2008
  • Recently, construction projects are being gradually changed to large projects with complicated work processes. As a result, claims are increasing as well. Of these, the claims by delayed construction duration are given much weight in the general construction claims. To solve this problem, researches to estimate damages due to delay are carried out in research institutes by analyzing the causes of schedule delay. A system to easily estimate responsible days by analyzing the complicated processes needs for project manager. This study suggests a methodology based on the time impact analysis method, which can utilize the consequential analytical method with the consideration of reduced construction period. The suggested methodology is verified by comparing with actual data of case study by the computerized system for estimating the responsible days.

Improvement of Patient Safety and Inspection Satisfaction by Developing Pretreatment Process System with the Patients Who Reserved CT Enhance Examination (CT 조영검사 예약환자의 전처치 프로세스 시스템 개발을 통한 환자안전 및 검사 만족도 향상)

  • Beom, Hyinam;Han, Jaebok;Song, Jongnam;Kim, Wook;Choi, Namgil
    • Journal of the Korean Society of Radiology
    • /
    • v.10 no.1
    • /
    • pp.29-37
    • /
    • 2016
  • This study aims to improve the satisfaction level of the patient who undergoes CT contrast examination by developing and applying pretreatment process system, which not only can reduce the side effects caused by the test but also can help carry out the test smoothly. The subjects were 214 patients who booked CT contrast examination from January 2014 to February 2014 but could not carry out their test on schedule. We analyzed the reasons for the delay and conducted follow-up survey on them. We analyzed the usefulness of pretreatment process system by contemplating and developing pretreatment process system and applying it to the patients for whom follow-up survey was conducted from January 2015 to February 2015. The number of outpatients who came to the hospital form January to February 2014 was 2,846 and the number of patients who could not undergo the test was 214, accounting for 7.52% of the total. The specific reason for the delay includes 214 cases of unknown creatinine 98 with 120 minutes of average delay time, 40 cases of creatinine over 1.3(19%) with 30minutes of average delay time, 34 cases of past contrast media side effect 6% with 40 minutes of average delay time and 25 cases of lack of pretreatment such as fasting, etc. 11% with 120minutes of average delay time. The number of CT scan has been increasing ever since the development of CT and the frequency of using the contrast media is expected to increase. If we can employ pretreatment process system in order to effectively control the side effect of contrast media and help the CT contrast examination to be smoothly conducted on schedule, I'm sure we could improve the quality of our medical service and increase our patients' satisfaction who come to our CT scan room.

A Study on the Reformation of the Contract Time Extension Process in the Public Construction projects (공공건설사업에서 계약기간 연장처리방법 개선에 관한 연구)

  • Cho Young-Jun;Lee Sang-Beom
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.3 s.25
    • /
    • pp.81-89
    • /
    • 2005
  • Delay schedule coming about duration extension is happening essentially because public construction project consist of many sub contractor. The method which can calculate delay day is suggested by many studies in case of happing delay schedule, but It is difficult to apply to real construction project because there is no mention about the control of The law of contract according to delay schedule. The law of Contract which is cost of account has more uncertain problem than FIDIC condition of contract. This study suggests method which can make extension of duration procedure clear in case of happing the reason of design change related with activity duration during carrying on construction, and a submission process of the reason of duration extension and modify schedule making way about section which is basis of calculating contract amount clear.

An Administration Model for Causation of the Schedule Delays in Construction Projects (건설공사 공기연장사유 관리모델)

  • Kim, Jong-Han;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.3
    • /
    • pp.125-133
    • /
    • 2007
  • If project time extension were required in the construction projects, either liquidated damages or extension costs should be applied according to causation of the schedule delays. However, in actual cases it is not applied so far according to the contract conditions. The reason why this situation happened Is that function of the present planning and scheduling is not working feasibly. The CPM schedule could not provide a proper solution for apportioning responsibility for the schedule delays. This situation could be considered as breach of contract and will cause potential disputes for schedule delay. Therefore, in this research process based contract administration model for construction delay claim is proposed to prevent schedule delay and solve the claims. The model is based on pro-active management for causation of delay to provide apportionment of responsibility and written evidences.

Function Development for Apportioning System of Responsible Number of Days by Construction Delay (공기지연에 따른 책임일수 산정 시스템 구축방안)

  • Kang, Leen-Seok;Kwon, Jung-Hui;Park, Seo-Young;Yun, Seon-Mi
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.805-808
    • /
    • 2007
  • Recently there are many contract claims, which are caused by duration delay, in construction industry. Many kinds of research for solving such duration delay problem are being progressed and an effective computerized system needs to improve it. This study suggests an improved methodology and necessary functions to make a time impact analysis system. This results will be useful for quantifying responsible number of days caused by duration delay.

  • PDF

Analyzing Site Reliability for Residential, Civil and Plant Projects using Lean Construction Principles (린 건설에 기초한 국내 건설 공사의 시공 계획 신뢰도 평가 및 분석)

  • Koo, Bonsang
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.5D
    • /
    • pp.655-664
    • /
    • 2008
  • Lean Construction recommends implementing site production management by measuring the reliability of daily production tasks, collecting the causes for failure of incomplete tasks, and identifying problems in the existing process based on the collected data. Although many research projects have been performed to introduce Lean Construction in Korea, there are not many cases in which day-to-day site production operations has been stringently evaluated based on such methods. This paper introduces three cases in which such techniques were implemented on a residential, civil infrastructure and plant project. On each project, process maps were created with the superintendents and daily production meetings were held for two weeks. Consequently, the average PPC for the three projects was 79% for PPC and 16% for PAT. In addition, the majority of the failures were due to 'Directive/Plan' and 'Prerequisites.' The results show that project stakeholders (owners, contractors, etc.) lack the ability to plan ahead and keep to their plans, and also lack the capability to synchronize workflow between themselves. The results also reveal that project participants need to be more proactive in solving process problems on site and also need to be better educated in Lean concepts and methodologies.

특집_2009년도 원자력계 맥점 - 중.저준위 방사성폐기물 처분장 건설 완공 연기

  • Choe, Gwang-Sik
    • Nuclear industry
    • /
    • v.29 no.7
    • /
    • pp.21-24
    • /
    • 2009
  • 2009년 경주 윌성 지역에 건설 중이던 중 저준위 방사성폐기물 처분장(이하 방폐장) 건설의 완공이 지하 동굴 굴진 공사중 연약 암반이 발견된 것과 관련하여 애초 계획보다 30개월 지연된다고 지식경제부와 방사성폐기물공단이 발표하였다. 경주 주민들은 이에 대해 방폐장 건설의 안전성에 의혹을 제기하면서 진상조사를 할 것을 요구하였고 지경부는 한국지질학회에 의뢰하여 진상조사단을 구성하여 지연 사유를 조사하도록 하였으며 조사 결과 발표회가 개최되었다. 그러나 이에 만족하지 않고 추가 조사 등을 요구하는 지역 주민들의 요구에 의해 '방폐장 현안사항 해결을 위한 지역 공동협의회'가 구성되었으며 이들이 구성한 '방폐장 안전성 검증조사단'이 방폐장 안전성 확인을 위해 현재 조사 활동을 수행하고 있다.

  • PDF