A Study on the Design of the Slip-Form System for the Construction of Tapered Concrete Pylons (변단면 콘크리트 주탑공사의 슬립폼 시스템 적용을 위한 설계기술 연구)

  • Yoon, Hyejin;Kim, Young Jin;Chin, Won Jong;Kim, Hee Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.3
    • /
    • pp.128-135
    • /
    • 2014
  • This paper studied design of slip form system considering the erection of a pylon mock-up. The height of the pylon is 10 m. A rectangular hollow cross-section was considered. The outer and inner dimensions of the pylons were varied with respect to the height. The thickness of 1 sides among the 4 faces were varied. Accordingly the slip form was designed to respond to continuous changes in its dimensions and thickness. Structural analysis was conducted to examine structural safety of the slip form. Virtual construction by BIM proved its practicality. The developed design technologies were successfully applied to the erection of a 10m high pylon executed for field verification test.

Nonlinear Analysis of Incheon Bridge Considering Time-Dependent Behavior of Concrete Pylon (콘크리트 주탑의 시간 의존적 거동을 고려한 인천대교의 비선형 해석)

  • Ha, Su-Bok;Kim, Jin-Il;Hwang, Chang-Hee;Shin, Hyun-Mock;Kim, Moon-Young
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.25 no.2
    • /
    • pp.155-162
    • /
    • 2012
  • Recently, building of long span bridge is increasing and cable stayed bridges have large portion in civil projects. As the spans of bridges become longer, steel cable-stayed bridges have been constructed mainly for slim structure. But in many case, pylons are constructed by concrete for the stability of structures and the economy. Concrete is greatly influenced by the long-term behavior like creep and drying shrinkage, so analysis of stress redistribution and structural change in construction is required. In this study, as a cable stayed bridge with concrete pylon, Incheon Bridge is analyzed by nonlinear FEM analysis program RCAHEST. Through this analysis, time dependent effect of concrete pylon to whole cable stayed bridge system is studied.

Measurement and Proposed Design Specification of Temperature Distribution in the Concrete Pylon (콘크리트 주탑의 온도분포 계측 및 설계규정 제안)

  • Hwang, Eui-Seung;Shim, Jae-Soo;Kim, Do-Young
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.1
    • /
    • pp.1-8
    • /
    • 2014
  • This paper deals with monitoring and analysis of temperature measurement data in concrete pylon of long span cable bridges. During the construction of Geoga Bridge in Busan-Geoje Fixed Link Project, temperature sensors were installed in several sections of hollow box type concrete pylon and temperatures along the depth of the four sides of the section have been recorded along with ambient temperature. Effects of temperature distribution on the pylon are analysed using actual measured data and results are compared with the design guideline. It was found that the temperature load model for concrete girder can be applied to box type concrete pylon. Structural analysis of the pylon due to variation of temperature distribution during the construction is performed using 3D modelling and FE program and the maximum displacements of east-west and north-south side were calculated as 0.056m and 0.121m, respectively.