• Title/Summary/Keyword: 정착 길이

Search Result 219, Processing Time 0.022 seconds

An Experimental Study on the Performance of Bond-Type Anchorage Systems with Various Dimensions of Steel Mold (CFRP 긴장재용 부착형 정착 장치의 강관 몰드 제원에 따른 정착 성능 실험 연구)

  • Jung, Woo-Tai;Park, Young-Hwan;Park, Jong-Sup
    • Journal of the Korea Concrete Institute
    • /
    • v.23 no.3
    • /
    • pp.257-264
    • /
    • 2011
  • This paper contains the experimental performance evaluation results of bond-type anchorage systems with the CFRP(carbon fiber reinforced polymer) tendon. The preliminary tests were performed to find the appropriate filling materials in the steel molds. A total of five materials including epoxy or cement mortar have been used as fillers in the steel molds. Results of the preliminary tests showed that specimen filled with non-shrinkage mortar showed maximum tensile strength. Based on the finding, the non-shrinkage mortar was selected as filler for anchoring CFRP tendons. Additional tests were performed as a parametric study to select proper size of steel molds such as external diameter, thickness, and length. The proper size of steel molds with non-shrinkage mortar was selected based on the test results, which gave stable tensile performance.

Pullout Characteristics of End Fixed Nails (양단정착형 쏘일네일링의 인발특성)

  • Lee, Bongjik;Kim, Josoon;Lee, Jongkyu
    • Journal of the Korean GEO-environmental Society
    • /
    • v.8 no.4
    • /
    • pp.5-11
    • /
    • 2007
  • In this study, several pullout tests were carried out under various field conditions to evaluate the pullout force of the end fixed nails. Pullout resistance force, displacement and friction force between the grouting and nail were measured in end fixed nails installed in soft rock, weathered rock and weathered soil. Furthermore, the field test were also carried out under the same condition using the conventional type nails. Based on the test results, it is concluded that the end fixed nails showed larger ultimate resistance force compared with conventional types nails, approximately two times in weathered soil and 1.6 times of weathered rock, respectively. The skin friction is also increased in end fixed type about 1.8~3.0 times. Finally, it is concluded in the base of the force transfer properties that using the end fixed nails could decrease the displacement and show a uniform resistance in entire length of nails.

  • PDF

Comparison of Pure Reinforcement Quantity to Development & Splice Reinforcement Quantity using High-strength Reinforcing Bars (고강도 철근 사용에 따른 순수 철근량에 대한 정착 및 이음 철근량 비교)

  • Cho, Seung-Ho;Na, Seung-Uk;Roh, Young-Sook
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.22 no.1
    • /
    • pp.72-80
    • /
    • 2018
  • Whilst it is common to construct high-rise buildings and long-span structures in the construction and building industry, there might be a number of problems such as excessive re-bars arrangement, deterioration of concrete quality, unnecessary quantity take-off and so forth. As these types of buildings and structures are getting more popular, it is widespread to apply high-strength materials such as high-strength concrete and re-bars to sustain durability and stability. This research aims to investigate the effectiveness of the high-strength reinforcing bars on the underground parking in a rigid-frame structure. In this study, the reinforcing bars with different yield strength were applied to corroborate the usefulness and practicability of the high-strength re-bars on the underground parking in a rigid-frame structure. The test results show that the quantity of reinforcement bars is lowered, as the yield strength of the re-bars are grown in general. However, the quantity of reinforcement bars on the development and splice has a tendency to increase slightly. Despite of the increase of the development and splice, the total quantity of reinforcing bars was reduced since the increasing ration of the pure quantity is higher than the development and splice. Base on the test results, it would be possible to achieve the reduction of reinforcing bars arrangement and lowering the amount of work to be done during a construction phase. Moreover, the reduced amount of bar arrangement will make it possible to improve workability and constructability of reinforced concrete structures. Ultimately, we will be able to attain improved quality and efficiency of construction using reinforced concrete.

Experimental Study on Effect of Confinement Details for Lap Splice of Headed Deformed Reinforcing Bars in Grade SD400 and SD500 (구속상세가 SD400 및 SD500 확대머리 이형철근의 겹침이음에 미치는 영향에 관한 실험적 연구)

  • Kim, Seung-Hun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.19 no.1
    • /
    • pp.62-71
    • /
    • 2015
  • KCI 2012 and ACI318-11 contains development length provisions for the use of headed deformed bars in tension and does not allow their tension lap splices. In ACI318-11, the confinement factor, such as transverse reinforcement factor, is not used to calculate the development length of headed bars. The purpose of this experimental study is to evaluate the effect of confinement details to the lap splice performance of headed deformed reinforcing bars in grade SD400 and SD500. The confinement details are stirrups and tie-down bars in lap zone. Test results showed that specimens with only stirrups had the brittle failure and could not increase lap strengths, and that specimens with composite confinements by stirrups and tie-down bars had the flexural strengths over than nominal flexural strengths. Stirrups with tie-down bars can have an effect on improvement in lap splice of headed bars in grade SD400 and SD500.

Behavior of 550MPa 43mm Hooked Bars Embedded in Beam-Column Joints (보-기둥 접합부에 정착된 550 MPa 43 mm 갈고리철근의 거동)

  • Bae, Min-Seo;Chun, Sung-chul;Kim, Mun-Gil
    • Journal of the Korea Concrete Institute
    • /
    • v.28 no.5
    • /
    • pp.611-620
    • /
    • 2016
  • In the construction of nuclear power plants, only 420 MPa reinforcing bars are allowed and, therefore, so many large-diameter bars are placed, which results in steel congestion. Consequently, re-bar works are difficult and the quality of RC structures may be deteriorated. To solve the steel congestion, 550 MPa bars are necessary. Among many items for verifying structural performance of reinforced concrete with 550 MPa bars, the 43 mm hooked bars are examined in this study. All specimens failed by side-face blowout and the side cover explosively spalled at maximum loads. The bar force was initially transferred to the concrete primarily by bond along a straight portion. At the one third of maximum load, the bond reached a peak capacity and began to decline, while the hook bearing component rose rapidly. At failure, most load was resisted by the hook bearing. For confined specimens with hoops, the average value of test-to-prediction ratios by KCI code is 1.45. The modification factor of confining reinforcement which was not allowed for larger than 35 mm bars can be applied to 43 mm hooked bars. For specimens with 70 MPa concrete, the average value of test-to-prediction ratios by KCI code is 1.0 which is less than the values of the other specimens. The effects of concrete compressive strength should be reduced. An equation to predict anchorage capacity of hooked bars was developed from regression analysis including the effects of compressive strength of concrete, embedment length, side cover thickness, and transverse reinforcement index.

Shear Strength of SFRC Deep Beam with High Strength Headed Reinforcing Tensile Bars (고강도 확대머리 인장철근을 가지는 SFRC 깊은 보의 전단강도)

  • Kim, Young-Rok;Lee, Chang-Yong;Kim, Seung-Hun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.23 no.5
    • /
    • pp.111-117
    • /
    • 2019
  • Shear experiments were carried out to evaluate shear performance of SFRC deep beams with end-anchorage of SD600 high strength headed reinforcing tensile bars. The experimental variables include the end-anchorage methods of tensile bars (headed bar, straight bar), the end-anchorage lengths, and the presence of shear reinforcement. Specimens with a shear span ratio of 1 showed a pattern of the shear compression failure with the slope cracks progressed after the initial bending crack occurred. Specimens with end-anchorage of headed bars (H-specimens) showed a larger shear strengths of 5.6% to 22.4% compared to straight bars (NH-specimens). For H-specimens, bearing stress reached 0.9 to 17.2% of the total stress of tensile bars up to 75% of the maximum load, and reached 22.4% to 46%. This shows that the anchorage strength due to the bearing stress of headed bars has a significant effect on shear strength. The experimental shear strength was 2.68 to 4.65 times the theoretical shear strength by the practical method, and the practical method was evaluated as the safety side.

Model Tests on the Reinforcement Effect of Unattached Strips to the Cantilever Retaining Wall (비정착 띠보강재의 역T형 옹벽 보강효과에 관한 모형실험)

  • Han, Gyeong-Je;Kim, Un-Yeong;Kim, Myeong-Mo
    • Geotechnical Engineering
    • /
    • v.14 no.2
    • /
    • pp.31-40
    • /
    • 1998
  • To verify the reinforcing effect of the strips which are inserted in the backfill, but not connected to the face wall, model tests are executed. As the reinforcing effect is expected to reduce the active thrust acting on the retaining wall, test programmes included the measurements of the thrust. As a result. it is ascertained that the active thrusts are reduced by as much as 50%. Besides, efficient arrangement and the optimum length of the strips are verified. And the the number of reinforcing strips are increased, are close to the Rankine's hypothesis.

  • PDF

Development Length of High-Strength Standard Hooked Bars (550MPa) in Nuclear Power Plant Structures (고강도철근(550MPa)의 원전구조물 적용을 위한 표준갈고리 정착설계)

  • Lee, Byung Soo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.99-100
    • /
    • 2018
  • Because of the congestion problems, the high-strength reinforcements are expected to be used in nuclear power plant structures in the near future. According to ACI 349-13, it is permitted to use the high-strength(550MPa) hooked bars in design of development length, but there is no special equation for high-strength bars. In order to reflect the anchorage capacity and behavior properties of high-strength bars with large-diameter(43 & 57mm), it is necessary to develope the new development length equation for large-size and high-strength bars.

  • PDF

Development Length of High-Strength Straight Bars (550MPa) in Nuclear Power Plant Structures (고강도철근(550MPa)의 원전구조물 적용을 위한 직선철근의 정착설계)

  • Lee, Byung Soo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.110-111
    • /
    • 2018
  • Because of the congestion problems, the high-strength reinforcements are expected to be used in nuclear power plant structures in the near future. According to ACI 349-13, it is permitted to use the high-strength(550MPa) straight bars in design of development length, but there is no special equation for high-strength bars. In order to reflect the anchorage capacity and behavior properties of high-strength straight bars with large-diameter(43 & 57mm), it is necessary to find the modified factor or develop the new development length equation for large-size and high-strength bars.

  • PDF

Experimental Study on the Precast Concrete Joint using Re-bar Debonding and Cutting Technique (철근 비부착 및 절단 기법을 사용한 PC 접합부의 실험적 연구)

  • Yi, Waon-Ho;Moon, Jung-Ho;Lee, Yong-Jae;Lee, Han-Jun
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.2 no.4 s.7
    • /
    • pp.131-141
    • /
    • 2002
  • Precast concrete (PC) panels are often used as retaining walls to support soil pressure. In such a case, the panels should be connected at the location where PC panels meet with a buttress. However, it is not easy to provide enough development length for the reinforcing steels due to the limited width of the buttress. If it happens, the width of buttress should be increased as large enough although it is not desirable. The critical section required for providing the development length is always located where the flexural moment is maximum. Thus it is the place the buttress width ends. Also it is the place that the reinforcing steels stressed to maximum. However, it is possible to make differentiate between the maximum moment location and the most stressed location of reinforcing steels. It means that the most stressed location of reinforcing steels, the critical section, can be moved to the other place where the moment is not maximum. New critical location will have less moment than that of buttress width ends. In consequence, the development length would be longer than that of the typical way of construction. Debonding or cutting technique make it possible to reduce the moment strength of a section. Therefore reinforcing steels are debonded or cut to have a desired flexural strength at a desired place. In this study, five test specimens in full scale were erected to examine the effects of critical section movement in PC panel joints. Test parameters were the length variations of debonded and cut reinforcing steels. The test results showed that the debonding or cutting technique could be used to lengthen the development length in the joint of PC panels.