• Title/Summary/Keyword: 정책적분석값

Search Result 1, Processing Time 0.015 seconds

A Study on the Construction for Transfer System between Tram and Public Traffic System - In the Place of Changwon Area - (노면전철과 대중교통수단 간의 환승체계 구축에 관한 연구 - 창원 지역을 중심으로 -)

  • Choi, Yang-Won;Park, Do-Yun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.1
    • /
    • pp.273-286
    • /
    • 2013
  • Recently, due to problems with subway and bus operations, a need has emerged for a solution such as the introduction of an Advanced Transit System. In several municipalities, systems have been introduced using light rail as AGT urban aesthetics construction. There is high inhibition and civil cases are delayed by more environmentally friendly and accessible remedies. For the purpose of this study, Changwon city would be transformed to have an environmentally friendly transportation system such as a tram with an overview. Features, advantages, and disadvantages are analyzed, and systems are established the existing public transport routes by transfer system. Changwon city's tram plan is first step in open in year 2018, and second step with the opening goal of the year 2021, and the total line length of 33.9 km, the station will be built in the 38 locations. and also in 2011 a feasibility study, evaluated a low economic as B/C to 0.88, but it evaluated the high value of the policy analysis as AHP to 0.502. However, introduction of a tram project that should precede the as following condition. The first step in Changwon city's tram plan would be as follows : The introduction of the tram system would demand traffic management along with a restructuring of the bus system, and the tram system would be selected for domestic realities. Secondly, the introduction of trams would comprehend the advanced traffic composition in accordance with the consensus of the citizenship, and a legal system should be established for the introduction of the trams.