Reproduction of Piping Failure Due to the Permeable Layer Using Centrifuge Test (원심모형실험을 통한 전석층이 존재하는 제방에서의 파이핑 현상 모사)

  • Jin, Seok-Woo;Kim, Nam-Ryong;Kim, Dong-Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.1C
    • /
    • pp.1-10
    • /
    • 2011
  • This paper simulates the piping effect, found levees with large difference in coefficient of permeability within the foundation such as the Gim-po Levee, via centrifuge model test which is a model test. We have also conducted a numerical analysis under the same conditions as the centrifuge model test to compare its results. First, we decided to use the centrifuge model based on the Gim-po Levee, and the tests were executed on a model levee with pore water pressure transducers. We have found that most of the water flows through the permeable layer and causes the piping effect. Via video camera footage, we have found that the piping effect occurred at the toe of the model levee. The characteristic of pressure head distribution, obtained from the pore water pressure transducers, also proves the occurrence of the piping effect. The numerical analysis results also showed the same results as the centrifuge model test. We have simulated the piping effect via centrifuge model test and believe that the centrifuge model test is viable for various tests, predictions and evaluation of the levee problems.

A Design and Operation of EPBM Applied in Fort Canning Boulder Bed of Singapore (싱가포르 포트캐닝 전석층에 적용된 EPBM의 설계 및 시공)

  • Kim, Uk Young;Noh, Seung Hwan;Noh, Sang Rim
    • Tunnel and Underground Space
    • /
    • v.25 no.5
    • /
    • pp.417-422
    • /
    • 2015
  • This paper introduces the design and operational considerations for TBM tunneling in boulder bed which poses significant problems in terms of advance rate and machine wear. Managing these problems is difficult since normal soil investigation techniques do not accurately predict the presence and frequency of boulders. This has leads to considerable extra costs and delays during construction. In this paper, EPBM design and operational parameters, cutter wear characteristics and soil conditioning method in soft ground condition were studied and key successes were highlighted for future projects in similar ground condition.