Closing Step Analysis in Cable-Stayed Bridges to Produce Initial Equilibrium Condition (초기평형상태 구현을 위한 사장교의 폐합단계 해석)

  • Park, Yong Myung;Yun, Jae Sun;Cho, Hyun Jun;Park, Chung Gon
    • Journal of Korean Society of Steel Construction
    • /
    • v.19 no.2
    • /
    • pp.191-199
    • /
    • 2007
  • This paper presents a closing method for a cable-stayed bridge erected by the free cantilever method to produce the initial equilibrium configuration at the final construction stage. To realize the initial equilibrium condition in cable-stayed bridge by the cantilever method, compatibility conditions for vertical displacements, rotational angles, and axial displacements at the closing section of both side girders should be satisfied. In this paper, it was shown that it can be accomplished by using some applicable loads during construction such as the pull-up force of the derrick crane, some cable tension forces, and jacking force at the pylon. The proposed method was applied to a construction stage analysis of a sample bridge to demonstrate its validity, and it was acknowledged that the tower was considerably affected by the compatibility condition for axial displacement in the closing step.

Comparative Study of Cable Tension Measurement Methods by In-situ Measurements on a Cable-stayed Bridge under Construction (시공 중 사장교 실측을 통한 케이블 장력 추정 기법 비교 연구)

  • Cho, Soo-Jin;Yim, Jin-Suk;Shin, Sung-Woo;Jung, Hyung-Jo;Yun, Chung-Bang;Wang, Ming.L.
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2011.04a
    • /
    • pp.48-51
    • /
    • 2011
  • 사장교에서 케이블은 하중을 지지하는 주요 부재로, 케이블 장력은 사장교의 건전성과 안전도 평가에 있어서 매우 중요한 변수이다. 케이블 장력을 추정하기 위한 대표적인 방법으로는 로드셀을 이용한 직접법과 진동 계측 자료를 이용한 간접법 등이 있으며, 최근에는 자기장-응력 관계를 이용한 EM(Elasto-Magnetic) 센서 측정법이 개발되어 케이블 장력 추정에 적용되었다. 본 논문에서는 세 가지 장력 추정 기법을 실제 시공중인 사장교에 적용하여, 그 성능을 상호 비교하였다. 본 연구는 한국의 KAIST와 미국 Northeastern 대학교의 공동연구로 수행되었다. 대상 교량은 부산 화명동과 김해 초정리를 연결하기 위해 현재 건설중인 화명대교이다. 화명대교의 교량 형식은 2주탑 콘크리트 사장교 (주탑 경간장 270m, 총 사장교 구간장 500m)이며, 사장재로는 MS (Multi-Strand) 형 케이블이 사용되었다. 실험 당시 화명대교는 중앙경간의 폐합 후 선형관리를 위한 장력조정작업을 수행하였으며, 케이블 재긴장시의 정확한 장력관리를 위하여 로드셀을 이용한 Lift-off test방법으로 케이블의 장력을 측정하였다. 이와 동시에 두 개의 케이블을 대상으로 진동 가속도 센서와 EM 센서를 설치하고 장력 계측을 수행하였으며, 재긴장 단계별 장력 변화치를 지속적으로 계측하였다. 계측된 결과를 바탕으로 케이블 장력 추정 기법의 정확성 및 실교량에서의 활용성을 비교하였다.

  • PDF

Measurement and Analysis of Wind Response of InCheon Bridge (인천대교의 풍응답 계측 및 분석)

  • Kim, Saang-Bum;Im, Duk-Ki;Park, Hyun-Woo
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2011.04a
    • /
    • pp.340-343
    • /
    • 2011
  • 장대 케이블 교량의 풍응답을 계측할 수 있는 무선센서네트워크 기반의 풍응답 계측시스템을 개발하고, 이를 사용하여 인천대교의 시공단계별로 고유진동수, Mode Shape과 같은 Modal Parameters의 변화를 추정하고 보강형에서의 풍압분포와 보강형, 주탑, 케이블의 가속도를 계측하여 내풍 성능을 분석하였다. 개발된 계측 시스템은 인천대교 사장교의 전체 거동을 계측할 수 있도록, 1.5km 범위에 넓게 분포된 최대 55 Nodes에서 최대 1kHz의 동기화된 계측을 수행할 수 있으며, 각 Node별로 3축가속도나 풍압을 측정할 수 있다. 전체 Node에서 가속도를 계측하는 경우에는 최대 165 Channel을 1kHz로 측정할 수 있다. Modal 해석의 경우에, 고가교, 접속교, 사장교 주탑, 보강형, 케이블의 시공 단계별 동특성의 변화를 추정하였으며, 고가교에서는 모드해석을 통해 역추정한 구조계수를 정적재하실험 및 실험실에서의 Mold 시험결과와 비교하였으며 사장교 케이블에서는 케이블 댐퍼의 성능을 분석하였다. 또한 인천대교 보강형에서의 풍압분포를 계측하였으며, 풍압의 공간상관관계를 분석하였고, 풍하중 및 풍진동 특성을 분석하여 가속도 계측 결과와 비교하였다. 계측 및 분석 결과를 바탕으로 장대교량의 내풍성능을 확보하고 향상시키는데 활용할 수 있을 것으로 기대한다.

  • PDF

열정! 건설현장 - SK건설 행정중심복합도시 금강 4교 건설현장

  • Jeong, Tae-Yeong
    • The Safety technology
    • /
    • no.196
    • /
    • pp.21-23
    • /
    • 2014
  • 수도권의 과밀화 해소와 국가균형발전을 위해 출범한 세종시 행정중심복합도시. 이곳은 지난해 말에 청사 2단계 입주가 이루어지면서 본격적으로 행정기능 중심 도시로 재탄생했다. 이에 따라 세종시에는 현재 도시기반 확충을 위한 인프라가 한창 구축되고 있다. 이 가운데 행정중심복합도시 내부를 순환하는 도로를 연결하는 금강 4교 건설공사 현장은 많은 이들의 이목을 끌고 있다. 국내에서 최초로 개방형의 사장교가 시공되고 있는 것은 물론 주탑이 세종시의 상징인 매를 형성화하는 등 그야말로 명품도시의 랜드마크로 여겨지고 있기 때문이다. 때문에 이곳을 시공하고 있는 SK건설에서는 철두철미한 안전관리를 전기하고 있다. 그 결과는 안전분야 최고의 권위를 자랑하는 '안전경영대상'에서 토목부문 대상을 수상하는 것으로 나타났다. 이곳의 안전관리가 어떻게 펼쳐지고 있는지 찾아가 봤다.

  • PDF

Stability Analysis of Steel Cable-stayed Bridges under Construction Stage (폐합 전 강사장교의 안정성 해석)

  • Kim, Seung-Jun;Shim, Kyung-Suk;Won, Deok-Hee;Cho, Sun-Kyu;Kang, Young-Jong
    • Journal of Korean Society of Steel Construction
    • /
    • v.23 no.1
    • /
    • pp.99-111
    • /
    • 2011
  • This paper presents an investigation of the structural stability of cable-stayed bridges in the construction stage, using geometric nonlinear finite-element analysis and considering various geometric nonlinearities, such as the sag effect of the cables, the P-${\Delta}$ effects of the girder and mast, and the large displacement effect. Initial shape analysis and construction-stage analysis were performed to determine the equilibrium of the structure in the construction stage. After that, geometric nonlinear analysis was performed to study structural stability. In this study, the weight of the derrick crane and the key segment were considered the main external loads, which were applied to the tip of the center span. The cable arrangement type and the stiffness ratios of the girder and mast were considered the main parameters of the analytic research. Based on the results of the analysis, the change in the buckling mode and critical load factors with respect to the cable arrangement type and the stiffness ratios of the girder and mast was investigated. The buckling modes of the steel cable-stayed bridges in the construction stage were classified, and the ranges of the stiffness ratios of the girder and mast, which show these classified buckling modes, were suggested.

Behavior Character Analysis of Super Long Suspension Bridge using GNSS (GNSS를 활용한 초장대 현수교의 거동 특성 분석)

  • Park, Je-Sung;Hong, Seunghwan;Kim, Mi-Kyeong;Kim, Tai-Hoon;Sohn, Hong-Gyoo
    • Korean Journal of Remote Sensing
    • /
    • v.35 no.5_2
    • /
    • pp.831-840
    • /
    • 2019
  • Recently, the span length of long-span bridges is getting longer. As a result, it has been suggested that a new concept called 'super long-span bridge'. In case of super long span bridges, the structure is being complicated and the importance of structural stability is being emphasized. However, until recently, the most commonly used sensors (dual axis clinometer, anemometer, strain gauge, etc.) have got limit about the bridge monitoring. Consequently, we researched the application of a Global Navigation Satellite System (GNSS) to improve the limit of the existing sensors. In this study, the dual axis clinometer, the anemometer and the strain gauge together with the GNSS were used to analyze the behavior of a super-long suspension bridge. Also, we propose the detailed method of bridge monitoring using the GNSS. This study consisted of three steps. First step calculated the absolute coordinates of the towers and the longitudinal axis direction of the study bridge using the GNSS. In second step, through the analysis of the long-term behavior in shortly after construction, we calculated the permanent displacement and evaluated the stability of main towers. Third step analyzed the behavior of bridge by the wind direction and was numerically indicated. Consequently, the bridge measurement using the GNSS appeared that the acquired data is able to easy processing according to the analysis purpose. If we will use together the existing measurement sensors with the GNSS on the maintenance of the super long-span bridge, we figure each error of measurement data and improve the monitoring system through calibration. As a result, we acquire the accurate displacement of bridge and figure the behavior of bridge. Consequently, we identified that it is able to construct the effective monitoring system.