Development of CPAM(Construction Process Analysis Model) based on Lean Construction Principles (린 건설 원리에 기초한 건설 생산 공정 분석 모델에 관한 연구)

  • Kim Chan Hun;Kim Chang Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.4 s.8
    • /
    • pp.48-61
    • /
    • 2001
  • This study aims at improving work reliability. It proposes a way to overcome the limitations of current scheduling methods by providing a new framework, CPAM(Construction Process Analysis Model) based on the lean principles. It suggests methods which improve work reliability and production effectiveness with variability control methods. Also it suggests methods which reduce inventories of materials and equipment and WIP(Work In Process) using two techniques; Lookahead Schedule and Weekly Work Plan. The contribution of this research also includes that it assumes planning as a process of reducing uncertainty and maximizing throughput, counter-posing plan reliability to resource redundancy as alternative strategies for managing in conditions of uncertain work flow.

  • PDF

Construction Progress Management System for PPC Implementation (작업성취율 활용을 위한 공정관리체계)

  • Lim, Chul-Woo;Yu, Jung-Ho;Kim, Chang-Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.3
    • /
    • pp.57-65
    • /
    • 2007
  • Last Planner System (LPS) developed by Lean Construction Institute consists of four steps: Master Schedule, Phase Schedule, Lookahead Planning and Weekly Work Plan. This paper focuses on the process of measuring Percent of Plan Completed (PPC) at the weekly Work Plan stage. PPC means the percentage of weekly assignments completed. According to the results of the researches that deal with PPC from many other countries, we can assure the benefits or using PPC. However the concept of PPC is unfamiliar in Korea construction industry. This paper analyzes the cases in which PPC is applied in other countries and compares them with the production control system in Korean construction industry. The results of this research will provide the time management system for using PPC in Korea.

The Method of Improving the Procedure of Time Management for Measuring PPC(Percent of Plan Completed) (작업성취율 측정을 위한 공정관리절차의 개선 방안)

  • Lim, Chul-Woo;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.722-726
    • /
    • 2006
  • Last Planner System (LPS) developed by Lean Construction Institute consists of four steps: Master Schedule, Phase Schedule, Lookahead Planning and Weekly Work Plan. This paper focuses on the process of measuring Percent of Plan Completed (PPC) at the Weekly Work Plan stage. PPC means the percentage of weekly assignments completed. According to the results of the researches that deal with PPC from many other countries, we can assure the benefits of using PPC. However, the concept of PPC is unfamiliar in Korea construction industry. This paper analyzes the cases in which PPC is applied in other countries and compares them with the production control system in Korean construction industry. The results of this research will provide the time management system for using PPC in Korea.

  • PDF

생산스케쥴링에서의 시뮬레이션 응용

  • 서대석;박흥선
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 1992.10a
    • /
    • pp.4-4
    • /
    • 1992
  • 본 프로젝트는 수주 오더에 대한 납기 예측과 가공사 Delivery 체계의 전반적 향상을 목적으로 하며, 이에 따른 목표로는 로트 편성의 자동화, 월간, 주간 및 일간 단위의 생산 스케쥴 자동 작성, 원자재 소요량과 재공 및 재고 예측, 설비 부하 분석, 생산 사이클 타임 분석 및 단축이다. 상기의 목표 달성을 위한 가공사 Delivery Scheduling 시스템은 계획용 로트 편성 모델, 실행용 로트 편성 모델, 그리고 가공사 생산 스케쥴 작성을 위한 Simulation 모델로 구성된다. 계획용 로트 편성 모델은 현행의 로트 편성 기준에 따라 미가공 생산의뢰서 전체 물량을 대상으로 로트를 편성하여 이 로트를 염색기에 할당하는 모델이며, 실행용 로트 편성 모델에서는 일일 원사재고, 염색기 고장 등과 같은 실제 조업여건을 고려하여, 작업지시서 발행이 가능한 생산의뢰서 물량에 대하여만 로트 편성을 행한다. 가공사 생산 스케쥴 작성을 위한 Simulation 모델은 계획용 혹은 실행용 로트 편성 모델로부터 얻어지는 로트 편성 결과 또는 로트 번호가 부여된 최종 로트 편성 결과 (재공 로트 포함)를 입력으로 하여 이들 로트가 가공사 생산공정에서 처리되는 상세한 조업을 모의 생산하는 모델이다. 본 시스템은 영업부 및 기획부와 가공부의 사용 목적에 따라 크게 두가지로 사용될 수 있다. 영업부 및 기획부에서는 계획용 로트 편성 모델과 Simulation 모델을 사용하여 수주 오더에 대한 납기 예측 및 원사 수급 계획의 작성에 의사결정 지원을 받을 수 있으며, 가공부에서는 실행용 로트 편성 모델 및 Simulation 모델을 사용하여 상세 가공사 생산 스케쥴의 작성 및 긴급 오더의 처리 등에 관한 의사결정 지원을 받을 수 있다. 본 프로젝트를 통한 효과로는 정확한 생산 스케쥴의 자동 작성 및 스케쥴 작성시간 단축, 납기 예측 및 납기 준수율 향상, 실적관리 향상, 그리고 설비 가동율 분석, 현장관리 등을 위한 기타 유용한 정보제공 등이다.

  • PDF