• Title/Summary/Keyword: 저가수주

Search Result 38, Processing Time 0.147 seconds

A Study on the Presumption of Proper Construction Cost of Distribution Facilities by Analyzing Actual Construction Cost (실적공사비 분석을 통한 유통시설물의 적정공사비 추정에 관한 연구)

  • Go, Seong-Seok;Kim, Hyun-Sik;Lee, Hyun-Chul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.108-117
    • /
    • 2008
  • The appearance of the large distribution facility of large enterprise putting first reaches get to the various effect until change of leisure life and life pattern of the consumers from the distribution industry of the interior of a country. Competition of the distribution facility upgrade of the distribution facility and it shows the aspect which becomes the semi-department store, and construction cost is appearing different in proportion to each form or scale. Therefore, purpose of this study was to facilitate amicable construction progress between the owner and the builder through estimating the proper construction cost. This study investigated and analyzed the actual cost of 15 domestic distribution facilities and these datums were used to estimate the proper construction cost. This cost shows that from new project accomplishment through analysis of prediction construction cost for feasibility study from initial plan and design step and can be utilizable elementary data bH decision method to whether or not to propriety of distribution facilities business.

The Effect of Public PMO Service Quality on Customer Satisfaction and Reuse Intention (공공 PMO 서비스 품질이 고객만족과 고객충성도에 미치는 영향)

  • HYUNG-CHUNG, BACK;JA-HEE, KIM
    • The Journal of the Convergence on Culture Technology
    • /
    • v.9 no.2
    • /
    • pp.467-474
    • /
    • 2023
  • After the revision of the Software Promotion Act, small and medium-sized enterprises (SMEs) with little experience in e-government projects began to participate in public projects. Accordingly, the government introduced the public Project Management Office (PMO) in July 2013 to reduce the risks and secure the quality of informatization business, and the public PMO is still spreading. However, the public PMO service currently experiences sluggish business, such as low-priced orders, due to cut-throat competition, and thus needs improvement plans. In this research, we establish a research model for quality factors of public PMO services that can be considered for the improvement plans, measure and evaluate quality factors based on the model, and then analyze the impact of service quality on customer satisfaction and customer loyalty. For that, we measure quality factors using the SERVPERF model for those who have used public PMO services, establish a structural equation research model, and empirically analyze and evaluate the impact of quality factors. Lastly, we suggest improvement plans and implications for public PMO services.

The Necessity of Introducing Development Fee for Archaeology and Suggestions (매장문화재부담금제도의 도입 필요성과 방안)

  • Kim, Gwon Gu
    • Korean Journal of Heritage: History & Science
    • /
    • v.49 no.3
    • /
    • pp.224-239
    • /
    • 2016
  • This article aims to review the major problems of the present Korean management system of archaeology and to seek desirable suggestions in order to pursue the sustainable harmony between the recovery of academic excavations and economic development. In order to continue the sustainable harmony between preserving the values of archaeological resources as limited pure public goods and economic development, the present system of developer's payment for archaeology must be replaced by the introduction of the development fee for archaeology. The excavation of archaeological resources have been done according to the market principle, that is, the lower price principle. But the principle has produced a lot of serious problems in the Korean management system of archaeology, which must result in the market failure. So the governmental intervention is urgently required. By introducing the development fee, the archaeological field units and the developers can avoid direct contact. Instead, the Heritage Management Office will operate the excavation fund raised by the development fee for archaeology in order to avoid low-price contracts, degrading excavation quality, and other related residents' complaints and social conflicts in advance. In addition, the budget for purchasing the preserved excavation sites, which are the source of the landowners' enormous complaints, must be allocated to the Heritage Management Office by the Ministry of Planning and Finance. More budget for small-sized excavations must be allocated as well in order to solve many residents' complaints. These budget increase will be the fundamentals to decrease the residents' big complaints and social conflicts in relation with the archaeological management, which will be a challenge of the Korean government. Along with the governmental efforts, the archaeological field units must do their all-out efforts to overcome many problems in excavation including low-price contracts. Finally, the wage system and working status system must be revised. Excellent young excavators must be recruited appropriately and continue to work in a safe psychological condition, which are the basis to guarantee high-quality excavation.

Chip-level NFP Calibration and Verification Using Improved Probe for NFS Standardization (NFS 표준을 위한 개선된 프로브를 이용한 칩 수준 NFP 측정값 교정 및 검증)

  • Lee, Pil-Soo;Wee, Jae-Kyung;Kim, Boo-Gyoun;Choi, Jai-Hoon;Yeo, Soon-Il
    • Journal of the Institute of Electronics Engineers of Korea SD
    • /
    • v.49 no.6
    • /
    • pp.25-34
    • /
    • 2012
  • New calibration method for the near-field scanning (NFS) system is presented. The proposed calibration method consisted of a new near-field antenna (NFP) and newly devised patterns as circular patch patterns (CPPs) and meander patterns (MPs). The proposed patterns were used for improving spatial resolutions and simplifying a calibration procedure of the NFP compared to the conventional method defined in the IEC61967-3 and 6. Also, the effect of the length of NFPs on attenuation characteristics was investigated with length of 8mm and 30mm. For them, we designed and fabricated CPPs of diameter (D) = 20, 40, 60, and 100mm and MPs of various widths and spaces. We found the reverse relations between spatial resolutions and heights of measuring points by using simplified calibration procedure. The testing result shows that the spatial resolution of $120{\mu}m$ at height of $200{\mu}m$ was verified without complex correlation algorithms under 8GHz. For manufacturing cost all patterns and the NFP were realized with low-cost fabrication using PCB (FR-4) not by a conventional LTCC process. For verification of chip-level EMC from the results, near-field scanning system (NFSS) having step resolution of Sub-micron scale was produced and by using the proposed NFSS and proposed NFP measurement of chip shows accurately the shape of the resolution of $200{\mu}m$ patterns for securing a high level of chip-level EMC verification.

Evaluation on the impact of Lowest Bid Contracts on Site Operations in times of Severe Economic Downturn (건설경기 침체기의 최저가 낙찰제 건설현장의 운영 실태분석과 개선 방안 도출)

  • Koo, Bon-Sang;Jang, Hyoun-Seung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.6
    • /
    • pp.146-153
    • /
    • 2009
  • The year 2008 was a hard year for Korea's construction companies. The real estate downturn resulted in halting new construction and stopping existing work, and inflation of global oil prices caused price hikes in rebar and concrete materials. As a solution to reducing the budget, the newly appointed government announced plans to increase low cost bid contracts from 10 billion to 30 billion won. When such economical and political factors negatively impact the construction market, projects based on low cost contracts are the hardest hit. Many problems already inherent in low cost bid contracts become accentuated. Consequently, this provides an opportune time to actually study and analyze the issues in these projects. This paper introduces the findings made from investigating four projects struggling to make ends meet in the year 2008. Results show that flow of cash (i.e., liquidity), or lack thereof, was the root cause which in turn was hampered by failed mechanisms for design changes, material inflation. Attributing cash flow risk to the bottom of the production structure (i.e., small business subcontractors) was also a problem within the industry. Contractors need a better way to prepare against material price fluctuations, and owners need to assist in expediting payment during times of extreme downturn.

Need to Reduce Industrial Accidents through the Introduction of an Prevailing Wage System (적정임금제 도입을 통한 산업재해 감축 필요성 고찰)

  • Choonhwan Cho;Yeoncheol Shin;Kyung-Bo Han
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.1
    • /
    • pp.1-9
    • /
    • 2023
  • In order to carry out construction work, it is urgent to introduce a proper wage system so that the cost burden of projects that have been won due to bleeding competition among original government buildings based on low-priced bids can be transferred to subcontractors. Purpose: Construction with illegal multi-level industrial structure needs to improve the wage reduction environment leading to order (100%) → original contractor (80%) → subcontractor (65%) → load contractor (65%) and aims to ensure wages for end workers. Method: Investigate the current status of labor cost appropriate payment plan in the construction industry, and investigate the case of the appropriate wage system (P.W) in the United States. In addition, the effect and direction of the appropriate wage system are presented. Result: Individual minimum wage security was also mentioned in the Constitution, and many researchers suggested that only the introduction of an appropriate wage system could solve the problem of reducing worker labor and ensure quality and safety. Conclusion: The proper wage system in the construction industry will block illegal multi-level and illegal foreign work, improve the labor environment in the construction market, create an influx of young workers, and have a significant impact on the construction industry's competitive structure, safety, and quality.

Comparative Evaluation of Concrete Compressive Strength According to the Type of Apartment Building Finishing Materials Using Nondestructive Testing (비파괴검사법을 이용한 공동주택 마감재 종류에 따른 콘크리트 압축강도 비교평가)

  • Seong-Uk Hong
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.28 no.1
    • /
    • pp.32-38
    • /
    • 2024
  • In the case of apartment building, it is difficult to conduct non-destructive testing due to the actual presence of people and the dust and noise generated during the core test, so inspections are performed each time in the common area and underground parking lot, and the tests are conducted on the finishing material rather than on the concrete surface due to low-cost orders. As the process progresses, poor inspection is inevitable. In addition, the proposed formulas for strength estimation have large fluctuations depending on the differences in test conditions and environments, and even if they show the same measured value, the deviation between each proposed formula is large, making it difficult to accurately estimate strength, making it difficult to use. Accordingly, we would like to select finishing materials mainly used in apartment complexes and compare and evaluate the compressive strength of concrete according to the type of finishing material by using non-destructive testing methods directly on the finishing materials without removing the finishing materials. The reliability evaluation results of the estimated compressive strength of concrete using the ultrasonic velocity method according to the type of finishing material are as follows. The error rate between the estimated compressive strength and compressive strength derived through the ultrasonic velocity method shows a wide range of variation, ranging from 21.83% to 58.89%. The effect of the presence or absence of finishing materials on the estimated compressive strength was found to be insignificant. Accordingly, it is necessary to select more types of finishing materials and study ultrasonic velocity methods according to the presence or absence of finishing materials, and to study estimation techniques that can increase reliability.

Developing a Project and Program Management Capability Assessment System for the Korean Construction Management Firms (국내 CM 기업의 프로젝트 및 프로그램 관리역량 평가를 위한 자가 역량 평가 시스템 개발)

  • Choi, Jaehyun;Son, Jaeho;Kim, Jihye
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.1
    • /
    • pp.3-14
    • /
    • 2015
  • Since the global financial crisis, the Korean domestic construction market has continuously experienced downturns, and the Korean domain construction firms'profitability has been persistently deteriorated. Domestic construction firms have rapidly advanced to overseas markets exclusively for the construction contract packages. However, the profitability for the construction contracts has been lower compared to engineering or project management contracts. One of the critical issues the Korean firms have faced was project management capability across all phases in project execution. Even though several project management capability assessment tools were introduced, most tools were applicable to a wide variety of industry sectors rather than construction industry. Project management capability assessment tool specifically applicable to domestic CM firms was developed through this research, in order to assess project and program management capabilities and improve the competitiveness in overseas market Also, the correlation between project, programs, and the CM infrastructure were identified. The CM firms were divided into two groups according to the size of the business, and both were evaluated at the project and the program level based for the 9 different criteria. The project management capability assessment tool developed for the CM firms can be used for self-assessment to distinguish the strengths and weaknesses of each company at the project and program level. In addition, the current status of each group can be identified by spotting improvement areas for the management capabilities.