• Title/Summary/Keyword: 준공도면

Search Result 42, Processing Time 0.017 seconds

The Improvement of Real-time Updating Methods of the National Base Map Using Building Layout Drawing (건물배치도를 이용한 국가기본도 수시수정 방법 개선)

  • Shin, Chang Soo;Park, Moon Jae;Choi, Yun Soo;Baek, kyu Yeong;Kim, Jaemyeong
    • Journal of Cadastre & Land InformatiX
    • /
    • v.48 no.1
    • /
    • pp.139-151
    • /
    • 2018
  • The National Base Map construction consists of the regular correction work of dividing the whole country into two regions and carrying out the modification Plotting by aerial photographs every two years as well as the real time updating work of correcting the major change feature within two weeks by the field survey and the As-Built Drawing. In the case of the Building Layout Drawing of Korea Real estate Administration intelligence System(KRAS) used for real time updating work of the National base map, the coordinate transformation error is included in the positional error when applied to the National Base Map based on the World Geodetic Reference System as the coordinate system based on the Regional Geodetic Reference System. In addition, National Base Map is registered based on the outline(eaves line) of the building in the Digital Topographic Map, and the Cadastral and Architecture are registered based on the building center line. Therefore, the Building Object management standard is inconsistent. In order to investigate the improvement method, the network RTK survey was conducted directly on a location of the Building Layout Drawing of Korea Real estate Administration intelligence System(KRAS) and the problems were analyzed by comparing with the plane plotting position reference in National Base Map. In the case of the general structure with the difference on the Building center line and the eaves line, beside the location information was different also the difference in the ratio of the building object was different between Building center line and the eave. In conclusion, it is necessary to provide the Base data of the double layer of the Building center line and the outline of the building(eaves line) in order to utilize the Building Layout Drawing of Korea Real estate Administration intelligence System(KRAS). In addition, it is necessary to study an organic map update process that can acquire the up-to-dateness and the accuracy at the same time.

Development of Robotic Inspection System over Bridge Superstructure (교량 상판 하부 안전점검 로봇개발)

  • Nam Soon-Sung;Jang Jung-Whan;Yang Kyung-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.180-185
    • /
    • 2003
  • The increase of traffic over a bridge has been emerged as one of the most severe problems in view of bridge maintenance, since the load effect caused by the vehicle passage over the bridge has brought out a long-term damage to bridge structure, and it is nearly impossible to maintain operational serviceability of bridge to user's satisfactory level without any concern on bridge maintenance at the phase of completion. Moreover, bridge maintenance operation should be performed by regular inspection over the bridge to prevent structural malfunction or unexpected accidents front breaking out by monitoring on cracks or deformations during service. Therefore, technical breakthrough related to this uninterested field of bridge maintenance leading the public to the turning point of recognition is desperately needed. This study has the aim of development on automated inspection system to lower surface of bridge superstructures to replace the conventional system of bridge inspection with the naked eye, where the monitoring staff is directly on board to refractive or other type of maintenance .vehicles, with which it is expected that we can solve the problems essentially where the results of inspection are varied to change with subjective manlier from monitoring staff, increase stabilities in safety during the inspection, and make contribution to construct data base by providing objective and quantitative data and materials through image processing method over data captured by cameras. By this system it is also expected that objective estimation over the right time of maintenance and reinforcement work will lead enormous decrease in maintenance cost.

  • PDF