Analysis of Road Construction Projects' Escalation under Historical Data-Based Estimate System in Jeju (실적공사비가 적용된 제주도 도로공사의 물가변동률 영향 분석)

  • Hong, Jeong-Ho;Lee, Dong Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.2
    • /
    • pp.667-676
    • /
    • 2014
  • This study has conducted case studies in order to suggest alternatives to the historical data-based estimate system. Price fluctuation calculation methods based on historial cost indexes, standard estimate and construction cost indexes were applied to 9 road construction sites in Jeju for an analysis. As a result, in 5 construction sites (about 56% of 9 sites), the index control rate calculated based upon historical data-based estimate system was higher than that calculated based upon standard estimate and construction cost indexes. Thus the establishment of the requirements for the adjustment of contract price due to price fluctuation delays, which leads to a significant difference in price fluctuation amount. And, in an analysis of construction cost indexes, the indexes for road construction were used for calculating index control rate which ranges from 2.0 to 9.4 percent, indicating the time of construction amount and price fluctuation application has a significant influence on index control rate.

Comparative Analysis between GDP Deflator Method and Index Adjustment Rate Method on BTL Sewer Rehabilitation Projects in Jeju (제주도 내 하수관거정비 BTL사업의 GDP 디플레이터 방식과 지수조정률 방식과의 비교 분석)

  • Yang, Du-Suck;Lee, Dong Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.1
    • /
    • pp.217-227
    • /
    • 2015
  • This study conducted case studies in order to suggest the improvement of GDP (Gross Domestic Product) deflator method which is adopted on calculating fluctuation rate on BTL (Build-Transfer-Lease) sewer rehabilitation projects in Jeju. As a result, because GDP deflator method calculates fluctuation rate by each quarterly, the fluctuation rate of GDP deflator method is higher than it of index adjustment rate method. And GDP deflator method cannot reflect real price because of applying fixed index in whole construction cost for calculating fluctuation rate. Especially, the notification day - the base point influences fluctuation rate and fluctuation amount strongly in GDP deflator method.

한국주식시장에 적합한 사건연구 방법론의 고안

  • Jeong, Hyeong-Chan
    • The Korean Journal of Financial Management
    • /
    • v.14 no.2
    • /
    • pp.273-312
    • /
    • 1997
  • 본 연구는 우리나라의 실제 일별 주식수익률 자료를 이용한 시뮬레이션을 통해 우리나라 주식시장에 가장 적합한 사건연구방법론을 도출하고자 하였다. 이를 위해, 1980년에서부터 1995년까지 우리나라 주식시장에 상장된 675개 주식을 대상으로 무작위 복원추출 방법에 의해 50개의 개별주식으로 구성된 250개 표본을 선정하였다. 이들 250개 표본을 이용하여 시뮬레이션 기법에 의해 다양한 사건연구 모형의 통계적 오류와 검정력에 미치는 영향을 종합적으로 분석하였다. 시뮬레이션 실험 결과에 의하면, 먼저 사건일을 정확히 포착할 수 있는 경우에는 산업별주가지수를 시장지수로 선택한 시장모형 혹은 시장조정모형으로 초과수익률을 측정하고, 횡단면 독립성을 가정한 검정법이 가장 우수한 사건연구방법으로 나타났다. 한편, 사건일을 정확하게 포착할 수 없는 경우에는, 동일가중지수를 시장지수로 선택한 시장모형 혹은 시장조정모형으로 초과수익률을 측정하고, 횡단면 독립성을 가정한 검정법이 가장 적합한 모형으로 나타났다. 그리고, 사건일 집중현상으로 인한 제1종 오류를 감소시키는 데에는 개별주식의 초과수익률 간의 횡단면 독립성을 가정한 검정법보다는 횡단면 중속성을 조정한 검정법을 사용하는 것이 더욱 효과적이다.

  • PDF

The Rationalization through Comparative Analysis of Price Fluctuation Adjustment Method (물가변동 조정방법의 비교분석을 통한 합리화 방안)

  • Kim, Seong-Hee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.67-76
    • /
    • 2012
  • There are index adjustment method and item adjustment method in estimation methods for price fluctuation rate of public constructions. A relevant regulation has put item adjustment method as a principle, but in most construction, contract sum adjustment has been made by index adjustment method. Hence, this study, by figuring out width and causes of the gap between index adjustment method and item adjustment method through direct comparative analysis, solved inequality caused by difference between them and suggested a rational way against irrationality of each method. For building operations of public housing construction, a detailed fluctuation rate by index adjustment method and item adjustment method of construction cost elements of the same construction, that is, direct material cost, direct labor cost and historical construction cost was estimated to analyze difference between two adjustments and establish its cause. Across the analysis, it was found that fluctuation rate by item adjustment method was estimated lower than that by index adjustment method and difference between methods for estimating fluctuation rate of quotation unit price and application of index unrelated to construction type and construction nature are main causes of the difference. This study has a significance in that, for smooth contract sum adjustment between contracting parties, it practically proved the real difference between adjustment methods by conducting comparative analysis of the difference in direct correspondence way.

A Study on the introduction of the outpatient and inpatient conversion factors in the 2020 Physician Fee Contract (외래⦁입원 환산지수에 기초한 2020년도 환산지수 산출 연구)

  • O, Dongil
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.4
    • /
    • pp.183-194
    • /
    • 2021
  • In this study, the conversion factor for 2020 is estimated based on an outpatient and inpatient conversion factor separation model developed from SGR and AR by using actual medical expense data. In addition, a policy plan is proposed to calculate the values of single and multiple conversion factors for each type of medical expense, and to effectively use the conversion factor separation model as one of the means to establish a medical delivery system. The major results are as follows. First, at r=0.1, the rate of adjustment in the hospital single conversion index in 2020 was 2.0%, and the outpatient and hospitalization conversion rates for hospitals were 2.2% and 2.3%, respectively. In addition, a combination of outpatient and inpatient conversion factors can be used for the adjustment. Second, as a measure to establish a medical delivery system, instead of adjusting the addition rate, a method of interlocking the addition rate and the conversion factor is proposed. Third, it is necessary to develop a model that enables target management of volumes, in addition to the outpatient conversion factor, the inpatient conversion factor, and the adjustment coefficient.

A Study on the Policies to improve the Escalating Regulations of Construction Price - With a Focus on Results of a Delphi Survey - (물가 변동에 따른 건설공사비 조정 제도의 개선 방안 - 델파이(Delphi) 설문 조사 결과를 중심으로 -)

  • Choi Min-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.203-211
    • /
    • 2004
  • This study is the results to survey on the problems and improvable Policies for current escalation system in construction contracts, through a Delphi survey to experts. From the survey results, it is desirable to decide the fluctuation rate of construction cost, which is the requirement of escalation clause, on the basis of inflation rate or construction cost index. The desirable price fluctuation rate is proposed as a $3\%$ level. However, it is difficult for construction companies to cope with the sudden increase of material price in advance, arising from short-term shock factors such as exchange rate and international raw material's price. Accordingly escalation system for specified materials, as an exceptional mode, should be introduced. As a method to calculate the fluctuation rate, ARCA(adjustment rate for the categories of articles) is more desirable than ARI(adjustment rate for an index), because the ARCA can be more reflected the characteristics of each construction work.To rationalize the ARI method, it is needed to announce the wage index, material index and machinery expense index via detailed classification by construction types. Also, it is desirable to prescribe the bidding date as a starting date of the price change, rather than contact signing date. considering the price change can happen since the biddiilg stage.

Improvement on the Managerial Method of Price Fluctuation System (물가변동제도 운영방식 개선방안)

  • Lee, Jae-Seob;Shin, Young-Chul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.2
    • /
    • pp.3-11
    • /
    • 2011
  • There are several causes to recalculate the contract amount in public construction projects. Among them, the escalation clause was introduced in 1969 and now the condition to recalculate the cost is effective after 90 days from the date of contract and the rate of fluctuation should be more than 3% from the date of bidding. The two calculation methods for the rate of fluctuation are item-adjustment and index-adjustment. According to the results of investigation into 4 public institutions and 163 projects, all of them have used the method of index-adjustment and the rate of projects that spend over 6 months obtaining the approval of contract amount adjustment is more than 90%. The reason for spending lots of time is caused by problems of the calculation method on the price fluctuation rate. Therefore, it is necessary that the calculation method should be diversified to cope with the problems and a option of the builder should be expanded as well. Furthermore, if the way to apply correction factors to construction price index and average index based on the producer and consumer price index made by the bank of Korea is added, then the duration will be reduced without additional expenses. This study proposed the diversification of the calculation method using price fluctuation rate and builders' expanded options as improvement on the managerial method of Price Fluctuation System for the prompt and efficient contract amount adjustment.

시차종속변수(時差從屬變數)에 의한 우리 나라 원목수요분석(原木需要分析)

  • Kim, Jun-Sun
    • Environmental and Resource Economics Review
    • /
    • v.8 no.1
    • /
    • pp.131-147
    • /
    • 1998
  • 본 논문은 시차종속변수를 이용한 우리 나라 원목수요분석을 통해 장기원목수요의 변화를 예측하는 데 그 목적이 있다. 원목수요는 재화의 특성상 파생수요를 전제하여 분석하였다. 분석에서는 1970년부터 1996년까지 27년간의 원목수요 자료를 이용하였다. 원목수요는 1980년대 들어서면서 1970년대와 같은 빠른 증가는 아니지만 지속적으로 완만히 증가하다가 1991년을 정점으로 하향 안정세를 보이고 있다. 분석에서는 적응적 기대모형과 부분적 조정모형을 사용하였다. 1977년에서 1979년까지 원목수요량의 급격한 증가를 설명하기 위하여 모형내에 더미변수를 사용하였다. 설명변수는 원목가격, 더미변수, 파생재화(목재 및 나무제품)의 가격과 시차종속변수를 이용하였다. 분석 결과, 적응적 기대모형은 시차종속변수를 사용해야 할 만큼 유의한 결과를 얻을 수 없었다. 하지만 부분적 조정모형에서는 각 변수의 추정치가 전반적으로 유의하게 나타났다. 특히, 시차종속변수 추정치에 대한 t값이 2.07로 유의하게 나옴으로써 모형의 설명력을 높여 주었다. 부분적 조정모형의 수정계수는 0.74 정도로 나타났다. 부분적 조정모형의 가정하에 2010년까지 매년 원목가격지수 6.7%와 국내 목제품가격지수 5.8% 상승률에 근거한 방법과 원목가격지수 6.8%와 목제품가격지수 5.6%로 전제하여 원목수요를 전망하였다. 그 결과, 원목수요는 지속적으로 상승하는 것으로 나타났다. 일정한 가격상승률을 전제한 예측수요량이 일정한 가격지수의 상승을 전제한 경우보다 높게 나타났다.

  • PDF

A Study on the Linear Causality between KOSPI200 Intraday Futures Returns and Cash Returns (KOSPI 200 하루중 선물수익률과 현물수익률간의 선형인과성에 관한 연구)

  • Kim, Tae-Hyuk;Kang, Seok-Kyu
    • The Korean Journal of Financial Management
    • /
    • v.17 no.1
    • /
    • pp.203-226
    • /
    • 2000
  • 본 연구는 주가지수 선물시장이 도입된 1996년 5월 3일부터 1998년 12월 5일까지 1분 간격 KOSPI 200 선물가격과 현물가격의 거래자료를 이용하여 각 선물가격과 기초자산가격간의 관계와 상호작용을 검토하는데 있다. 특히 본 연구는 차익거래자나 초단기 투기자(scalper)들이 거래체결을 위해 촌각을 다투는 선물시장의 거래행태에서 볼 때, 경제적 의미를 부여할 수 있는 1분 간격 수익률 자료를 이용함으로써 시장참여자의 실제 거래에서 표출되는 정형화된 현상을 정확히 파악한다는 점에서 중요하다. 본 연구의 주요 결과를 제시하면 다음과 같다. 첫째, 주가지수 선물시장과 현물시장간에 체계적이고 긴 선도-지연 관계가 발견되었다. 주가지수 선물가격의 변화가 현물가격의 변화를 대략 26분 정도 선도하고 있으며, 대략 5분 정도 현물시장의 선도효과도 발견된다. 따라서 KOSPI 200 선물수익률과 현물수익률간의 선도-지연 관계는 한 시장에서 다른 시장으로의 일방적인 것이 아니라 시장간의 피드백(feedback)효과가 존재하며, 선물의 선도효과가 지배적인 것으로 보인다. 이러한 선도-지연 현상은 노이즈에 의한 비동시거래보다는 거래비용과 공매제약 차이 등 각 시장의 제도적 차이에 의해 발생하는 것으로 보여진다. 둘째, 약세시장 하에서 선물의 선도효과가 더욱 크게 나타났다. 이러한 현상은 약세시장 하에서 현물시장의 공매제약이 선물가격과 현물가격간의 괴리를 더욱 크게 하여 선물가격이 현물지수를 더욱 선도하게 하는 요인이 될 수도 있음을 나타내는 것이다. 셋째, 만기별 하위기간 중 97년 6월과 97년 12월을 제외한 기간은 선물과 현물가격간에 장기 안정적인 균형관계가 성립함을 발견하였다. 넷째, ARMA(p, q) 여과를 거친 선물과 현물수익률을 이용하여 97년 6월과 12월은 백터자기회귀(VAR)모형, 그 외의 기간은 오차수정(EC)모형으로 추정하였다. 표본전체기간동안 장기균형오차에 대한 조정은 선물과 현물시장에서 동시에 이루어지고 있으며, 시장간에 발생하는 불균형 상황은 아비트라지 거래로 조정되고 있음이 발견되었다. 각 만기별 모든 하위기간에 있어서는 시장간의 장기 불균형 상황이 현물시장을 통해서 조정되고 있으며, 시장이 성숙된 최근의 만기 98년 12월 하위기간에서는 선물의 15분 선도효과와 현물의 1분 선도효과가 발견되어 선물의 선도효과가 지배적임을 발견하였다.

  • PDF

한국주식시장(韓國株式市場)에서의 주가지수(株價指數) 선택(選擇)에 따른 기업규모효과(企業規模效果)의 실증결과(實證結果) 비교분석(比較分析)

  • Hwang, Seon-Ung
    • The Korean Journal of Financial Management
    • /
    • v.10 no.2
    • /
    • pp.303-317
    • /
    • 1993
  • Banz(1981)와 Reinganum(1981)에 의한 실증연구에 의한 소기업과 대기업간의 수익률차이는 자본자산가격결정모형(CAPM)에 의하여 설명될 수가 없는 결과 즉, 과거의 체계적 위험과 기업규모를 기준으로 보면 도구변수(instrumental variable)인 기업규모는 추정된 CAPM의 베타에 대하여 통제한 연후에도 포트플리오간의 평균수익률에 대하여 통계적으로 유의적인 설명력을 가진다는 것이다 이것은 주식의 위험조정후수익률(risk-adjusted return)이 기업규모와 부(負)의 관계에 있다는 것으로서, CAPM으로서는 설명되지 않는 이상(異常)수익률 현상이다. Banz와 Reinganum 이후 미국학계에서 그동안 수많은 연구들이 규모효과에 대한 설명을 시도하였으나 아직도 완전한 설명은 존재하지 않고 있다. 본 연구는 우리나라 주식시장에서의 규모효과 존재여부에 관한 기존의 몇몇 연구들이 갖고 있는 방법론상의 문제점들을 제거함으로써 규모효과의 존재여부를 새로이 검증하였다. 특히, 동일가중지수수익률(equal-weighted index return)은 효율적 포트폴리오수익률이 나 종합주가지수수익률은 비효율적 포트폴리오수익률이라는 황선웅 이일균(1991)의 연구 결과를 고려하여, 시장수익률 대용치로서 종합주가지수수익률을 사용할 경우 규모효과의 검증결과가 어떠한 영향을 받는지도 아울러 분석하였다. 1980-90년의 기간을 대상으로 하여 실증분석한 결과, 먼저 동일가중지수수익률을 시장수익률로 사용할 경우 체계적위험 추정치와 기업규모간에는 부(負)의 관계가 존재하고 있음이 관측되고 있으며, 기업규모포트폴리오의 초과수익률 추정치도 대형주는 물론 소형주의 경우에도 통계적으로 유의하게 영(零)과 다르지 않다. 그 결과 최소한 1980-90년의 경우 우리나라 주식시장에는 규모효과가 존재하였다는 실증적 증거가 발견되지 않는다. 그러나 종합주가 지수수익률을 시장수익률로 사용하면 소형주에 대한 체계적위험이 대형주의 경우보다 오히려 작게 나타나고 있으며, 그에 따라 통제적으로 유의한 규모효과가 존재하는 것처럼 나타나고 있어 종합주가지수수익률은 시장수익률 대용치로 적절하지 않음을 제안하고 있다.