A study on the normal project duration development for the construction of multi-utility tunnel in the existing city (기존시가지의 공동구 건설을 위한 표준공기 산정에 대한 연구)

  • Lee, Seong-Won;Lee, Pil-Yoon;Byun, Yo-Seph;Cho, Choong-Yeun;Lee, Min-jae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.12
    • /
    • pp.677-685
    • /
    • 2018
  • In construction, schedule management is the basic but important step, for the effective schedule management, the preparation of the reasonable schedule table should be prioritized. In the design stage, the optimal construction period can be selected through comparison of various conditions and construction methods considering weather conditions and site characteristics. But, At the planning phase, it is difficult to select the effective method and calculate the proper construction period by the basic data(D/B) analysis. In this paper, the construction method considering characteristics of each type and conditions of existing city was selected. For the reasonable duration calculation, we analyzed the unit schedule for RC method for open type and Shield TBM method for tunnel type. The normal project duration of construction assuming of 1,200m of extension and every 200m of ventilation was prepared by integrating each unit schedule. It was analyzed that it took 893 days for the open type and 616 days for the tunnel type. The results of this study will help to make type selection and normal project duration more easily in the planning phase. If it is linked to the design stage, it will be easy to estimate the process and construction cost.

A Study on the Estimate Criteria and Influence Factors of Construction Duration of Domestic Firms -Focused on the Apartment Building Firms- (국내 건설 업체 공기산정 기준 및 영향요인 연구 -공동주택 중심으로-)

  • Kim Sun-Yeop;Kim Sun-Kuk;Han Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.447-450
    • /
    • 2004
  • The domestic construction industry have focus on duration than construction cost. But recently it have interesting to The domestic construction industry, social requirement is changing. At the moderate speed duration has other angle of reducing cost and management of efficiency. specially Apartment building construction process is similar to other construction industry so it Is obtain a strong Point. This study on, A Target of construction industry is short duration than other it, general construction duration in summary schedule of level is studied, is based and construction duration for the point it is indicated reduction duration

  • PDF

Analysis of Efficiencies in pro environmental constructed Wetlands for Treating sewage treatment effluent (친환경 인공습지 조성을 통한 하수처리 방류수 재처리 효과분석)

  • Lim, Gun Muk;Park, So Mi;Ha, Eun Jung;Lee, Jong Jin
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2020.06a
    • /
    • pp.220-220
    • /
    • 2020
  • 영산강수계는 상류에 4개의 농업용 댐이 위치하여 환경대응용수 확보 및 하천유지유량이 절대적으로 부족하고, 갈수기 하천 유량의 약 67 %가 광주 제 1, 2 하수처리장 방류수가 차지하고 있어 하천의 수질과 수생태계를 위협하고 있다. 이에 최근에는 오염된 하천의 건강성을 회복하기 위한 방법으로 수생태계의 정화능력을 활용한 인공습지가 각광받고 있다. 영산강 유역에서도 자연의 정화능력을 활용하여 하천 오염원을 저감시키기 위한 사업의 일환으로 2016년 광주 제 2 하수처리장 방류구에 서창오미공원 습지를 조성하였다. 이 습지는 유입량이 적어 정상적 기능이 어려운 기존 습지를 재조성한 것으로 하수처리장 방류수 약 5만 ㎥/day을 습지로 유입시켜 수질정화용 식재식물을 이용하여 하수처리장 방류수 수질을 개선한 사업이다. 2016~2017년 모니터링 결과, 습지 유입 전·후 BOD는 평균 33.5 %, 최대 73.1 % 저감 되었으며, T-P 또한 평균 59.3 %, 최대 91.6 % 저감 되었다. 그러나 습지는 운영기간 경과 시 퇴적물 축적, 고사체로 인한 T-P 용출 등으로 인하여 처리수의 수질이 더 악화될 우려가 있기 때문에 습지 조성 후 지속적인 유지관리와 모니터링이 필요하다. 그 예로 하수처리장 방류수와 비점오염원 처리를 위해 주암호에 조성된 인공습지의 경우, 2001년 준공 후 지속적인 관리 및 모니터링을 통하여 약 17년이 지난 2018년에도 BOD 49.3 % T-N 65.1 %, T-P 19.2 % 로 저감되어 오염원 및 영양염류 제거에 큰 효과가 있는 것으로 나타났다. 따라서 본 조사에서는 서창오미공원과 주암호 인공습지 운영 결과를 토대로 습지 모니터링의 중요성과 적정 운영 방안을 제시하고자 하며, 영산강 하천의 점·비점오염원 저감을 위한 신규 인공습지 조성 사업에 기초자료로 활용하고자 한다.

  • PDF

A Pilot Study on Development of Market-Driven Construction Cost-Reference (민간 중심 BOTTOM-UP 방식 건설공사 단가 수립 체계 개발을 위한 기초 연구)

  • Kim, Kyeong-Baek;Lee, Ga-Yeoun;Kim, Sang-Bum
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.41 no.2
    • /
    • pp.151-159
    • /
    • 2021
  • Cost information in the Korean construction industry is mainly controlled by the government agencies. However, there have been wild-spread speculations among participants on the adequacy of these unit prices and difference with the actual market condition. Korean public-led unit prices are developed using mainly a top-down approach by a few designated public institutions. Due to the rapid fluctuations in market prices and high-volume of information, it is impossible for a few public institutions to properly consider market conditions. However, there are almost none private cost reference while many are available in other countries to supplement the public cost references. Needs for private cost references have recognized, and this study can be seen as a pilot study to support them. This study attempts to identify the problem areas of Korean cost references and to provide guidance by benchmarking other countries. This study has confirmed the need of developing market-driven cost references by employing a bottom-up approach in which a large number of various construction participants are fostered to provide their own cost information and share with others. It is envisioned that this study provides foundations for further study on the development on-line construction market platform based on abundant and appropriate cost information.

Analysis of Determinants of Employment Quality of Youth in Seoul: Focused on Population Movement, Labor Market Trends, Job Duration and Wages (서울시 청년층의 고용의 질 결정요인 분석: 인구이동, 노동시장 동향, 일자리 지속기간 및 임금을 중심으로)

  • Hwang, Kwanghoon
    • Land and Housing Review
    • /
    • v.13 no.1
    • /
    • pp.39-54
    • /
    • 2022
  • Using the 1st to 13th rounds of occupational history data of the Korea Employment Information Service's Youth Panel (YP2007), this study explores the trends and characteristics of the youth labor market in Seoul. We further empirically investigated the job duration and wage determinants of youth employed in Seoul. The results confirm that workers who have a higher income and a higher consistency with their majors are less likely to leave. In addition, we find that workers in full-time, householders, or labor unions have a higher income if they are men and work in large companies. In particular, compared to the reference group (appropriate academic background, appropriate skill), mismatches in the lack of education and skill showed a wage increase effect of 4.9% and 5.5%, respectively. For the major consistency, the wage of the matched major group is 3.8% higher than the non-matched major group.

A Study on the Improvement Plan through Analyzing the Perception of Expert Group about Landscape Construction Defects (조경공사 하자에 관한 전문가 집단간 인식분석을 통한 개선방안 연구)

  • Lee, Sang-Suk;Yu, Joo-Eun
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.40 no.4
    • /
    • pp.104-113
    • /
    • 2012
  • This study aimed to find out the improvement plan through analyzing the perception of the expert group engaged in landscape architectural construction and to focus on analyzing the expert groups' experience on Landscape Construction Defects (LCD), defect liability, warranty period, and implementation of the defect liability. The results are as follows: 1. Regarding the experience on the LCD, landscape construction contractors were an awareness of the LCD issue at a serious level, while public-sector clients recognize moderately the LCD issue; and on the first priority in defect implementation, landscape construction contractors considered repair cost while public-sector clients value the identifying causes of defects. 2. In disagreement on the defect liability, landscape construction contractors attributed it to client's lack of responsibility for maintenance while public-sector clients ascribed it to the absence of dealing a criteria with LCD, and regarding the appropriate defect implementation, public-sector clients preferred the following objective by dealing the criteria with LCD while landscape construction contractors advocates by sharing the responsibilities for dealing with LCD based on the identified causes of construction defects. 3. Regarding the warranty period, the public-sector clients considered the 2-year warranty period as appropriate while landscape construction contractors considered it comparatively long, and concerning the commencement of defect warranty period, the public-sector clients viewed it as it should commence to cover the overall completion of the construction while landscape construction contractors perceived it to start on the completion of each work. 4. As for the improvement of the defect implementation system, public-sector clients considered it necessary to establish the objective dealing the criteria with LCD while landscape construction contractors viewed the legislation of maintenance duty. Also, with regard to the important value in establishing and dealing the criteria with LCD, public-sector clients pointed out the objective of the criteria for determining the defects per work type while landscape construction contractors suggested client (user)'s maintenance duty. Because of research, because the system in dealing with LCD is an absence of LCD management agency and dealing the criteria with LCD, it is needed to establish an LCD management agency and make the system in dealing with LCD.

A Basic Study on Effective Adjustment Method for Construction Escalation/De-Escalation Price (건설공사 중 물가변동에 따른 효율적인 계약금액 조정에 관한 기초 연구)

  • Sung, Ju-yong;Kim, Dong-jin;Lee, Min-jae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.3
    • /
    • pp.3-11
    • /
    • 2019
  • The construction of a facility is an act whereby infrastructure such as roads and railways and other facilities such as housing and office spaces are constructed, and due to the characteristics of the relevant industry where such construction is carried out in a custom order method, it requires a long period of time mostly. While the construction is carried out over a long period of time, fluctuations in the price of raw materials required for the construction occur. Therefore, the cost of the construction also fluctuates inevitably. The fluctuation of the construction cost meshes closely with the profit of a constructor and the efficiency of government spending. Therefore, it is necessary to maintain the construction cost at a reasonable level by adjusting the construction cost rationally in order to secure the required construction quality and spend the budget efficiently. The buffer system for solving such problem is the contract amount adjustment system by fluctuations in prices (Escalation/De-Escalation). In this study, the method combining the escalation method based on the item adjustment method was suggested for an efficient contract amount adjustment method. In addition, it is proposed that there be an investigation and codification of matters not applied to government acts and regulations on contracts related to the adjustment of fluctuations in prices legally.

Technical Proposal based Bidding System Applying the Concept of the Lowest Total Combined Bid Price for Supplying Affordable Housing (최저통합환산가격 개념을 적용한 기술제안 기반 입찰제도)

  • Cho, Gun-Hee;Kang, Seung-Hee;Lee, Jeong-Seok;Sohn, Jeong-Rak;Bang, Jong-Dae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.94-105
    • /
    • 2010
  • Recently, resettlement problems of low income groups in the urban regeneration area have been issued in Korea because they have no capability to purchase (or lease) redeveloped housing (or apartment). There are several approaches for supplying affordable housing and one of these is the bidding system which can reduce construction cost. However, the lowest bidding system has many problems such as dumping and substandard quality. In this context, this study proposed bidding system based on technical proposal applying the concept of the lowest total combined bid price for optimization of bid price, reduction of construction cost and period, and maintenance of suitable quality. This bidding system embraces the best value and cost plus time concept on the basis of an improved lowest price bidding system. It consists of the following components: work unit based, project unit based, and period reducing technical proposals. The proposed bidding system for determining bidders are designed to evaluate the adequacy of each technical proposal in the order of the combined minimum price in an effort to effectively optimize bid prices and reduce the construction periods, as well as to maintain a minimum appropriate quality.

Legal Issues of Medical Institution Remodeling (의료기관 리모델링의 법적 제문제)

  • Shin, Tae-Seop;Chung, Mi-Young
    • The Journal of the Korea Contents Association
    • /
    • v.21 no.8
    • /
    • pp.294-304
    • /
    • 2021
  • Medical institutions remodel existing hospital buildings rather than construct buildings to satisfy patient satisfaction and enhance competitiveness with other medical institutions. Medical institution remodeling is gradually increasing due to enhanced laws and systems to improve the quality of medical services and the level of patient safety. However, prior studies were discussed only within a limited range, including architectural elements, about medical institution remodeling. Therefore, this study aims to provide basic data to medical institutions planning future remodeling by examining the legal issues of medical institution remodeling in various ways. Medical institution remodeling extends the construction period due to restrictions on construction conditions, and causes damage such as noise and dust to patients. So it is necessary to prevent damage to patients in advance and to support appropriate remodeling of medical institutions. Therefore, it is necessary to prepare an Act on promotion of and support for remodeling of medical institutions. In addition, medical institutions should prepare a checklist for voluntary compliance with construction standards, preventive measures and post-improvement measures, and measures for infection and radiation exposure in hospitals.

Improvement of the Calculation Standard for Prolongation cost of Domestic Public Construction Project (국내 공공 공사 공기연장 간접비 산정 기준 개선방안 - 국가계약법 및 지방계약법 산정기준의 비교 고찰 -)

  • Jeong, Kichang;Lee, Jaeseob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.4
    • /
    • pp.95-102
    • /
    • 2016
  • Recently, a research regarding calculation of construction time extension-oriented incidental costs has been intensively suggested in quantitative aspect and recent studies on system improvement has been made continuously. In the case of Domestic Public Construction Works, State Contract Act is applied when the client is government whereas Local Government Contract Act is done when the client is local government, but more meticulous study is required because improvement plan is not proposed even there is a clear demand for improvement of these problems on calculation standard. Thus this study suggested appropriate standard by comparing each the calculation standards followed by 'State Contract Act' and 'Local Government Contract Act', considering the problems accorded, and analyzing field cases. Calculation method of other expenses was differently regulated as the revision of each regulation, and this demonstrates that there is a difference of actual cost from 12.37% to 24.95%. It is shown that less cost of construction time were calculated than actual cost according to a problem of calculation method by State Contract Act as the rate at the time of contract to be applied in other expense rate. This study suggested the rate against incidental cost and the rate of other expense per day against total construction cost as an appropriate rate calculation for other expense based on field database.