• Title/Summary/Keyword: 재난방재 시스템

Search Result 262, Processing Time 0.016 seconds

A Proposal for Simplified Velocity Estimation for Practical Applicability (실무 적용성이 용이한 간편 유속 산정식 제안)

  • Tai-Ho Choo;Jong-Cheol Seo; Hyeon-Gu Choi;Kun-Hak Chun
    • Journal of Wetlands Research
    • /
    • v.25 no.2
    • /
    • pp.75-82
    • /
    • 2023
  • Data for measuring the flow rate of streams are used as important basic data for the development and maintenance of water resources, and many experts are conducting research to make more accurate measurements. Especially, in Korea, monsoon rains and heavy rains are concentrated in summer due to the nature of the climate, so floods occur frequently. Therefore, it is necessary to measure the flow rate most accurately during a flood to predict and prevent flooding. Thus, the U.S. Geological Survey (USGS) introduces 1, 2, 3 point method using a flow meter as one way to measure the average flow rate. However, it is difficult to calculate the average flow rate with the existing 1, 2, 3 point method alone.This paper proposes a new 1, 2, 3 point method formula, which is more accurate, utilizing one probabilistic entropy concept. This is considered to be a highly empirical study that can supplement the limitations of existing measurement methods. Data and Flume data were used in the number of holesman to demonstrate the utility of the proposed formula. As a result of the analysis, in the case of Flume Data, the existing USGS 1 point method compared to the measured value was 7.6% on average, 8.6% on the 2 point method, and 8.1% on the 3 point method. In the case of Coleman Data, the 1 point method showed an average error rate of 5%, the 2 point method 5.6% and the 3 point method 5.3%. On the other hand, the proposed formula using the concept of entropy reduced the error rate by about 60% compared to the existing method, with the Flume Data averaging 4.7% for the 1 point method, 5.7% for the 2 point method, and 5.2% for the 3 point method. In addition, Coleman Data showed an average error of 2.5% in the 1 point method, 3.1% in the 2 point method, and 2.8% in the 3 point method, reducing the error rate by about 50% compared to the existing method.This study can calculate the average flow rate more accurately than the existing 1, 2, 3 point method, which can be useful in many ways, including future river disaster management, design and administration.

A Study on Comparative Analysis of Socio-economic Impact Assessment Methods on Climate Change and Necessity of Application for Water Management (기후변화 대응을 위한 발전소 온배수 활용 양식업 경제성 분석)

  • Lee, Sangsin;Kim, Shang Moon;Um, Gi Jeung
    • Journal of Korean Society of societal Security
    • /
    • v.4 no.2
    • /
    • pp.73-78
    • /
    • 2011
  • In order to resolve the problem of change in global climate which is worsening as days go by and to preemptively cope with strengthened restriction on carbon emission, the government enacted 'Framework Act on Low Carbon Green Growth' in 2010 and selected green technology and green industry as new national growth engines. For this reason, the necessity to use the un-utilized waste heat across the whole industrial system has become an issue, and studies on and applications of recycling in the agricultural and fishery fields such as cultivation of tropical crops and flatfishes by utilizing the waste heat and thermal effluent generated by large industrial complexes including power plants are being actively carried out. In this study, we looked into the domestic and overseas examples of having utilized waste heat abandoned in the form of power plant thermal effluent, and carried out economic efficiency evaluation of sturgeon aquaculture utilizing thermal effluent of Yeongwol LNG Combined Cycle Power Plant in Gangwon-do. In this analysis, we analyzed the economic efficiency of a model business plan divided into three steps, starting from a small scale in order to minimize the investment risk and financial burden, which is then gradually expanded. The business operation period was assumed to be 10 years (2012~2021), and the NVP (Net Present Value) and economic efficiency (B/C) for the operation period (10 years) were estimated for different loan size by dividing the size of external loan by stage into 80% and 40% based on the basic statistics secured through a site survey. Through the result of analysis, we can see that reducing the size of the external loan is an important factor in securing greater economic efficiency as, while the B/C is 1.79 in the case the external loan is 80% of the total investment, it is presumed to be improved to 1.81 when the loan is 40%. As the findings of this study showed that the economic efficiency of sturgeon aquaculture utilizing thermal effluent of power plant can be secured, it is presumed that regional development project items with high added value can be derived though this, and, in addition, this study will greatly contribute to reinforcement of the capability of local governments to cope with climate change.

  • PDF