• Title/Summary/Keyword: 저수지 댐

Search Result 680, Processing Time 0.031 seconds

Waterbody Detection from Sentinel-2 Images Using NDWI: A Case of Hwanggang Dam in North Korea (Sentinel-2 기반 NDWI를 이용한 수체 탐지 연구: 북한 황강댐을 사례로)

  • Kye, Changwoo;Shin, Dae-Kyu;Yi, Jonghyuk;Kim, Jingyeom
    • Korean Journal of Remote Sensing
    • /
    • v.37 no.5_1
    • /
    • pp.1207-1214
    • /
    • 2021
  • In thisletter, we developed technology which can exclude effect of cloudsto perform remote waterbody detection based on Sentinel-2 optical satellite imagery to calculate the area of ungauged reservoirs and applied to the Hwanggang dam reservoir, a representative ungauged reservoir, to verify usability. The remote waterbody detection technology calculates the cloud blocking ratio by comparing the cloud boundary in the Sentinel-2 imagery and the reservoir boundary first. Next, itselects data whose cloud blocking ratio does not exceed a specific value and calculates NDWI (Normalized Difference Water Index) with selected imagery. In last, it calculatesthe area of the reservoir by counting the number of grids which have NDWI value considered as waterbody within the boundary of the target reservoir and correcting with cloud blocking ratio. To determine cloud blocking ratio threshold forselecting image, we performed the area calculation of Hwanggang dam reservoir from July 2018 to October 2021. As a result, when the cloud blocking ratio threshold wasset 10%, we confirmed that the result with large error due to clouds were filtered well and obtained 114 results that can show changes in Hwanggang dam reservoir area among 220 images.

  • 이찬구;원종호;윤운상;최원학
    • Proceedings of the KSEG Conference
    • /
    • 2004.03a
    • /
    • pp.23001-23094
    • /
    • 2004
  • 댐의 항구적인 안전을 담보하기 위해서는 댐 구조물 자체가 안전하여야 함은 물론 댐 구조물의 기초를 이루는 지반이 충분한 차수성과 내하성을 가져야 하므로 이들의 특성을 규명하기 위한 지질조사는 매우 중요하다. 댐 지질조사의 목적은 댐의 기초지반, 댐 체 축조를 위한 재료원 및 저수지 주변지반 등에 대한 지질학적 특성을 파악하고, 댐의 설계와 시공에 필요한 지질공학적 제반 성질을 상세히 파악하는데 있다. (중략)

  • PDF

Development of Optimal Operation Rule for Multipurpose Reservoirs System (다목적댐의 연계운영을 위한 최적 운영률 개발)

  • Yi, Jae-Eung
    • Journal of Korea Water Resources Association
    • /
    • v.37 no.6
    • /
    • pp.487-497
    • /
    • 2004
  • Adding important new projects such as reservoirs which regulate a river discharge to a river system, existing operation methods should be changed considering these conditions. Since an original operation rule used for an existing system has been designed to be compatible to inputs and outputs of the existing system, the operation rule should be changed to consider the new projects. In this study, the technique of constructing new operation rules considering objectives of both old and new projects is suggested when new project is added to the river system. Reservoir operation rule using both stochastic inflow and optimization technique is developed. As a result of applying the technique to Geum river basin, the efficiency of the technique is verified.

3-Dimensional Hydrodynamic and Water Quality Change Simulation of Jingyang Reservoir Using EFDC-WASP (EFDC-WASP을 이용한 진양호의 3차원 수리.수질 변화 모의)

  • Jeong, Young-Won;Kim, Young-Do;Kim, Jeong-Kon
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2010.05a
    • /
    • pp.1079-1083
    • /
    • 2010
  • Due to summer rainfall is concentrated in the construction of the reservoir and the dam was inevitable. The character of these structures are different from the common rivers have been characterized. According to this problem, we need to adopt to this area with three dimensional model. Construction of dams for preservation of land, utilization of water resources, and exploitation of energy potential, which is a basic element of countries' development, is regarded as indispensable for peoples. In addtion, the development of the Nakdong River nutrient and pathogen Total Maximum Daily Loads (TMDL) required that the full range of pollutants, sources, and flow conditions, typical of heavily urbanized areas, be addressed for a single water body with 1-D simulation model (river) and 3-D simulation model (reservoir). The objective of this study is to simulate the applicability of reservoir with the coupling of 3-D hydrodynamic and water quality models to estimate water balance and pollutant loading in Namgang Dam(Jinyang reservoir).

  • PDF

Improvement of Reservoir Turbidity Prediction Model with Considering Particle Sizes of Suspended Sediments (부유물질 크기분포를 고려한 저수지 탁도 예측 모델 개선)

  • Lee, Heung-Soo;Chung, Se-Woong;Liu, Huan;Jeong, Hee-Young
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2008.05a
    • /
    • pp.1378-1383
    • /
    • 2008
  • 댐 저수지에서 지속적인 탁도를 유발하는 물질은 쉽게 침강되지 않는 $20{\mu}m$이하의 작은 부유물질(SS)이며, 가을 수직혼합 시기까지 침강되지 않은 부유물질은 다시 재부상하는 경우도 발생한다. 저수지내 탁수의 장기 체류는 수자원 이용과 하류하천의 수생태계에 다양한 문제를 야기하고 있어 일부 댐에서는 실시간 탁도 감시 장치를 설치하고 취수설비를 개선하는 등의 탁수저감 대책의 노력을 기울이고 있으나, 시설의 최적 운영을 지원할 수 있는 탁수 거동 및 탁도 예측에 관한 연구는 아직 부족한 실정이다. 특히, 탁도는 물 속에 존재하는 부유물질의 광학적 특성(light attenuation)을 나타내는 지표로써 SS와는 물리적인 물성이 달라 실시간 계측자료(탁도)와 모델의 모의 변수(SS)가 다른 문제점 때문에 모델링에 어려움이 있었다. 지금까지 탁도 모델링은 대부분 탁도와 SS의 상관관계를 이용하는 방법을 사용하였다. 그러나 이 방법은 탁도-SS 관계가 실측지점과 입자크기분포에 따라 달라지는 특성 때문에 변환과정에 예측결과의 불확실성이 내재한다는 지적을 받아왔다. 본 연구의 목적은 저수지로 유입한 탁수의 보다 과학적이고 정확한 탁도 예측을 위해 탁도를 유발하는 부유물질의 입자크기 분포와 공간적으로 변하는 탁도-SS의 상관관계를 고려할 수 있는 표준화된 탁도 모델링 방법을 개발하고, 실측자료를 사용하여 제시된 탁도 모델링 방법의 예측 성능을 평가하는데 있다. 부유물질의 이송-확산-침강 모델은 2차원 횡방향 평균 수리 모델과 연결(coupling)되어 수행되며, 저수지 수면을 통한 열 교환, 바람과 바닥 조도에 의한 난류혼합과 성층해석, 하천 유입수의 저수지내 밀도류 유동, 그리고 입자 크기별 부유물질의 독립침강을 해석한다. 부유입자의 크기분포와 공간적으로 서로 다른 탁도-SS 관계를 고려한 탁도 예측모델은 기존의 탁도를 종속변수로 사용한 예측 방법 또는 단일 입자크기를 사용한 모델보다 개선된 모의결과를 보여주었다. 본 연구에서 제시된 탁도 예측 알고리즘은 실시간 탁수감시와 예측 모델링, 그리고 댐 방류수 탁도 관리를 위한 선택취수 설비의 운영을 위한 의사결정지원시스템에 적용 가능할 것으로 사료된다.

  • PDF

Vertical Profiles of Alkaline Phosphatase Activity in Dam Reservoirs and its Relation with Microbial Parameters (댐 저수지에서 alkaline phosphatase 활성의 수직변화와 미생물 요인들과의 상관관계)

  • Nakagawa, Ayumi;Kagawa, Hisanori;Hiroshi, Hirotani
    • Korean Journal of Ecology and Environment
    • /
    • v.37 no.4 s.109
    • /
    • pp.406-410
    • /
    • 2004
  • The alkaline phosphatase activity (APA) of two dam reservoirs and inflowing streams were measured monthly in 2000. During summer months in 2001, the vertical profiles of APA and related parameters were also examined in one of the reservoirs. The APA was relatively high during the summer season in the epilimnion while it was almost invariable in the hypolimnion. A small increase in APA was observed at just above the bottom. The APA fluctuation was independent of the concentration of soluble reactive phosphorus. It was assumed that APA is not indicative of the phosphorus availability status. An examination of size-fractionated samples suggested that APA in reservoirs was attached to particles larger than $0.4{\mu}m$, whereas in streams it existed in a dissolved form. There was a positive significant correlation between chlorophyll a concentration and APA in the photic zone. In the aphotic zone, APA correlated positively with the colony count of heterotrophic bacteria, but not with microscopic total bacterial counts.

Improvement for Reservoir Operation Module of Flood Forecasting-Warning Systems in Han River (한강 홍수예경보시스템의 저수지 운영모듈 개선)

  • Kwon, Oh-Ig;Kim, Sung;Shim, Myung-Pil
    • Journal of Korea Water Resources Association
    • /
    • v.32 no.6
    • /
    • pp.685-695
    • /
    • 1999
  • On the premise of flood control procedure, flood forecasting-warning, system(FFWS) is one of actions for disaster prevention. It makes public announcements for flood situations timely in order to mitigate damage from floodings. Multi-purpose dam which has flood control storage plays an important role in river basin at flood time. In FFWS, it is reservoir operation module that is related to reservoir operation of multi-purpose dam. This study considers the current conditions and problems in reservoir operation module of FFWS in Han River and improves reservoir operation module under limited research scope. As results, additional reservoir operation modules such as Technical ROM(Reservoir Operation Method) and ARD(Approved Release Discharge) ROM were built in FFWS. Using these newly built reservoir operation modules. Han River Flood Control Office will plan and work for flood control and flood forecasting. Firstly, it may plan for flood control by Technical ROM which is deterministic simulation model, and work for final flood control and flood forecasting by ARD ROM according to approved release discharge afterward.

  • PDF

Applicability Evaluation of One- and Two-dimensional Flood Inundation Analysis Models to Establish an Emergency Action Plan for Agricultural Reservoirs (농업용저수지 EAP 수립을 위한 1·2차원 홍수범람해석모형의 적용성 평가)

  • Lee, Dae Eop;Kim, Jae Young;Lee, Gi Ha;Jung, Sung Ho;Yeon, Min Ho
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2021.06a
    • /
    • pp.351-351
    • /
    • 2021
  • 저수지에 대한 비상대처계획수립은 최근 기상이변 등에 따른 대규모 호우가 빈번히 발생하고 있을 뿐만 아니라 세계 도처에서 대규모 지진 등으로 많은 인명과 재산 피해가 속출함에 따라 지진 및 이상홍수에 대한 저수지의 안정성 평가를 수행하고 저수지 지점에서 발생할 수 있는 천재지변 또는 예상치 못한 대규모 재해에 효율적으로 대처하기 위한 비상상황의 등급 및 위험수준을 체계적으로 판단하고 비상상황 가상 시나리오별 체계적 행동요령 및 대처계획을 수립하여 저수지 붕괴에 따른 대규모 홍수피해 예상지역 주민들의 신속한 대응으로 생명과 재산피해를 최소화하는데 목적이 있다. 현행 한국농어촌공사 및 지자체에서 수립하고 있는 30만 톤 이상 저수지에 대한 1차원 모형 기반의 EAP수립은 침수구역을 산정할 때 수치지도에 의한 단일 침수심 분석으로 실제 침수구역과는 많은 오류가 나타난다. 이는 침수구역 부정확에 따른 피해복구액 산정이 과다로 책정될 수 있고, 마지막으로 가장 중요한 비상대처계획 수립에 막대한 영향을 미친다. 이에 본 연구는 댐 붕괴에 대응하기 위한 EAP 수립 시 기본이 되는 홍수범람해석을 수행하고 1차원 및 2차원 모형의 결과검토를 통해 보다 효과적인 비상대처계획의 수립을 위한 방안을 제시하고자 하였다. 이를 위해 경천저수지 유역을 대상으로 가능최대강수량 조건 하에서 가능최대홍수량을 산정하고 DAMBRK 모형을 이용하여 댐 붕괴 모의를 위한 시나리오 구성 및 모의를 수행하였다. 이후 댐 붕괴 모의결과를 이용하여 WMS(Watershed Modeling System) 모형을 이용한 1차원 홍수범람해석과 FLUMEN(FLUvial Modeling ENgine) 모형을 이용한 2차원 홍수범람해석에 적용 후 각 결과를 비교·검토하였다.

  • PDF

Self Organized Pattern Classification and Analysis of Hydrologic Data in Juam Lake (주암호 수문자료의 자기조직화 패턴분류 및 분석)

  • Park, Sung-Chun;Jin, Young-Hoon;Roh, Kyong-Bum;Yang, Dong-Hyun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2012.05a
    • /
    • pp.790-794
    • /
    • 2012
  • 우리나라는 여름철에 강우가 편중되어 있고 동고서저의 산악지형으로 수자원확보가 어려운 실정이며 이는 곧 하천의 유지유량확보의 어려움과도 직결된다. 이러한 수자원확보를 위해 최근 기존 저수지 둑을 높이는 사업이 전국적으로 활발히 진행되고 있으며 이는 저수지나 댐의 수체와 같은 수자원을 보다 적극적으로 활용하여 그 가치를 높임과 동시에 하천에 대한 활용도를 높이고자 하는 데 그 목적이 있다. 따라서 저수지나 댐의 저류량에 기여하는 강우량, 유입량과 같은 수문학적 자료의 심도 있는 분석이 필요하며 수문변수들이 나타내는 복잡한 패턴에 대한 연구가 이루어져야 할 것이다. 본 연구에서는 저수지나 댐의 저류량에 직접적으로 영향을 주는 수문변수들을 전체적으로 파악하기 위해 수집된 수문자료의 각각의 특성 및 자료들 사이의 복합적인 관계를 파악하였으며 이를 위하여 패턴분류 분야에서 그 적용타당성이 입증된 자기조직화 지도(Self-Organizing Map: SOM)를 이용하였다. 본 연구의 대상지점은 섬진강 유역내에 위치한 주암호를 대상지점으로 선정하였으며 패턴분석에 사용한 수문자료의 기간은 2007~2010년까지 5년간의 월평균 자료를 활용하였다. SOM의 적용 결과, 측정수문자료에 대한 전체적인 특성을 패턴분류를 통해 분류하였으며, 각 변수에 대한 패턴별 상대성을 고려한 클러스터별 특성 및 시간적 이질성을 파악할 수 있었다. 이는 측정 자료에 대한 분석 기법개발의 일환으로 향후 수자원 확보에 대한 개발 및 정책의 기초자료로 활용될 것으로 기대된다.

  • PDF

Optimal Operation of Single Multi-Purpose Reservoir (단일다목적 저수지의 최적운영)

  • 이순택;이수식
    • Water for future
    • /
    • v.18 no.4
    • /
    • pp.347-359
    • /
    • 1985
  • This study aims at the development of DP-Model for the establishment of monthly optimal operation policy of single multi-puppose reservoir by which the water demand of downstream can be satisfied under the various physical constraints. Series, A. B. C. of inflow are selected out of future monthly inflow data which are simulated form the past monthly average inflow of Andong dam site. the neight possible alternatives in each inflow series are established in order that Andong dam can supply the water demand of Nagdong main stream of 30% to 100%. Nextly, the reservoir rule curves is derived for each alternative by the detailed seguential analysis of stroage, future inflow and water demand based on the reservoir continuite equation. Then, and alternative which can satisfy the objective function of system based on the rule curves in the exteream is determined as an optimal operation policy from the application of developed DP=Model.

  • PDF