• Title/Summary/Keyword: 중견건설업체

Search Result 11, Processing Time 0.017 seconds

Material Planning Model for Multi-Project Management in Medium-sized Construction Companies (중견건설업체의 다중현장관리를 위한 자재조달계획 지원 모델)

  • Jung Sung-Lim;Han Ju-Yeon;Kim Kyung-Rai;Shin Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.106-114
    • /
    • 2004
  • As the scale of construction work is enlarged, complicated and diversified, much construction information from the large number of construction sites is generated and reported to the head office. To control much information generated in construction sites simultaneously, the necessity of supporting system which could extract necessary information is increased. However, comparing with those of large companies, medium-sized companies's organization of head office and management system are weak. So it's difficult to manage multi-projects. Among these site managements, resource management is an important management area. But, resource planning is based on experience and judgement and has not associated with schedule information. So when schedule is changed, the plan must be amended manually. This study investigates material-planning model for multi-project management which is connected with daily report system and scheduling software.

Material Planning Model for Multi-Project Management in Medium-sized Construction Companies (중견건설업체의 다중현장관리를 위한 자재소요계획모델)

  • Jung Sung-Lim;Han Ju-Yeon;Kim Kyung-Rai;Shin Dong-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.598-601
    • /
    • 2003
  • As the scale of construction work is enlarged, complicated and diversified, construction information from the large number of construction sites is happened and reported to the head office. To control much information generated in construction sites simultaneously, the necessity of supporting system which can extract necessary information is increased. However, compare with large companies, medium-sized companies's organization of head office and management system is weak, so it's difficult to manage multi-projects. Among these site managements, resource management is an important management area. But, resource planning is based on experience and judgement and have not associated with schedule information. So when schedule if changed, the plan must be amended manually. This study investigates material-planning model for multi-project management which is connected with daily report system and scheduling software.

  • PDF

해외에 진출하고 있는 건설 업체

  • Kim, Dae-Hwan
    • 주택과사람들
    • /
    • s.201
    • /
    • pp.52-53
    • /
    • 2007
  • 국내 건설 업체의 해외 진출이 봇물을 이루고 있다. 삼성, 대우, 우림, 현진, 월드, 반도 등 중견 건설 업체들이 해외 건설에 박차를 가하고 있다. 2007년 국내 건설 업체들의 해외 건설 사업 진출에 대한 기대가 더욱 커지고 있다.

  • PDF

A Profit Prediction Model in the International Construction Market - focusing on Small and Medium Sized Construction Companies (CBR을 활용한 해외건설 수익성 예측 모델 개발 - 중소·중견기업을 중심으로 -)

  • Hwang, Geon Wook;Jang, woosik;Park, Chan-Young;Han, Seung-Heon;Kim, Jong Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.4
    • /
    • pp.50-59
    • /
    • 2015
  • While the international construction industry for Korean companies have grown in market size exponentially in the recent years, the profit rate of small and medium sized construction companies (SMCCs) are incomparably lower than those of large construction companies. Furthermore, small and medium size companies, especially subcontractor, lacks the judgement of project involvement appropriateness, which leads to an unpredictable profit rate. Therefore, this research aims to create a profit rate prediction model for the international construction project focusing on SMCCs. First, the factors that influence the profit rate and the area of profit zone are defined by using a total of 8,637 projects since the year 1965. Seconds, an extensive literature review is conducted to derive 10 influencing factors. Multiple regression analysis and corresponding judgement technique are used to derive the weight of each factor. Third, cased based reasoning (CBR) methodology is applied to develop the model for profit rate analysis in the project participation review stage. Using 120 validation data set, the developed model showed 11% (14 data sets) of error rate for type 1 and type 2 error. In utilizing the result, project decision makers are able to make decision based on authentic results instead of intuitive based decisions. The model additionally give guidance to the Korean subcontractors when advancing into the international construction based on the model result that shows the profit distribution and checks in advance for the quality of the project to secure a sound profit in each project.

A Study on the Analysis of Critical Success Factors for Information Service on Construction Technology Information Sites (건설기술정보 사이트 안내서비스에 대한 핵심성공요인 분석을 위한 방안 연구)

  • Jeong, Seong-yun
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2018.05a
    • /
    • pp.461-462
    • /
    • 2018
  • 건설기술정보시스템(CODIL)에서는 2016년부터 중소 중견 건설 및 엔지니어링 업체의 기술경쟁력 강화에 도움을 줄 수 있도록 건설기술정보 서비스 사이트에 대한 안내서비스를 제공하고 있다. 본 연구는 건설기술자에게 보다 유용한 정보서비스를 제공하기 위한 일환으로써, 선행연구사례의 조사, 분석을 통해 건설기술정보 서비스 사이트 안내서비스를 성공적으로 이끌어 내기 위한 평가영역과 평가항목을 분석하였다.

  • PDF

A Study on the Effective Management of the Safety and Health Diagnosis System in Construction Industry (건설업 안전보건진단제도의 실효적 관리방안 연구)

  • Yoon, Tea-Yong
    • Journal of the Society of Disaster Information
    • /
    • v.16 no.4
    • /
    • pp.723-733
    • /
    • 2020
  • Purpose: This study was designed to draw up problems with the safety and health diagnosis system, and designed a hierarchical survey model of the clauses prescribed by the Occupational Safety and Health Act. The purpose of the survey is to derive the effectiveness of the safety and health diagnosis system at the construction site by targeting three groups of experts. Method: This paper set up the legal status analysis and overseas related system analysis and AHP hierarchy analysis survey model. In addition, the validity of the analysis results was verified by a survey. Results: The analysis of the survey items showed a high importance on items included in the human utilization and the precision of the pre-plan. In particular, mid-sized construction companies showed the highest importance for their active activities after the safety and health diagnosis. Conclusion: Through this study, we should recognize problems for improving the safety and health system of construction industry and prepare policy and institutional improvement measures for experts.

A Study on Substantiation Methodology for Extension of Time in International Mega-Project Claims (해외 대형건설공사 공기지연클레임의 공기연장기간 입증방법)

  • Kim, Young-jae;Kim, Tae-kyoung;Jo, Duk-sang;Lee, Hwang-ku
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.3
    • /
    • pp.165-176
    • /
    • 2015
  • Recently many Korean large-sized construction companies as well as specialty contractors have been expanding their business in the overseas market to mitigate impacts from long-term stagnation in the domestic market. Such as a result, it has been arisen as a major issue that contractors effectively manage the delays which have been commonly faced with in international mega-projects. Therefore it can be said that the ability of the delays management leads a success of project. This paper presents a review of literature for delay analysis methods such as time impact analysis(TIA) and raises practical problems to rationally substantiate the duration of extension of time(EoT) in international mega projects which have wide scope of works as well as complicated and detailed contract baseline programs by taking theoretical approaches. We suggest the two improvement concepts to substantiate the EoT claims which are effectively applicable to practical projects. The first is to sort out dominant delays among numerous delays in advance of applying a delay analysis. The second is to set up the delay sections with the advanced concept for analysing delays' effects by TIA. This study performed a case study on an actual international mega-project. to confirm the effectiveness of improvement concepts that this practical approach is applicable for the assessment of EoT. In conclusion, this paper supposes to provide practitioner in charge for an EoT claim with an advanced substantiation methodogy when they not only analyse the construction delays by using TIA, but also negotiate with stakeholders about with the assessment of EoT.

A Check List Development for Water Leakage Prevention in Educational Facility (교육시설물 누수방지 Check List 제안에 관한 연구 - 공법, 공간, 단계를 중심으로 -)

  • Kim, Song-Hwa;Kim, Jae-On;Son, Jae-Ho;Lee, Seung-Hyun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.546-550
    • /
    • 2008
  • Midium-size Companies have participated in most of the Educational Facility Construction. Since they are lack of special manpower, construction experience, and know-how, many construction defects cause. A water leakage is a typical construct defect in the educational facility construction. A water leakage prevention has to be careful considered in plan, construction and maintenance stages. Therefore, this study suggests Check List for the water leakage prevention, which designer/engineer must consider in plan, construction, and maintenance stages for the educational facility.

  • PDF

Development of Evaluation System for Overseas Business Capability of Construction Firms (국내 건설기업의 해외건설능력 평가체계 개발)

  • Jang, Woosik;Yang, Hae-Beom;Han, Seung-Heon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.3
    • /
    • pp.977-987
    • /
    • 2014
  • Since 1960's, international construction market have explosively increase and have reached up to 600 Bil. US$ through active participation of construction firms and steady support of government. Nevertheless, owners, clients and financial institutions required reasonable criteria to effectively assess the overseas business capabilities of construction firms. However, the existing methods for construction firms rarely considers the perspective of overseas business capabilities. To overcome these problems, this study proposes an evaluation system for overseas business capabilities of construction firms. First, the needs for new evaluation system is derived through FGI, and the direction of new evaluation system is presented by reviewing the limitations of existing methods. Also, the capabilities that are required for the performances for overseas businesses were analyzed through expert interviews. Finally, 31 primary evaluation indices consisting of 3 criteria - appropriateness of index, possibility of quantification, possibility of data gathering - are derived under 9 categories and 3 perspectives through surveys and consultation meeting. The preliminary investigation of 24 Korean construction firms are conducted for comparing the existing evaluation systems and to verify its applicability. The proposed method could provide a rational criterion to evaluate the construction firms, improve internal capacity of firms, and ultimately supports the success of the construction industry.