• Title/Summary/Keyword: 적산프로그램

Search Result 13, Processing Time 0.019 seconds

Cooling Control of Greenhouse Using Roof Window Ventilation by Simple Fuzzy Algorithm (단순 퍼지 제어기법을 이용한 온실의 천창환기에 의한 냉방제어)

  • Min, Young-Bong;Yoon, Yong-Cheol;Huh, Moo-Ryong;Kang, Dong-Hyun;Kim, Hyeon-Tae
    • Journal of agriculture & life science
    • /
    • v.44 no.4
    • /
    • pp.69-77
    • /
    • 2010
  • Fuzzy control is widely used for improving temperature control performance as controlling ventilation in greenhouse because the technique can respond more flexibly to the outside air temperature and wind speed. By pre-studied PID and normal fuzzy control this study was performed to obtain the fundamental data that can be established in better greenhouse ventilation control method. The temperature control error by the simple fuzzy control was $1.2^{\circ}C$. The accumulated operating size of the window and the number of operating were 84% and 13, respectively. These showed equivalent control performance with pre-studied result that control error. The accumulated operating size of the window and the number of operating were 75% and 12, respectively. The proposed fuzzy technique was simple control logic method compared with step and PID control methods, but it showed equivalent performance. Therefore, the proposed simple fuzzy control method could be used in micro controller of small programmable memory size and many applications.

Development on Repair and Reinforcement Cost Model for Bridge Life-Cycle Maintenance Cost Analysis (교량 유지관리비용 분석을 위한 대표 보수보강 비용모델 개발)

  • Sun, Jong-Wan;Lee, Dong-Yeol;Park, Kyung-Hoon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.11
    • /
    • pp.128-134
    • /
    • 2016
  • Estimating the repair and reinforcement (R&R) costs for each bridge member is essential for managing the life cycle of a bridge using a bridge management system (BMS). Representative members of a bridge were defined in this study, and detailed and representative R&R methods for each one were drawn in order to develop a systematic maintenance cost model that is applicable to the BMS. The unit cost for each detailed R&R method was established using the standard of estimate and historical cost data, and a systematic procedure is presented using an integration program to enable easy renewal of the R&R unit cost. Also, the average unit cost of the representative R&R methods was calculated in the form of a weighted average by considering the unit cost and application frequency of each detained R&R method. The appropriateness of the drawn average unit cost was reviewed by comparing and verifying it with the previous historical unit cost. The suggested average R&R unit cost can be used to review the validity of the required budget or the appropriateness of the R&R performance cost in the stage to establish the bridge maintenance plan. The results of this study are expected to improve the reliability of maintenance cost information and the rationality of decision making.

A Case Study on the Effective Liquid Manure Treatment System in Pig Farms (양돈농가의 돈분뇨 액비화 처리 우수사례 실태조사)

  • Kim, Soo-Ryang;Jeon, Sang-Joon;Hong, In-Gi;Kim, Dong-Kyun;Lee, Myung-Gyu
    • Journal of Animal Environmental Science
    • /
    • v.18 no.2
    • /
    • pp.99-110
    • /
    • 2012
  • The purpose of the study is to collect basis data for to establish standard administrative processes of liquid fertilizer treatment. From this survey we could make out the key point of each step through a case of effective liquid manure treatment system in pig house. It is divided into six step; 1. piggery slurry management step, 2. Solid-liquid separation step, 3. liquid fertilizer treatment (aeration) step, 4. liquid fertilizer treatment (microorganism, recirculation and internal return) step, 5. liquid fertilizer treatment (completion) step, 6. land application step. From now on, standardization process of liquid manure treatment technologies need to be develop based on the six steps process.