Adding important new projects such as reservoirs which regulate a river discharge to a river system, existing operation methods should be changed considering these conditions. Since an original operation rule used for an existing system has been designed to be compatible to inputs and outputs of the existing system, the operation rule should be changed to consider the new projects. In this study, the technique of constructing new operation rules considering objectives of both old and new projects is suggested when new project is added to the river system. Reservoir operation rule using both stochastic inflow and optimization technique is developed. As a result of applying the technique to Geum river basin, the efficiency of the technique is verified.
The purposes of the reservoir operation during flood period are the reduction of the flood damage in the downstrem reaches and the conservation of flood control for the later use. This paper presents a model of simulation technique to determine the real-time operating rules on an hourly basis. The objective of strategy is to minimize the miximum release through the spillway gates with consideration of the uncertainties associated with the forecasted inflows. In this paper, a general procedure for solving this problem is described for a single and paralle reservoirs.
This paper presents a methodology of developing reservoir operating rules which can consider the reliability levels incorporated with the discharge policy. The operating rules were derived based on the regression and risk analysis of the optimally operated results by using the long term historical and generated reservoir inflows. The methodology was applied to the operation of the Chungju reservoir system which is consisted of two reservoirs and powerplants, and monthly operation rules were developed. Simulations were performed by using the developed operating rules can not only significantly improve the output from the existing system but also improve the reliability incorporated with the output.
Proceedings of the Korea Water Resources Association Conference
/
2010.05a
/
pp.342-345
/
2010
본 연구는 인접한 저수지 간의 연계운영을 통한 홍수조절 및 용수공급능력을 제고시키기 위한 저수용량 공유기법 개발의 일환으로 영주댐과 안동댐 및 임하댐의 병렬저수지 시스템을 연구대상으로 하였다. 홍수조절에 의한 병렬저수지의 연계운영기법으로서 병렬저수지 시스템인 영주/안동/임하댐 유역에서 홍수시 영주/임하댐의 저수량을 안동댐으로 전환시켜 영주/임하댐의 홍수조절능력을 제고시키고 안동댐의 저수량을 확보시켜 용수공급능력을 제고시킬 수 있는 방법을 연구하였다. 연구결과, 최적화계수(유량전환비:a)는 영주댐의 경우 1999년 9월 22일 ~ 26일 호우, 태풍 루사 및 태풍 매미일 때 모두 a=1.000, 임하댐의 경우 1999년 9월 22일 ~ 26일 호우, 태풍 루사 및 태풍 매미일 때 각각의 유량전환비는 $a_{1999}$=0.135, $a_{2002}$=0.372 및 $a_{2003}$=0.420으로 산정되었다. 영주댐에서 안동댐으로 그리고 임하댐에서 안동댐으로 전환할 수 있는 유량은 실제 호우적용시 전환유량은 매우 큰 것으로 확인되었다. 그리고 유량전환시 댐하류 안동, 지보, 달지지점에서 홍수 조절효과가 큼을 확인할 수 있었다.
Proceedings of the Korean Operations and Management Science Society Conference
/
2004.05a
/
pp.685-688
/
2004
본 연구에서는 저수지군 연계운영을 위한 표본 추계학적 선형 계획(SSLP, Sampling Stochastic Linear Programming) 모형을 제안한다. 일반적 추계학적 모형은 과거 자료로부터 확률변수의 확률분포를 추정하고 이를 몇 개 구간으로 나누어 이산 확률 값을 산정하여 기댓값이 최대가 되는 운영방안을 도출하지만 저수지 유입량 예측시 고려되어야할 지속성 효과(Persistemcy Effect)와 유역간 또는 시점별 공분산 효과(The joint spatial and temporal correlations)를 반영하는데 많은 한계가 있다. 이를 극복하기 위하여 과거자료 자체를 유입량 시나리오로 적용하여 시${\cdot}$공간적 상관관계를 유지하는 표본 추계학적(Sampling Stochastic)기법을 바탕으로 Simple Recourse Model로 구성한 추계학적 선형 계획 모형을 제시한다. 이 모형은 미국 기상청(NWS)에서 발생 가능한 유입량의 시나리오를 예측하는 방법인 앙상블 유량 예측(ESP, Ensemble Streamflow Prediction)을 통한 시나리오를 적용함으로써 좀더 신뢰성 있는 저수지군 연계운영 계획을 도출 할 수 있을 것으로 기대된다.
Kim, Young-Deuk;Choi, Yo-Han;Kim, Hae-Do;Jo, Jin-Hoon
Proceedings of the Korea Water Resources Association Conference
/
2010.05a
/
pp.1656-1660
/
2010
저수지와 양수장은 우리나라에서 용수공급면적기준으로 전체 공급량의 78%를 차지하는 중요한 용수 공급시설이다. 본 연구의 목적은 저수지와 양수장의 환경영향을 LCA기법을 이용해 비교 분석함으로써 두 시설들의 환경영향을 정량적으로 평가하는데 있다. 연구대상 수리시설로서 경기도 안성에 위치한 이동저수지와 은산양수장을 선정하여 각각에 대하여 농업수리시설의 전과정평가를 실시하였다. 평가를 위하여 네덜란드 Pre사가 개발한 소프트웨어 Simapro 7.1를 이용하였다. 두 시설에 대한 원료물질 취득 단계부터 건설, 운영, 유지관리 및 폐기단계까지 전과정의 환경영향을 분석한 결과, 두 종류의 시설 설치에 따른 토지이용, 상 하류의 생태적 영향 등이 고려되지 않았지만 저수지에 의한 농업용수 공급이 양수장에 의한 용수 공급보다 환경친화적이라고 볼 수 있다. 저수지의 경우 건설단계의 환경영향이 크고, 양수장의 경우, 운영단계에 환경영향이 큰 것으로 분석되었다. 단계별로 환경영향은 저수지는 건설단계에 건설재료 예를 들어 레미콘, 시멘트 등이 환경부하를 크게 발생시키기 때문이고, 양수장은 이용 단계에서 용수공급을 위한 전력사용에서 기인하는데, 이는 전력생산시 화석연료와 같은 자원소비가 많기 때문이다. 이번 연구는 토목시설물중 농업 용수 공급시설의 전과정에서 환경영향을 종합적으로 평가하는데 LCA가 활용되었다는 점에서 의의가 있으며, 향후 하드웨어적인 시설뿐만 아니라 농업용수 공급에 따른 전과정평가를 수행하고, 농업용수 LCI D/B 구축에 기초자료를 제공할 수 있을 것으로 예상된다.
In this study, the formulation of the developed mixed-integer programming model for a multi-reservoir system including hydro-electric power generation (park et al., 2001) has been improved for multiple reservoir system operation using risk evaluation criteria. Sequential linear programming(SLP) was applied for the linearization of the hydro-electric energy term in the model. In order to allocate monthly reservoir release reasonably the value of weight for hydro-electric energy was assigned by level of power generation hour. The improved model was applied to the five reservoirs system in the Han river. And could be confirmed the availibility of new formulation appling risk evaluation criteria.
Proceedings of the Korea Water Resources Association Conference
/
2012.05a
/
pp.393-397
/
2012
인접한 저수지 간의 연계운영을 통한 홍수조절 및 용수공급능력을 제고시키기 위해서 저수용한 공유기법의 일환인 병렬저수지 시스템을 연구대상으로 안동댐 및 임하댐 유역을 연계운영기법으로서 홍수조절능력을 제고시키고 안동댐의 저수량을 확보시켜 용수공급능력을 제고시킬 수 있는 방법을 연구하였다. 특히 유역추적과 하도추적을 통해 계산된 매개변수들을 실제 형태와 비교분석하여 산정하고, 이에 따른 가장 적합한 강우-유출해석을 통한 하류 지역의 홍수 피해를 최소화하기 위한 예 경보 기법을 제시하였다. 최적의 유수전환용량을 산정하기 위해 저수지간의 Swiching 기법을 고려하였으며, HEC-HMS 모형을 이용하여 재현기간별 유입량을 예측하여 결과를 도출하였다.
During drought or impending drought period, the reservoir operation method is required to incorporate demand-management policy rule. The objective of this study is focused to the development of demand reduction rule by incorporating hedging-effect for a single reservoir system. To improve the performance measure of the objective function and constraints, we could incorporate three risk performance criteria proposed by Hashimoto et al. (1982) by mixed-integer programming and also incorporate successive linear programming to overcome nonlinear hedging term from the previous study(Shih et al., 1994). To verify this model, this hedging rule was applied to the Daechung multi-purpose dam. As a result, we could evaluate optimal hedging parameters and monthly trigger volumes.
Kim, Hye-Jin;Ahn, Jae-Hwang;Choi, Chang-Won;Yi, Jae-Eung
Journal of the Korean Society of Hazard Mitigation
/
v.11
no.2
/
pp.147-156
/
2011
The purpose of multipurpose reservoir operation in flood season is to reduce the peak flood at a control point by utilizing flood control storage or to minimize flood damage by controlling release and release time. Therefore, the most important thing in reservoir operation for flood season is to determine the optimal release and release time. In this study, goal programming is used for the optimal reservoir operation in flood season. The goal programming minimizes a sum of deviation from the target value using linear programming or nonlinear programming to obtain the optimal alternative for the problem with more than two objectives. To analyze the applicability of goal programming, the historical storm data are utilized. The goal programming is applied to the reservoir system operation as well as single reservoir operation. Chungju reservoir is selected for single reservoir operation and Andong and Imha reservoirs are selected for reservoir system operation. The result of goal programming is compared with that of HEC-5. As a result, it was found that goal programming could maintain the reservoir level within flood control level at the end of a flood season and also maintain flood discharge within a design flood at a control point for each time step. The goal programming operation is different from the real operation in the sense that all inflows are assumed to be given in advance. However, flood at a control point can be reduced by calculating the optimal release and optimal release time using suitable constraints and flood forecasting system.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.