• Title/Summary/Keyword: 지속가능한 프로젝트 관리

Search Result 86, Processing Time 0.026 seconds

Wiki-based Interactive Electronic Technical Manuals (IETM) for Construction Project Management : Through a Case Study of Urban Regeneration Projects (Wiki기반 건설 사업관리 전자매뉴얼 : 도시환경정비사업 사례연구를 통해)

  • Park, Moon-Seo;Kang, Sung-Hoon;Lee, Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.3
    • /
    • pp.3-12
    • /
    • 2010
  • Recently, workers on construction sites can hardly understand their tasks and the process of the tasks because the construction projects are becoming large and complex. Due to the complexity, workers need a tool that can help them understand their works and some paper-based manuals exist to support them. However, the existing paperbased manuals are not actively used by workers due to the low credibility of information on the manual. In particular, paper-based manual can not be updated frequently because those manuals have to be manually updated by experts. Thus, the credibility of information is decreased and the decrease let the users distrust information of the paper-based manual. Therefore, this research analyzed the feature of wiki-based system and suggested an wiki-based IETM(Interactive Electronic Technical Manual) system model that can be modified by users, and then conducted a survey through a prototype based on urban regeneration project. The result of the survey indicated that wikibased IETM can improve the stakeholder communication by reinforcing the process of creating knowledge as well as knowledge itself.

Checklist for the application of concurrent engineering in bridge construction (교랑 공사에 동시공학 적용을 위한 체크리스트 도출)

  • Park, Seaman;Park, Taeil;Kim, Hyoungkwan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.1
    • /
    • pp.3-11
    • /
    • 2013
  • As construction projects became larger and longer, the need for the construction technologies and innovative construction processes has been continuously increased in construction field. In response to this trend, construction industries tried to adopt the concurrent engineering which had been normally applied for manufacturing industries to develop the products with improved quality in a reduced time. However, the application of the concurrent engineering to construction field was limited due to the lack of advanced management system and incomplete theoretical backgrounds. In this regard, this study attempted to develop a checklist for the successful application of concurrent engineering to bridge projects. To this end, this study presents the checklist for the application of concurrent engineering to construction projects. Further, the checklist was modified and updated to reflect the specific feature of the bridge construction using expert interviews. With the help of additional 188 experts, a questionnaire-based survey was also conducted to validate the checklist. In addition, using importance-performance analysis(IPA), the study identified the factors needed for intensive improvement. Consequently, the proposed checklist is expected to be useful, because it improves the applicability of the concurrent engineering in that it enables managers to monitor construction progress and further to protect the project from potential risks.

Automated Construction Progress Management Using Computer Vision-based CNN Model and BIM (이미지 기반 기계 학습과 BIM을 활용한 자동화된 시공 진도 관리 - 합성곱 신경망 모델(CNN)과 실내측위기술, 4D BIM을 기반으로 -)

  • Rho, Juhee;Park, Moonseo;Lee, Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.5
    • /
    • pp.11-19
    • /
    • 2020
  • A daily progress monitoring and further schedule management of a construction project have a significant impact on the construction manager's decision making in schedule change and controlling field operation. However, a current site monitoring method highly relies on the manually recorded daily-log book by the person in charge of the work. For this reason, it is difficult to take a detached view and sometimes human error such as omission of contents may occur. In order to resolve these problems, previous researches have developed automated site monitoring method with the object recognition-based visualization or BIM data creation. Despite of the research results along with the related technology development, there are limitations in application targeting the practical construction projects due to the constraints in the experimental methods that assume the fixed equipment at a specific location. To overcome these limitations, some smart devices carried by the field workers can be employed as a medium for data creation. Specifically, the extracted information from the site picture by object recognition technology of CNN model, and positional information by GIPS are applied to update 4D BIM data. A standard CNN model is developed and BIM data modification experiments are conducted with the collected data to validate the research suggestion. Based on the experimental results, it is confirmed that the methods and performance are applicable to the construction site management and further it is expected to contribute speedy and precise data creation with the application of automated progress monitoring methods.

특집 - 글로벌 비즈니스 허브, 송도

  • 인천경제자유구역청
    • 월간 기계설비
    • /
    • s.235
    • /
    • pp.41-46
    • /
    • 2010
  • 인천국제공항에서 불과 15분 거리며 비행거리 3시간 반 이내에 중국, 러시아, 일본 등을 빠르게 오갈 수 있는 곳. 바로 송도 국제도시이다. 지금 송도가 새롭게 변신하고 있다. 머지않아 송도는 한국을 동북아시아의 비즈니스 허브로 자리매김하는 데 핵심적인 역할을 할 것으로 예상된다. 송도는 송도국제업무단지 경제자유구역으로 지정된 세계 최초의 신(新) 지속 가능 개발 도시이다. 여러 종류의 주거용 건물과 상가 건물 및 학교뿐만 아니라 건강관리 시설과 쇼핑 외식 엔터테인먼트 시설까지 전세계에서 영감을 얻은 마스터플랜에 따라 최대의 시너지 효과를 내도록 설계되었다. 또한 건축물과 대중교통의 연계선 및 건물 설계상의 에너지 저감, 모든 종류의 녹지 공간 및 주거 공간의 효율적인 인프라 등 대규모 친환경 설계에 대한 새로운 기준이 되고 있다. 송도국제업무단지에서는 세계 최고 수준의 친환경 도시를 건설하기 위하여 대부분의 프로젝트에 LEED인증을 추진하고 있다. 본지는 인천 송도지구 개발의 기본 방향과 계획에 대해 살펴보고 특히 국제업무단지의 친환경 설계와 구체적인 설비기술에 대해 알아본다.

  • PDF

국제선급협회 선박 사이버복원력 규정 분석 및 대응방안

  • 임정규;유진호;박개명
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2023.11a
    • /
    • pp.205-207
    • /
    • 2023
  • 국제선급연합회(International Association of Classification Societies: IACS)에서는 2022년 선박 및 기자재시스템 사이버 복원력 달성을 위한 공통규칙 UR E26, E27을 발행하였으며, 이 규정은 2024년 1월 이후 건조 계약되는 선박에 의무적으로 적용될 예정이다. 현존선의 경우, OT 시스템 네트워크 변경 및 사이버보안 기능을 신규 구현하기가 어렵기 때문에 사이버 위험관리에 한계가 있으나, 본 규정을 통해 신조선 건조 단계에서 설계 보안 (secure by design)을 고려한 선박 사이버 복원력 네트워크 및 기능 구현이 가능하다. 사이버복원력 생태계가 잘 형성되기 위해서는 선주, 조선소, 제조사, 선급 등 주요 이해관계자의 역할이 중요하며 향후 다양한 프로젝트를 통한 사이버복원력 체계 내재화, 재직자 사이버보안 역량 강화, 선박 사이버안전 기술 지속적 연구가 필요하다.

  • PDF

Adapting PMO(Project Management Office) to EA-based national informatization (EA 기반의 국가정보화 PMO제도 적용·활용 방안 연구)

  • Lee, Jae-Du;Kang, Sun-Mu;Kim, Tae-Wan
    • Annual Conference of KIPS
    • /
    • 2009.04a
    • /
    • pp.597-600
    • /
    • 2009
  • 최근의 정보화환경을 반영한 정보화 관리방법과 도구의 통합 활용에 대한 필요성이 대두되고 있다. 이제는 기존 프로젝트관리 방식만으로는 다원화된 업무, 고객 요구를 충족시키지 못한다. EA, PMO 등 보다 발전된 방법들을 도입하고 활용해야 한다. 그러나 아직도 공공부문 정보화추진에 유용한 개념과 도구들을 통합적으로 활용하지 못하는 것이 현실이다. 공공부분 정보화 정책 환경이 변했지만 아직 현실에 맞게 그러한 사항들이 반영되어 있지 않다. 변화에 맞게 적절한 수단과 방법을 개발하고 지속적으로 발전시키지 못하면 기대한 효과를 거두기도 어렵다. 이제는 CIO 등 정보화를 추진하는 여러 주체가 범정부 EA, IT거버넌스, IT아웃소싱, 각종 지침과 기준 등을 통해 업무생산성을 제고할 수 있는 새로운 접근방법에 대한 제시가 필요하다. 이를 위해 본 연구에서는 EA기반의 PMO제도 적용 활용을 위해 방법론 및 도구의 통합적 활용이 가능한 모델을 제시하고자 한다. 연구방법은 기존 연구결과, 정책, 사업에 대한 문헌연구 및 분석 등을 통해 함의를 도출한다. 결과는 공공부문 정보화 추진 시 생산성 제고를 위한 참조 및 연관되는 유사 IT정책을 추진할 때 방향 정렬(Alignment)에 필요한 시사점 제공과 선행연구로서 의미가 있으리라 기대한다.

A Fundamental Study on the Development of Indicators for the Assessment of Design Quality (건축설계 품질 평가지표 개발을 위한 기초연구)

  • Choi, Yeon-Ju;Yi, June-Seong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.584-587
    • /
    • 2006
  • Quality assessment of the building is strongly dependent upon satisfying owner's requirements. To develop indicators for the assessment of design quality, survey on current situation of design process and analysis of Design Quality Indicator(DQI) is performed. The survey revealed that the main cause of frequent design changes is variability feature of owner's requirements. DQI, an indicator developed in UK, questionnaire encompasses questions which are relevant throughout the development stages of a building, and can be used at every key stage of the process. Further research will focus on the development of indicators for the assessment of design quality applicable to Korean market. In addition, research on the visualization method to present assessment results and supporting tools to facilitate assessment will be considered.

  • PDF

Extraction of the Key Performance Indicators of Construction Management Using Balanced Score Card (균형성과표를 활용한 건설사업관리의 핵심성과지표 도출)

  • Lim, Wooseok;Jung, Jihyun;Lee, Hakki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.6
    • /
    • pp.22-30
    • /
    • 2015
  • Enterprises should set up realizable goals and continually control the goals from apprehending whether they can be realized or not so that the enterprises grow consistently. Furthermore, from supplementing parts to be improved, goals are reset and the result should be controlled in order to fit to them. Lately, a lot of discussions about the results of organizations, projects, and companies are being realized in construction field. Particularly, in construction management, effective and professional control activities throughout the life cycle of facilities as well as the stage of business implementation of construction work are needed. About the result measurement of the construction management, lots of most domestic researches stay in the level of establishing basic concepts. Also, since characteristics of the construction field and the construction management were not reflected properly, it is in a situation that the result control system is not applied to on-site real works. Hence, this study intends to suggest fundamental data for measuring objective results from extracting result areas and key performance indicators of the construction management using Balanced Score Card.

KMSCR: A system for managing knowledge assets of an IT consulting firm (IT 컨설팅 회사의 지적 자산 관리를 위한 지식관리시스템)

  • 김수연;황현석;서의호
    • Proceedings of the Korea Inteligent Information System Society Conference
    • /
    • 2001.06a
    • /
    • pp.233-239
    • /
    • 2001
  • 최근 대부분의 회사들은 업무를 수행하는데 필요한 지식과 노하우를 공유하고 재사용하기 위하여 지적 자산 관리의 중요성을 인식하고 있다. 특히 고도로 지식 집약적인 업종이라 할 수 있는 IT컨설팅 회사에서는 지적 자산의 관리가 다른 어떤 회사에서보다 큰 중요성을 가지게 된다. 컨설팅 회사에 있어서 검증이 완료된 지적 자산의 공유 및 지능적이면서도 신속한 검색은 컨설팅 서비스의 품질과 고객 만족에 직결되는 중요한 요소이다. 따라서 대부분의 컨설팅 회사들은 자사의 지식 자산을 관리하기 위하여 많은 노력을 기울이고 있다. 본 논문의 목적은 IT 컨설팅 회사예서 관리되는 다양한 형태의 지적 자산들을 중앙 관리하여 설친 고객 사이트에 흩어져 프로젝트를 수행하는 컨설턴트들이 공유할 수 있도록 함으로써 컨설팅 서비스의 생산성과 품질들 높이고자 하는데 있다 이를 위하여 건설팅 회사에서 관리되는 모든 지적 자산의 재고를 조사하여 모델링하고 이를 쉽게 저장하고 검색할 수 있는 시스템 아키텍처를 제안한다. 제안된 아키텍처를 NT 기반에서 Index server를 이용하여 시스템으로 구현하였다 (KMSCR: A Knowledge Management System for managing Consulting Resources). KMSCR에서는 컨설턴트가 찾고자 하는 검색어를 입력하면 다양한 포맷의 (.doc, .ppt, xls, .rtf, .txt, .html 등과 같은) 결과물을 관련성이 높은 순서대로 출력해 줌으로써 컨설팅 리소스를 효과적으로 재사용할 수 있도록 도와 준다. 또한 검색 시에는 미리 등록된 키워드 뿐 아니라 본문 내의 텍스트 검색까지 가능하게 함으로써 컨설팅 리소스에 대한 보다 효과적이고 효율적인 검색을 가능하게 한다.간을 성능 평가 인자로 하여 수행하였다. 논문에서 제한된 방법을 적용한 개선된 RICH-DP을 모의 실험을 통하여 분석한 결과 기존의 제한된 RICH-DP는 실시간 서비스에 대한 처리율이 낮아지며 서비스 시간이 보장되지 못했다. 따라서 실시간 서비스에 대한 새로운 제안된 기법을 제안하고 성능 평가한 결과 기존의 RICH-DP보다 성능이 향상됨을 확인 할 수 있었다.(actual world)에서 가상 관성 세계(possible inertia would)로 변화시켜서, 완수동사의 종결점(ending point)을 현실세계에서 가상의 미래 세계로 움직이는 역할을 한다. 결과적으로, IMP는 완수동사의 닫힌 완료 관점을 현실세계에서는 열린 미완료 관점으로 변환시키되, 가상 관성 세계에서는 그대로 닫힌 관점으로 유지 시키는 효과를 가진다. 한국어와 영어의 관점 변환 구문의 차이는 각 언어의 지속부사구의 어휘 목록의 전제(presupposition)의 차이로 설명된다. 본 논문은 영어의 지속부사구는 논항의 하위간격This paper will describe the application based on this approach developed by the authors in the FLEX EXPRIT IV n$^{\circ}$EP29158 in the Work-package "Knowledge Extraction & Data mining"where the information captured from digital newspapers is extracted and reused in tourist information context.terpolation performance of CNN was relatively

  • PDF

Establishment of WBS·CBS-based Construction Information Classification System for Efficient Construction Cost Analysis and Prediction of High-tech Facilities (하이테크 공장의 효율적 건설 사업비 분석 및 예측을 위한 WBS·CBS 기반 건설정보 분류체계 구축)

  • Choi, Seong Hoon;Kim, Jinchul;Kwon, Soonwook
    • The Journal of the Korea Contents Association
    • /
    • v.21 no.8
    • /
    • pp.356-366
    • /
    • 2021
  • The high-tech industry, a leader in the national economy, has a larger investment cost compared to general buildings, a shorter construction period, and requires continuous investment. Therefore, accurate construction cost prediction and quick decision-making are important factors for efficient cost and process management. Overseas, the construction information classification system has been standardized since 1980 and has been continuously developed, improving construction productivity by systematically collecting and utilizing project life cycle information. At domestic construction sites, attempts have been made to standardize the classification system of construction information, but it is difficult to achieve continuous standardization and systematization due to the absence of a standardization body and differences in cost and process management methods for each construction company. Particular, in the case of the high-tech industry, the standardization and systematization level of the construction information classification system for high-tech facility construction is very low due to problems such as large scale, numerous types of work, complex construction and security. Therefore, the purpose of this study is to construct a construction information classification system suitable for high-tech facility construction through collection, classification, and analysis of related project data constructed in Korea. Based on the WBS (Work Breakdown Structure) and CBS (Cost Breakdown Structure) classified and analyzed through this study, a code system through hierarchical classification was proposed, and the cost model of buildings by linking WBS and CBS was three-dimensionalized and the utilized method was presented. Through this, an information classification system based on inter-relationships can be developed beyond the one-way tree structure, which is a general construction information classification system, and effects such as shortening of construction period and cost reduction will be maximized.