Proceedings of the Korean Institute of Building Construction Conference
/
2005.05a
/
pp.133-136
/
2005
This study provides the method how to improve the productivity of a project using CM's constitutive methods. Construction industry in Korea was protected by the government and they have been grown with only their construction technology until today. It results Korean Construction is behind the advanced countries in terms of Engineering fields and construction management skills. This study compares the difference between the construction system of Korea and Europe and Asia. And then, it proposes the method how to compete with the other countries. which introduce the CM technique into the construction project in the beginning stage. Hopefully, this study is recognised as the basic strategy to improve the capability of Korean construction management.
Journal of the Korea Institute of Building Construction
/
v.16
no.2
/
pp.141-149
/
2016
Recently, in an attempt to overcome the defects of quiescent power shutdown system, smart quiescent power control system has been developed. However, due to its higher investment costs, feasibility evaluation must be conducted. While LCCA (Life Cycle Cost Analysis) model is useful to estimate net savings of alternatives that differ with respect to initial costs and operating costs, the environmental burdens are not considered. On the contrary, LCA (Life Cycle Assessment) model is suitable to assess environmental impacts associated with the stages of a product's life but it does not consider costs. In this study, a comprehensive analysis on the economic and environmental impacts of smart quiescent power control system is conducted by using LCCA and LCA model. In addition, sensitivity analysis is carried out to quantify accuracy of estimates.
Park, Kyoung-Won;Jung, Kwan-Su;Lee, Gwang-Man;Hwang, Eui-Ho
Proceedings of the Korea Water Resources Association Conference
/
2012.05a
/
pp.669-673
/
2012
제방안전성 모니터링은 제방파괴로부터 국민의 생명과 재산을 보호하는데 필요한 정보를 얻을 수 있는 하나의 방법이 될 수 있다. 근래에 미국은 2005년 허리케인 카타리나에 의해 2,000여명의 인명손실을 경험하였고 2011년 3월 일본은 도후쿠지역의 초강력 지진에 의한 쓰나미로 인해 수만명의 인명과 후쿠시마 원자력 발전소의 침수로 지금까지 방사능 누출 차단작업을 벌이고 있다. 국내에서는 4대강 복원사업으로 주요 국가 하천 구간에서 홍수 및 체제 불안정에 의한 제방붕괴사고위험이 현격하게 줄어들었으나 제방의 안전성은 더욱 강조되고 있다. 즉 신설된 보 주변, 배수통문 신설구간 그리고 제방누수 예상지점 등에서는 아직 안전한 상태라고 확신할 수 없으며 지속적인 모니터링이 요구된다. 따라서 본 연구에서는 광섬유를 이용하여 개발한 간극수압 및 온도 센서 등을 위험예상지점에 설치하고 정보시스템을 통하여 어떻게 관리 할 것인가에 대한 사전 검토를 계획하였다. 이를 위하여 제방에 센서를 설치하기 전에 주요 검토사항에 대하여 연구분석하였다. 주요 검토사항에는 설치하고자 하는 지점의 제방거동 메커니즘 예측, 왜 계측시스템을 설치하는지에 대한 목적에 대한 평가, 설치 지점의 제방의 토질공학적 문제점 파악, 모니터링 대상 매개변수 혹은 항목 선정, 조사대상 항목의 변화정도를 예측하여 거동 범위 확정, 적정 계측기기 설치 지점을 선청, 계측기기 선정, 자동화 혹은 실시간 정보시스템에 필요한 사항 결정, 관측에 영향을 미치는 인자들의 기록 계획, 정보의 타당성 확보를 위한 필요사항 정립, 비용의 결정, 장기 예측 계획, 정기 검 보정 및 관리 계획, 자료수집 및 관리계획, 자원의 공조 및 생애주기 비용 등을 포함하였다.
Kim, Young-Jin;Sohn, Kyung-Jung;Park, Hyo-Sang;Jin, Kyu-Nam
Proceedings of the Korea Water Resources Association Conference
/
2009.05a
/
pp.656-661
/
2009
상수도시설은 준공후 관련지자체에 이관 관리하는 시설로서 사용관종이 현재 다양하게 생산 보급되고 있어 관종 선정시 다각적인 측면에서 검토하여 채택하여야 한다. 최근 한국토지공사에서 사용하고 있는 상수도 관종은 대부분 택지개발계획 등 인허가 당시부터 관리주체인 지방자치단체 등과의 협의과정을 거쳐 선정되는 경우가 많아 자재선택에 한계성이 있다. 이를 극복하기 위해서는 자재 성능에 대한 공사내 명확한 기준이 제시되어야 한다. 상수관종을 선정하기 위한 가장 중요한 요소는 경제성으로 판단되는데, 관종의 경제성은 시공비와 자재비를 포함한 단순 공사비에만 국한되는 것이 아니라 유지관리비용을 포함한 생애주기비용(LCC: Life Cycle Cost)을 평가하여야 한다. 따라서 본 연구에서는 한국토지공사에서 택지지구 조성을 위해 사용한 배수관.급수관용 상수관종에 대한 경제성 평가기준을 제시하였고, 평가기준에 따라 각각의 택지지구 조성사례별로 종합적인 경제성 평가를 수행하였다. 보다 풍부한 자료를 바탕으로 객관적인 경제성평가 기준을 수립하기 위한 전(前)과정으로 이해되길 바라며, 설계시부터 객관적인 평가기준을 통해 합리적인 상수관을 선정하여 지금까지의 상수관종 자재선택의 한계를 최소한으로 축소하고자 하는데 가장 큰 목표를 가지고 있다.
The Magazine of the Society of Air-Conditioning and Refrigerating Engineers of Korea
/
v.30
no.8
/
pp.54-59
/
2001
바낙 공기 급기(UFAD, underfloor air distribution)는 사무실과 상업 건물의 공조를 위하여 바닥 하부 공간을 사용하는 혁신적인 기술이다. 북미에서는 UFAD가 기존 천장 공기 급기 방식에 비하여 많은 장점을 지니므로 그 수요가 날로 증가하고 있다. 잘 설계된 UFAD 시스템은 다음과 같은 장점을 지닌다. - 건물의 용도 변경에 따픈 유연성이 우수하므로 건물의 생애 주기 비용을 감소시킨다. - 개별 쾌적성 제어가 가능하므로 온열 쾌적성, 거주자의 만족도 그리고 생산성을 향상시킨다. - 거주자주변에 직접 선선한 공기를 공급하므로 환기 효율, 실내 공기질 그리고 건강 상태를 향상시킨다. - 이코노마이저 운전, 온도 성층화 그리고 낮은 정합 운전에 의하여 에너지 비용을 감소시킨다. - 설비 공간이 축소되고 표준 철골 구조에서는 콘크리트 구조체 변경이 가능하므로 새 건축 공법에서는 충고를 감소시킬 수 있다. 1995년까지만 해도 UFAD는 파격적인 설계 기법이라고 여겨졌지만, 이제 설계자와 건축업자들은 2004년까지 신축되는 사무용 건축품의 35%는 바닥을 높인 기법이 적용되며 이 중 반 정도가 UFAD를 채택할 것이라고 예측하고 있다. 2000년 2억불이라고 추정되던 바닥을 높이는 건축의 시장 규모가 2004년에는 최소 10억불이 되리라고 예측된다. UFAD는 기본 연구에 의한 정립된 표준화된 설계 기법과 지침이 아직 마련되지 않았음에도 불구하고 현재 설계, 시공되고 있다. 이라한 경향은 펄수적인 연구가 수행되어 관련 업계가 지식과 경험을 충분히 쌓기 전까지는 계속될 전망이다. 본고는 시스템 설계와 운영의 주요한 특징, 기존 방식과 비교하여 지니고 있는 잠재적인 장점, 한계와 기술 개발의 필요성, UFAD 기술 개발을 위하여 계속적으로 요구되는 연구 분야 등을 서술함으로써 현재 UFAD 기술에 대한 평가를 한다.
Park, Jaeil;Kim, Dongjin;Kim, Gyeonghyun;Lim, Jongkwon;Lee, Minjaee
Korean Journal of Construction Engineering and Management
/
v.17
no.3
/
pp.125-133
/
2016
The Project Risk Management is intended to result in the effective management by identifying in advance and mitigating all significant risks including project risks and opportunities during the entire project life cycle - from project inception to completion of construction. It is impossible to predict an exact budget and construction duration before finishing a project. So, Washington Department of Transportation mandates that workshop-based risk management is conducted for projects over specific cost. However, the domestic construction sites have depended on numerical risk analysis without any workshop and efficient risk management have not made. Therefore, in this study, we propose the effective risk management using the RBES program which is very useful for workshop-based risk management and pre & post mitigation, by workshop-based risk management techniques. This proposed risk management approach is applied to a domestic 'A' river recovery project. It is concluded that we may expect the effect to mitigate the total cost overrun problem and the construction duration delay effect in the project by identifying significant risks and by preparing effective risk mitigation strategies.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2008.11a
/
pp.176-183
/
2008
Recently, several large-scale Mega-Projects are being conducted. For these urban revitalization projects which requires many complex functions, the existing project management system based on single project level is limited in application. Therefore, our main objectives of this research are two 1) Develop a brand-new program management system(Prototype Ver 1.0) for mega-projects where various facilities are combined both horizontally and vertically. 2) Develop management strategies(Prototype Ver 1.0) based on the program level that enable the comprehensive management of a multiple various projects. The subtitles of this Research are i-PMIS(Program Management Information System) Development, Standardization & Optimization of Construction Life-Cycle Process, Comprehensive Project Cost & Process Management Technology, Effective and Optimized Integrated Performance Management Technology, and, we suggest to optimize the whole life cycle process, predict and respond to various risks, predict and control the process, the cost and the schedule, achieve maximum return on investment to the participating parties, and provide a brand-new Program-MIS including the visual-based web-portal platform to respond the changing business environments and decision making.
In domestic construction industry, there is lack of the communication between planning, design, construction and maintenance. This problem makes the omission of information and the loss of cost. Therefore, the introduction of BIM can be a solution about that. BIM manages all information generated during all life-cycle of a structure and consequently maximizes the efficiency of utilizing information. This is done through 3D information model associated with a three-dimensional(3D) parametric CAD. This study proposes the design process of steel box bridge for structural design work of bridge construction project based on BIM. This process has 3D modeling progress done by using the information decided in design phase. When the subject for the proposed process is superstructure of steel box bridge in construction, the structural calculation sheet can be derived with the structural design process based on BIM.
Journal of the Computational Structural Engineering Institute of Korea
/
v.24
no.4
/
pp.421-428
/
2011
The communication of each others is lack between planing, design, construction and maintenance in domestic construction industry. This problem makes the omission of information and the loss of cost. So, the introduction of BIM can be the solution about that. BIM manages all information generated during all life-cycle of a structure and consequently maximizes the efficiency of utilizing information. This is done through 3D information model associated with a three-dimensional(3D) parametric CAD. This study proposes the seismic analysis process of steel box bridge for structural design of bridge construction project based on BIM. The additional process is needed for the purpose that structural data is inherent in the property information of 3D information model. This process has 3D modeling progress done by using the information decided in design phase. The design document of seismic analysis can be derived with the proposed process to steel box bridge.
Journal of the Korea Academia-Industrial cooperation Society
/
v.16
no.6
/
pp.4176-4184
/
2015
Cost Estimate for alternative in design phase of construction become criterion for profitability and feasibility analysis of projects. Initial design phase performed schematic estimate based on similar data in the past. The quantity take-off according to estimators experience and calculation method are occurred different or missing. IT (Information Technology) technology evolution has been promoting BIM technology in construction. It is changing the paradigm of planning, design, construction and maintenance phase throughout the construction project. A number of studies have been attempted to apply BIM technology in the construction. In this paper, we propose schematic estimation framework linking standard format IFC (Industry Foundation Classes) and estimate related knowledge. As a result, it performs a cost prediction for decision-making in the design phase, and expected to overcome the limitations of previous studies. In addition, it is possible actively coping with changes.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.