• Title/Summary/Keyword: 주입 시공

Search Result 166, Processing Time 0.021 seconds

A study on hydraulic behaviour and leakage control of segment linings using the numerical method (수치해석을 이용한 세그먼트라이닝의 수리거동과 누수제어 연구)

  • Shin, Jong-Ho;Shin, Yong-Suk;Pam, Dong-In;Chae, Sung-Elm;Choi, Kyu-Hoon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.11 no.2
    • /
    • pp.131-140
    • /
    • 2009
  • It has been repeatedly reported that a drainage system of a drained tunnel is deteriorated. And consequently the water pressure on the lining increases with time. However, little research on the watertight tunnel was found in the literatures. According to field measurements, leakage of the undrained tunnel has increased with time, which is completely opposite to the behavior of the drained tunnel. It is evident that the hydraulic deterioration of the tunnel lining changes the water pressure on the lining and the amount of leakage, thus the design coneept in terms of groundwater is not maintained tightly throughout the life time of the tunnel. The Segment lining is generally constructed as watertight. However, it is frequently reported that the leakage in the segment tunnel increases with time. It is also reported that the leakage is generally concentrated at the joints of the segments. In this study structural and hydraulic interaetion of the segment lining due to the hydraulic deterioration of the segments and the joints is investigated using the numerical modeling method. An electric utility tunnel below groundwater table is considered for the analyses. The effects of hydraulic deterioration of the segment lining are identified in terms of ground loading, water pressure and lining behavior. A remedial grouting measure for leakage is also numerically simulated, and its appropriateness is evaluated.

Performance Analysis of a Deep Vertical Closed-Loop Heat Exchanger through Thermal Response Test and Thermal Resistance Analysis (열응답 실험 및 열저항 해석을 통한 장심도 수직밀폐형 지중열교환기의 성능 분석)

  • Shim, Byoung Ohan;Park, Chan-Hee;Cho, Heuy-Nam;Lee, Byeong-Dae;Nam, Yujin
    • Economic and Environmental Geology
    • /
    • v.49 no.6
    • /
    • pp.459-467
    • /
    • 2016
  • Due to the limited areal space for installation, borehole heat exchangers (BHEs) at depths deeper than 300 m are considered for geothermal heating and cooling in the urban area. The deep vertical closed-loop BHEs are unconventional due to the depth and the range of the typical installation depth is between 100 and 200 m in Korea. The BHE in the study consists of 50A (outer diameter 50 mm, SDR 11) PE U-tube pipe in a 150 mm diameter borehole with the depth of 300 m. In order to compensate the buoyancy caused by the low density of PE pipe ($0.94{\sim}0.96g/cm^3$) in the borehole filled with ground water, 10 weight band sets (4.6 kg/set) were attached to the bottom of U-tube. A thermal response test (TRT) and fundamental basic surveys on the thermophysical characteristics of the ground were conducted. Ground temperature measures around $15^{\circ}C$ from the surface to 100 m, and the geothermal gradient represents $1.9^{\circ}C/100m$ below 100 m. The TRT was conducted for 48 hours with 17.5 kW heat injection, 28.65 l/min at a circulation fluid flow rate indicates an average temperature difference $8.9^{\circ}C$ between inlet and outlet circulation fluid. The estimated thermophysical parameters are 3.0 W/mk of ground thermal conductivity and 0.104 mk/W of borehole thermal resistance. In the stepwise evaluation of TRT, the ground thermal conductivity was calculated at the standard deviation of 0.16 after the initial 13 hours. The sensitivity analysis on the borehole thermal resistance was also conducted with respect to the PE pipe diameter and the thermal conductivity of backfill material. The borehole thermal resistivity slightly decreased with the increase of the two parameters.

Evaluation of Removal Efficiency of Pollutants in Constructed Wetlands for Treating Greenhouse Wastewater Under Different Filter Media, Configuration Methods and Agricultural Water Loading (시설하우스 농업배수 처리를 위한 인공습지에서 여재종류, 조합방법 및 부하량에 따른 오염물질 정화효율 평가)

  • Lee, Dong-Jin;Park, Jong-Hwan;Kim, Seong-Heon;Yoon, Chan-Woong;Cho, Ju-Sik;Lee, Seong-Tae;Heo, Jong-Soo;Seo, Dong-Cheol
    • Korean Journal of Ecology and Environment
    • /
    • v.47 no.1
    • /
    • pp.13-23
    • /
    • 2014
  • To obtain optimum filter media, configuration method and greenhouse wastewater loading in small-scale constructed wetlands (CWs) for treating greenhouse wastewater, the apparatuses were constructed with 4 kinds of combined systems such as vertical flow (VH)-Horizontal flow (HF), HF-VH, HF-VF-HF, VF-HF-HF CWs. The efficiencies of pollutants in greenhouse wastewater were investigated in various CWs under different filter media, configuration methods and agricultural water loading. Removal rates of pollutants under different filter media were in the other of coarse sand>broken stone${\fallingdotseq}$calcite${\fallingdotseq}$mixed filter media for COD, broken stone>mixed filter media>coarse sand>calcite for T-N, and calcite>mixed filter media>broken stone>coarse sand for T-P. The removal rates of pollutants in HF-VH-HF CWs at different configuration methods were higher than those in other configuration methods. The removal rates of pollutants were higher in the order of $150L\;m^{-2}day^{-1}{\fallingdotseq}300L\;m^{-2}day^{-1}$ > $600L\;m^{-2}day^{-1}$ under different greenhouse wastewater loading. Therefore, optimum configuration method was HF-VH-HF CWs, the optimum filter media was mixed filter media (coarse sand : broken stone : calcite=1 : 1 : 1), and the optimum greenhouse wastewater loading was $300L\;m^{-2}day^{-1}$ in HF-VH-HF CWs.

Estimation of Load-Settlement Curves of Embedded Piles Combining Results of End of Initial Driving and Restrike Dynamic Pile Tests (초기항타 및 재항타 동재하시험 결과를 조합한 매입말뚝의 하중-침하량 곡선 산정)

  • Seo, Mi Jeong;Park, Jong-Bae;Park, Min-Chul;Lee, Jong-Sub
    • Journal of the Korean Geotechnical Society
    • /
    • v.36 no.7
    • /
    • pp.15-28
    • /
    • 2020
  • As the skin friction of an embedded pile is produced by the cement paste injected into the borehole, the skin friction cannot be evaluated by the end of initial driving test, which is conducted before the cement paste is cured. In addition, the total resistance of an embedded pile may not be properly evaluated during the restrike test if the base resistance is not fully mobilized because of the insufficient driven energy. The objective of this study is to suggest a new load-settlement curve of embedded piles by combining the results of the end of initial driving and restrike tests. Test piles are installed at fields by using the embedded pile method, and the results of the dynamic pile tests are analyzed using CAse Pile Wave Analysis Program (CAPWAP) after the end of initial driving and restrike tests are conducted. A new load transfer curve, which combines the behaviors of the pile base at the end of initial driving and of the pile shaft at the restrike, is suggested, and a new load-settlement curve is obtained. Subsequently, the resistances of the test piles are evaluated using the combined load-settlement curve, and compared with the results from the end of initial driving and restrike tests. The results showed that the resistances, which are evaluated using the combined load-settlement curve, may overcome the underestimation of the resistance because of the insufficient driven energy. In addition, the resistance resulted from the combined load-settlement curve may be more similar to that from the static load test because the suggested load transfer curve is closer to the behavior of the embedded pile compared to the results of end of initial driving and restrike tests. Therefore, this study demonstrates that the combined load-settlement curve may be effectively used for the evaluation of the bearing capacity of embedded piles.

A Study on the Reinforcement Effect Analysis of Aging Reservoir using Grout Material recycled Power Plant Byproduct (발전부산물을 재활용한 그라우트재의 노후 저수지 보강효과 분석에 관한 연구)

  • Seo, Se-Gwan;An, Jong-Hwan;Cho, Dae-sung
    • Journal of the Korean Geosynthetics Society
    • /
    • v.20 no.2
    • /
    • pp.23-33
    • /
    • 2021
  • In Korea, many reservoirs have been built for the purpose of solving the food shortage problem and supplying agricultural water. However, the current 75.6% of the reservoirs are in serious aged as more than 50 years have passed since the year of construction. In the case of such an aging reservoir, the stability due to scour and erosion inside the reservoir is very reduced, and if concentrated rainfall due to recent abnormal weather occurs, the aging reservoir may collapse, leading to a lot of damage to property and human life. Accordingly, each agency that manages aging reservoirs uses Ordinary Portland Cement (OPC) as an injection material and applies the grouting method. However, in the case of OPC, it may deteriorate over time and water leakage may occur again. And there are environmental problems such as consumption of natural resources and generation of greenhouse gases. So, there is a need to develop new materials and methods that can replace the OPC. In this study, an laboratory test and analysis were performed on the grout material developed to induce a curing reaction similar to that of OPC by recycling power plant byproduct. In addition, test in the field such as electric resistivity survey, Standard Penetration Test (SPT), and field permeability test were performed to analyzed to reinforcement effect and determine the possibility of using instead of OPC. As a results of the test, in the case of recycled power plant byproduct, the compressive strength was 2.9 to 3.2 times and the deformation modulus was 2.3 to 3.3 times higher, indicating that it is excellent in strength and can be used instead of OPC. And it was analyzed that the N value of the reservoir was increased by 1~2, and the coefficient of permeability (k) decreased to the level of 8.9~42.5%. showing sufficient reinforcing effect in terms of order.

Optimum Management Plan for Soil Contamination Facilities (특정토양오염관리대상시설의 최적 관리방안에 관한 연구)

  • Park, Jae-Soo;Kim, Ki-Ho;Kim, Hae-Keum;Choi, Sang-Il
    • Korean Journal of Soil Science and Fertilizer
    • /
    • v.45 no.2
    • /
    • pp.293-300
    • /
    • 2012
  • This study was to investigate the unsuitable rate of the storage facilities, the changes in corrosion process over time after installation according to the status, the time to install the facilities, years elapsed after facilities installation, inspection of methods and motivation, and so on, based on the results of the inspection at the petroleum storage facilities conducted by domestic soil-relate specialized agency to derive optimal management plans which meet the status of soil contamination facilities. The results showed that the facilities more than 5 years after the initial leak test at the time of the installation need to be inspected periodically by considering costs of leak test and remediation of polluted soil. The inspection period can be decided by cost and leak test methods showing discrepancies for the results obtained from individual test whether it was direct or indirect. To compensate these matters, we suggested that the direct inspection method on regular schedule is recommended. On the other hand, the inspection can be voluntarily completed to ease burden of the results by inspection or equivalent level to this inspection method. Also, it may need improved construction supervision and performance test system to minimize the occurrence of the nature defects in installing the facilities as well as the upgrade program for the facilities during intervals of inspection period.