• Title/Summary/Keyword: 정류벽

Search Result 27, Processing Time 0.028 seconds

Low-Power Wireless Transmission at 2.45 GHz Band (2.45 GHz 대역 소전력 무선 전송)

  • Choi, Ki-Ju;Hwang, Hee-Yong
    • The Journal of Korean Institute of Electromagnetic Engineering and Science
    • /
    • v.20 no.8
    • /
    • pp.777-783
    • /
    • 2009
  • In this paper, we implemented a wireless power transmission system at 2.45 GHz. The transmission power is limited within 20 dBm according to the ISM frequency regulations. We used two zero-bias Schottky diode and optimized the RF-DC converter for working a clock at 80 cm distance using a receiver with a single antenna and an Rf-DC converter to reduce parts and cost compared to previously reported literatures.

Application of a CFD Model for the Design of a Settling Basin Inlet Structure (침전지 유입부 설계를 위한 CFD 모형의 적용)

  • Kim, Nam Il;Kim, Dae Geun;Yu, Chang Hwan;Kim, Tae Young
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.19 no.3
    • /
    • pp.318-322
    • /
    • 2005
  • We applied a commercially available computational fluid dynamics model, FLOW-3D, to design a settling basin inlet structure for the intended O sewage plant. In addition, we analyzed the extent to which the inlet sewage water was distributed as a result, firstly, of the location and width of a submerged baffle wall and, secondly, of the opening ratio of a baffle wall with opening holes. The application results show that the flow is unstable due to the generation of eddies in both sides of the submerged baffle wall when the submerged baffle wall is located close to the inlet. The eddies and subsequent instability also occur when the submerged baffle wall is located close to the baffle wall with opening holes. Moreover, the discharge that passes through the midsection of the settling basin increases as the width of the submerged baffle wall increases. At the O sewage plant, when the submerged baffle wall with a width of 2.4 m was located 2 m from the inlet structure and the opening ratio of the baffle wall was 7 percent, the most satisfactory distribution of the inlet sewage water occurred at the entrance of the settling basin.

Sludge Thickening using Electro-Flotation in Water Treatment Plant (전해부상에 의한 상수 슬러지 농축효율)

  • Lee, Jun;Han, Mooyoung;Dockko, Seok;Park, Yonghyo;Kim, Tschungil;Kim, Mikyung
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.19 no.2
    • /
    • pp.155-160
    • /
    • 2005
  • Gravity thickening process has been widely used in WTP sludge thickening at domestic water treatment plant. The operation method of the process is very simple, however, the process requires long detention time about 24~48 hours for sludge thickening, uses polymer, and low total solids of thickened sludge to increase sludge thickening efficiency. To solve there problems, we studied about flotation process, especially, electro-flotation (EF) process in WTP sludge thickening. Electro-flotation process is simpler than dissolved-air-flotation(DAF) process because EF needs only electrode and current to generate micro-bubbles and the operation is easy. This study was performed at two batch columns to compare interface height, total solids, effluent turbidity between an electro-flotation thickening and a gravity thickening. According to the result, an electro-flotation thickening was that interface height was decreasing, total solids had high concentration, and effluent turbidity was low in comparison with a gravity thickening. Also, it will make the high efficiency of following process, such as a dehydrating process and digestive process. because of high total solids and low moisture content in the sludge.

A Study on the Structural Behavior of an Underground Radwaste Repository within a Granitic Rock Mass with a Fault Passing through the Cavern Roof (화장암반내 단층지역에 위치한 지하 방사성폐기물 처분장 구조거동연구)

  • 김진웅;강철형;배대석
    • Tunnel and Underground Space
    • /
    • v.11 no.3
    • /
    • pp.257-269
    • /
    • 2001
  • Numerical simulation is performed to understand the structural behavior of an underground radwaste repository, assumed to be located at the depth of 500 m, in a granitic rock mats, in which a fault intersects the roof of the repository cavern. Two dimensional universal distinct element code, UDEC is used in the analysis. The numerical model includes a granitic rock mass, a canister with PWR spent fuels surrounded by the compacted bentonite inside the deposition hole, and the mixed bentonite backfilled in the rest of the space within the repository cavern. The structural behavior of three different cases, each case with a fault of an angle of $33^{\circ},\;45^{\circ},\;and\;58^{\circ}$ passing through the cavern roof-wall intersection, has been compared. And then fro the case with the $45^{\circ}$ fault, the hydro-mechanical, thermo-mechanical, and thermo-hydro-mechanical interaction behavior have been studied. The effect of the time-dependent decaying heat, from the radioactive materials in PWR spent fuels, on the repository and its surroundings has been studied. The groundwater table is assumed to be located 10m below the ground surface, and a steady state flow algorithm is used.

  • PDF

A Study of the Management of Groundwater Reservoir by Numerical Three Dimensional Flow Model (3차원 흐름모델을 이용한 지하저수지의 관리에 대한 연구)

  • 신방웅;김희성
    • The Journal of Engineering Geology
    • /
    • v.5 no.3
    • /
    • pp.289-300
    • /
    • 1995
  • At the initial stage of the underground reservoir design one should thoroughly consider surface and subsurface hydrology, hydrogeologic characteristics of aquifer system, and the function of cut - off wall because it is linked to the effective management. In this study, three dimensional finite difference model was applied to analyse the function of Ian underground reservoir at Kyungbuk Province. The steady and unsteady state conditions after construction of the underground dam were simulated through the model, and from these results the groundwater budget and the safe yield were determined. The model simulation indicates the infiltration of irrigation water to be one of the major factors of seasonal fluctuation of groundwater level. The recharge rates of irrigation water were estimated as 4.3mm/d during May and June, and 1.7mm/d during July and Agust. Groundwater recharge from the watershed area estimated to about $0.04m^3/s$, almost consistent through the year. In 1984, groundwater discharge through the transverse section of the dam was $0.002m^3/s$ and the optimum yield for two momths(July and Aguest)was $254000m^3$, however, the discharge became $0.013m^3/s$ in1993, implying the failure of cut -off function. without appropaiate of the cut - off wall, optiumum yield during the irrigaton period would be $93, 000m^3$.

  • PDF

Effects of Various Baffles on Hydraulic Characteristics in the Sedimentation Basin with Inclined Plate Settler (경사판 침전지의 수리학적 특성에 대한 구조물의 영향)

  • Yu, Myong-Jin;Kim, Hyun-Chul;Myung, Gyu-Nam;Ryu, Seong-Ho;Cho, Hang-Moon
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.18 no.4
    • /
    • pp.427-436
    • /
    • 2004
  • Sedimentation is one of the most common and important units in conventional water treatment plants. Structure such as various baffle walls and inclined plate settler may be obstacles to the horizontal flow when it is poorly designed. Therefore, the effects of these structures on characteristics of hydraulic flow must be evaluated to improve the settling efficiency of the floc. The hydraulic characteristic of the four sedimentations at the three real WTPs (water treatment plants), which have different structural properties respectively inside the settling basin, were investigated by tracer (fluoride) test. The inclined plate settler installed inside settling basin caused a undesirable impact on horizontal flow and produced dead zone. Intermediate baffle and solid baffle wall under the inclined plate settler at GE plant help to minimize the formation of density currents and flow short circuiting. However, installing perforated baffle under the inclined plate settler at other plants could not induce even distribution of flow. NaF used as a tracer was recovered more than 90% at investigated all basin. Morill index ($t_{90}/t_{10}$), Modal index ($t_p/T-HRT$) and short-circuiting index ($[M-HRT-t_p/M-HRT$) were determined from tracer test results performed at three WTPs. Those indices ranged 2.99~3.45, 0.44~0.72 and 0.23~0.47, respectively.

Study on Applying of Unsteady Analysis in ToSS(Total Sewer Operation and Management System) for Optimal Management of Sewer System (하수관망 최적관리를 위한 통합하수관거 시스템의 부정류 해석적용에 대한 연구)

  • Choi, Gye-Woon;Lee, Ho-Sun;Jho, Hyung-Guen
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2005.05b
    • /
    • pp.1148-1153
    • /
    • 2005
  • 하수관거는 국민의 정맥이라고 할 수 있을 정도로 도시의 환경관리와 치수, 쾌적한 환경조성에 있어서 매우 중요한 시설이며 그 규모가 광범위하고 복잡한 네트워크로 구성되어 있다. 이러한 하수관망을 통해 이송되는 물은 지저분하고 냄새가 심하기 때문에 지하에 관의 형태로 대부분 시공되어 왔으며, 상수관망처럼 압력관이 아니라 대부분 중력에 의한 이송방식을 채택하고 있어 문제 발생 시 원인파악과 대처를 힘들게 하는 요인을 가지고 있다. 특히 하수관거의 관리 소홀은 곧바로 토양오염과 인근 환경오염으로 직결되며 장기적으로는 상수를 오염시키는 요인으로 작용하므로 체계적인 방법과 장기적인 안목을 가지고 명확한 분석을 시행할 수 있는 시스템을 가지고 최적으로 유지관리 되어야 한다. 최근 들어 이러한 하수도 시설을 효율적으로 관리 및 개선하기 위해 대도시를 중심으로 근거 조사와 정비 사업이 활발히 시행되고 있다. 그러나, 사업효과를 검증하거나 관로의 유지관리를 위하여 국내 실정에 맞지 않는 외국하수관망 흐름 해석 프로그램을 그대로 사용하고 있고 정확한 해석이 이루어지지 않고 있어 효율적인 유지관리가 어렵다. 이와 같은 문제점을 해결하기 위하여 하수관망해석이나 하수관망 정비시 필요한 불명수산정이 가능하고 국내실정에 맞는 프로그램 개발이 시급한 실정이며, 아울러 프로그램을 효율적 운영하고 관리하는 제어관리 기술을 개발, 진행하고 있다. 본 논문에서는 개발된 프로그램의 부정류 해석 기능을 활용하여 대상구역의 해석을 실시하여 기존분석방법의 I/I결과와 비교하였으며 최적관리를 위한 방안을 제시하였다.준편차가 증가하고 있음을 알 수 있다. 본 연구에서는 상용 CFD모형인 FLOW-3D를 계획 중인 하수처리장의 침전지 유입부 설계에 적용하였으며 저류벽의 위치와 폭, 유공정류벽의 유공율에 따른 유입하수의 분배효과를 분석하였다. 실험을 수행하여 보다 정밀한 공식으로 개선할 수 있었다.$10,924m^3/s$ 및 $10,075m^3/s$로서 실험 I의 $2,757m^3/s$에 비해 통수능이 많이 개선되었음을 알 수 있다.함을 알 수 있다. 상수관로 설계 기준에서는 관로내 수압을 $1.5\~4.0kg/cm^2$으로 나타내고 있는데 $6kg/cm^2$보다 과수압을 나타내는 경우가 $100\%$로 밸브를 개방하였을 때보다 $60\%,\;80\%$ 개방하였을 때가 더 빈번히 발생하고 있으므로 대상지역의 밸브 개폐는 $100\%$ 개방하는 것이 선계기준에 적합한 것으로 나타났다. 밸브 개폐에 따른 수압 변화를 모의한 결과 밸브 개폐도를 적절히 유지하여 필요수량의 확보 및 누수방지대책에 활용할 수 있을 것으로 판단된다.8R(mm)(r^2=0.84)$로 지수적으로 증가하는 경향을 나타내었다. 유거수량은 토성별로 양토를 1.0으로 기준할 때 사양토가 0.86으로 가장 작았고, 식양토 1.09, 식토 1.15로 평가되어 침투수에 비해 토성별 차이가 크게 나타났다. 이는 토성이 세립질일 수록 유거수의 저항이 작기 때문으로 생각된다. 경사에 따라서는

  • PDF