The Method Improving the Productivity of a Project through Construction Management Techniques (CM의 요소기술을 이용한 프로젝트의 생산능력향상)

  • Yoon Tae-Kwon;Chung Jai-Young
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.05a
    • /
    • pp.133-136
    • /
    • 2005
  • This study provides the method how to improve the productivity of a project using CM's constitutive methods. Construction industry in Korea was protected by the government and they have been grown with only their construction technology until today. It results Korean Construction is behind the advanced countries in terms of Engineering fields and construction management skills. This study compares the difference between the construction system of Korea and Europe and Asia. And then, it proposes the method how to compete with the other countries. which introduce the CM technique into the construction project in the beginning stage. Hopefully, this study is recognised as the basic strategy to improve the capability of Korean construction management.

  • PDF

A Study of LCCA and LCA to Evaluate Feasibility for Introducing Smart Quiescent Power Control System into Office Building (LCCA 및 LCA 분석을 이용한 오피스 빌딩에 지능형 대기전력 제어시스템 도입의 타당성 분석에 관한 연구)

  • Quan, Junlong;Lee, Seok-Jung;Choi, Hye-Mi;Kim, Kyung-Hwan;Kim, Ju-Hyung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.2
    • /
    • pp.141-149
    • /
    • 2016
  • Recently, in an attempt to overcome the defects of quiescent power shutdown system, smart quiescent power control system has been developed. However, due to its higher investment costs, feasibility evaluation must be conducted. While LCCA (Life Cycle Cost Analysis) model is useful to estimate net savings of alternatives that differ with respect to initial costs and operating costs, the environmental burdens are not considered. On the contrary, LCA (Life Cycle Assessment) model is suitable to assess environmental impacts associated with the stages of a product's life but it does not consider costs. In this study, a comprehensive analysis on the economic and environmental impacts of smart quiescent power control system is conducted by using LCCA and LCA model. In addition, sensitivity analysis is carried out to quantify accuracy of estimates.

A Study on Previous Plan for Levee Leakage Monitoring Sensors (제방누수감지센서 설치를 위한 사전계획 연구)

  • Park, Kyoung-Won;Jung, Kwan-Su;Lee, Gwang-Man;Hwang, Eui-Ho
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2012.05a
    • /
    • pp.669-673
    • /
    • 2012
  • 제방안전성 모니터링은 제방파괴로부터 국민의 생명과 재산을 보호하는데 필요한 정보를 얻을 수 있는 하나의 방법이 될 수 있다. 근래에 미국은 2005년 허리케인 카타리나에 의해 2,000여명의 인명손실을 경험하였고 2011년 3월 일본은 도후쿠지역의 초강력 지진에 의한 쓰나미로 인해 수만명의 인명과 후쿠시마 원자력 발전소의 침수로 지금까지 방사능 누출 차단작업을 벌이고 있다. 국내에서는 4대강 복원사업으로 주요 국가 하천 구간에서 홍수 및 체제 불안정에 의한 제방붕괴사고위험이 현격하게 줄어들었으나 제방의 안전성은 더욱 강조되고 있다. 즉 신설된 보 주변, 배수통문 신설구간 그리고 제방누수 예상지점 등에서는 아직 안전한 상태라고 확신할 수 없으며 지속적인 모니터링이 요구된다. 따라서 본 연구에서는 광섬유를 이용하여 개발한 간극수압 및 온도 센서 등을 위험예상지점에 설치하고 정보시스템을 통하여 어떻게 관리 할 것인가에 대한 사전 검토를 계획하였다. 이를 위하여 제방에 센서를 설치하기 전에 주요 검토사항에 대하여 연구분석하였다. 주요 검토사항에는 설치하고자 하는 지점의 제방거동 메커니즘 예측, 왜 계측시스템을 설치하는지에 대한 목적에 대한 평가, 설치 지점의 제방의 토질공학적 문제점 파악, 모니터링 대상 매개변수 혹은 항목 선정, 조사대상 항목의 변화정도를 예측하여 거동 범위 확정, 적정 계측기기 설치 지점을 선청, 계측기기 선정, 자동화 혹은 실시간 정보시스템에 필요한 사항 결정, 관측에 영향을 미치는 인자들의 기록 계획, 정보의 타당성 확보를 위한 필요사항 정립, 비용의 결정, 장기 예측 계획, 정기 검 보정 및 관리 계획, 자료수집 및 관리계획, 자원의 공조 및 생애주기 비용 등을 포함하였다.

  • PDF

A study of economic standards on selected water supply pipes each house landing district (택지지구별 선정 상수관에 대한 경제성 기준 검토)

  • Kim, Young-Jin;Sohn, Kyung-Jung;Park, Hyo-Sang;Jin, Kyu-Nam
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2009.05a
    • /
    • pp.656-661
    • /
    • 2009
  • 상수도시설은 준공후 관련지자체에 이관 관리하는 시설로서 사용관종이 현재 다양하게 생산 보급되고 있어 관종 선정시 다각적인 측면에서 검토하여 채택하여야 한다. 최근 한국토지공사에서 사용하고 있는 상수도 관종은 대부분 택지개발계획 등 인허가 당시부터 관리주체인 지방자치단체 등과의 협의과정을 거쳐 선정되는 경우가 많아 자재선택에 한계성이 있다. 이를 극복하기 위해서는 자재 성능에 대한 공사내 명확한 기준이 제시되어야 한다. 상수관종을 선정하기 위한 가장 중요한 요소는 경제성으로 판단되는데, 관종의 경제성은 시공비와 자재비를 포함한 단순 공사비에만 국한되는 것이 아니라 유지관리비용을 포함한 생애주기비용(LCC: Life Cycle Cost)을 평가하여야 한다. 따라서 본 연구에서는 한국토지공사에서 택지지구 조성을 위해 사용한 배수관.급수관용 상수관종에 대한 경제성 평가기준을 제시하였고, 평가기준에 따라 각각의 택지지구 조성사례별로 종합적인 경제성 평가를 수행하였다. 보다 풍부한 자료를 바탕으로 객관적인 경제성평가 기준을 수립하기 위한 전(前)과정으로 이해되길 바라며, 설계시부터 객관적인 평가기준을 통해 합리적인 상수관을 선정하여 지금까지의 상수관종 자재선택의 한계를 최소한으로 축소하고자 하는데 가장 큰 목표를 가지고 있다.

  • PDF

바닥 급기 공조의 전망

  • 김영일
    • The Magazine of the Society of Air-Conditioning and Refrigerating Engineers of Korea
    • /
    • v.30 no.8
    • /
    • pp.54-59
    • /
    • 2001
  • 바낙 공기 급기(UFAD, underfloor air distribution)는 사무실과 상업 건물의 공조를 위하여 바닥 하부 공간을 사용하는 혁신적인 기술이다. 북미에서는 UFAD가 기존 천장 공기 급기 방식에 비하여 많은 장점을 지니므로 그 수요가 날로 증가하고 있다. 잘 설계된 UFAD 시스템은 다음과 같은 장점을 지닌다. - 건물의 용도 변경에 따픈 유연성이 우수하므로 건물의 생애 주기 비용을 감소시킨다. - 개별 쾌적성 제어가 가능하므로 온열 쾌적성, 거주자의 만족도 그리고 생산성을 향상시킨다. - 거주자주변에 직접 선선한 공기를 공급하므로 환기 효율, 실내 공기질 그리고 건강 상태를 향상시킨다. - 이코노마이저 운전, 온도 성층화 그리고 낮은 정합 운전에 의하여 에너지 비용을 감소시킨다. - 설비 공간이 축소되고 표준 철골 구조에서는 콘크리트 구조체 변경이 가능하므로 새 건축 공법에서는 충고를 감소시킬 수 있다. 1995년까지만 해도 UFAD는 파격적인 설계 기법이라고 여겨졌지만, 이제 설계자와 건축업자들은 2004년까지 신축되는 사무용 건축품의 35%는 바닥을 높인 기법이 적용되며 이 중 반 정도가 UFAD를 채택할 것이라고 예측하고 있다. 2000년 2억불이라고 추정되던 바닥을 높이는 건축의 시장 규모가 2004년에는 최소 10억불이 되리라고 예측된다. UFAD는 기본 연구에 의한 정립된 표준화된 설계 기법과 지침이 아직 마련되지 않았음에도 불구하고 현재 설계, 시공되고 있다. 이라한 경향은 펄수적인 연구가 수행되어 관련 업계가 지식과 경험을 충분히 쌓기 전까지는 계속될 전망이다. 본고는 시스템 설계와 운영의 주요한 특징, 기존 방식과 비교하여 지니고 있는 잠재적인 장점, 한계와 기술 개발의 필요성, UFAD 기술 개발을 위하여 계속적으로 요구되는 연구 분야 등을 서술함으로써 현재 UFAD 기술에 대한 평가를 한다.

  • PDF

The Case Study on Performance Measurement Weighting for Efficient Value Engineering Study of Sewage Treatment Facliity (건설사업의 효율적인 리스크관리를 위한 RBES 분석기법과 적용에 대한 연구)

  • Park, Jaeil;Kim, Dongjin;Kim, Gyeonghyun;Lim, Jongkwon;Lee, Minjaee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.3
    • /
    • pp.125-133
    • /
    • 2016
  • The Project Risk Management is intended to result in the effective management by identifying in advance and mitigating all significant risks including project risks and opportunities during the entire project life cycle - from project inception to completion of construction. It is impossible to predict an exact budget and construction duration before finishing a project. So, Washington Department of Transportation mandates that workshop-based risk management is conducted for projects over specific cost. However, the domestic construction sites have depended on numerical risk analysis without any workshop and efficient risk management have not made. Therefore, in this study, we propose the effective risk management using the RBES program which is very useful for workshop-based risk management and pre & post mitigation, by workshop-based risk management techniques. This proposed risk management approach is applied to a domestic 'A' river recovery project. It is concluded that we may expect the effect to mitigate the total cost overrun problem and the construction duration delay effect in the project by identifying significant risks and by preparing effective risk mitigation strategies.

Development of the Program Management System for Mega Project in Urban Regeneration (도시재생사업의 메가프로젝트 건설관리시스템 개발)

  • Hyun, Chang-Teak;Kim, Ju-Hyung;Park, Il-Soo;Yu, Jung-Ho;Son, Bo-Sik;Hong, Tae-Hoon;Seo, Yong-Chil;Lee, Sang-Bum;Kim, Hyoung-Kwan;Kim, Chang-Wan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.176-183
    • /
    • 2008
  • Recently, several large-scale Mega-Projects are being conducted. For these urban revitalization projects which requires many complex functions, the existing project management system based on single project level is limited in application. Therefore, our main objectives of this research are two 1) Develop a brand-new program management system(Prototype Ver 1.0) for mega-projects where various facilities are combined both horizontally and vertically. 2) Develop management strategies(Prototype Ver 1.0) based on the program level that enable the comprehensive management of a multiple various projects. The subtitles of this Research are i-PMIS(Program Management Information System) Development, Standardization & Optimization of Construction Life-Cycle Process, Comprehensive Project Cost & Process Management Technology, Effective and Optimized Integrated Performance Management Technology, and, we suggest to optimize the whole life cycle process, predict and respond to various risks, predict and control the process, the cost and the schedule, achieve maximum return on investment to the participating parties, and provide a brand-new Program-MIS including the visual-based web-portal platform to respond the changing business environments and decision making.

  • PDF

BIM based Design of Steel Box Girder (STEEL BOX 교량 상부구조의 BIM기반 설계)

  • Lee, Jin-Kyoung;Lee, Heon-Min;You, Jae-Myoung;Shin, Hyun-Mock
    • Journal of KIBIM
    • /
    • v.1 no.2
    • /
    • pp.6-11
    • /
    • 2011
  • In domestic construction industry, there is lack of the communication between planning, design, construction and maintenance. This problem makes the omission of information and the loss of cost. Therefore, the introduction of BIM can be a solution about that. BIM manages all information generated during all life-cycle of a structure and consequently maximizes the efficiency of utilizing information. This is done through 3D information model associated with a three-dimensional(3D) parametric CAD. This study proposes the design process of steel box bridge for structural design work of bridge construction project based on BIM. This process has 3D modeling progress done by using the information decided in design phase. When the subject for the proposed process is superstructure of steel box bridge in construction, the structural calculation sheet can be derived with the structural design process based on BIM.

Seismic Analysis Process of Steel Box girder Bridge based on BIM (강상자형 교량의 BIM기반 내진해석 프로세스)

  • Lee, Heon-Min;Lee, Jin-Kyoung;Yoo, Jae-Myoung;Shin, Hyun-Mock
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.24 no.4
    • /
    • pp.421-428
    • /
    • 2011
  • The communication of each others is lack between planing, design, construction and maintenance in domestic construction industry. This problem makes the omission of information and the loss of cost. So, the introduction of BIM can be the solution about that. BIM manages all information generated during all life-cycle of a structure and consequently maximizes the efficiency of utilizing information. This is done through 3D information model associated with a three-dimensional(3D) parametric CAD. This study proposes the seismic analysis process of steel box bridge for structural design of bridge construction project based on BIM. The additional process is needed for the purpose that structural data is inherent in the property information of 3D information model. This process has 3D modeling progress done by using the information decided in design phase. The design document of seismic analysis can be derived with the proposed process to steel box bridge.

Schematic Estimate Framework of Finishing Works based on IFC-BIM Knowledge (IFC-BIM 연계 지식정보기반 마감공사 개산견적 프레임워크)

  • Park, Sang-Hun;Park, Hyung-Jin;Koo, Kyo-Jin
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.6
    • /
    • pp.4176-4184
    • /
    • 2015
  • Cost Estimate for alternative in design phase of construction become criterion for profitability and feasibility analysis of projects. Initial design phase performed schematic estimate based on similar data in the past. The quantity take-off according to estimators experience and calculation method are occurred different or missing. IT (Information Technology) technology evolution has been promoting BIM technology in construction. It is changing the paradigm of planning, design, construction and maintenance phase throughout the construction project. A number of studies have been attempted to apply BIM technology in the construction. In this paper, we propose schematic estimation framework linking standard format IFC (Industry Foundation Classes) and estimate related knowledge. As a result, it performs a cost prediction for decision-making in the design phase, and expected to overcome the limitations of previous studies. In addition, it is possible actively coping with changes.