• Title/Summary/Keyword: 재굴착

Search Result 231, Processing Time 0.027 seconds

Three-Dimensional Finite Element Analysis of Tieback Walls in Sand

  • Lim, Yu-Jin;Briaud, Jean-Louis
    • Geotechnical Engineering
    • /
    • v.13 no.3
    • /
    • pp.33-52
    • /
    • 1997
  • A three dimensional nonlinear finite element analysis is used to study the influence of various design decisions for tieback walls. The numerical model simulates the soldier piles and the tendon bonded length of the anchors with beam elements, the unbonded tendon with a spring element, the wood lagging with the shell elements, and the soil with solid 3D nonlinear elements. The soil model used is a modified hyperbolic model with unloading hysteresis. The complete sequence of construction is simulated including the excavation, and the placement and stressing of the anchors. The numerical model is calibrated against a full scale instrumented tieback wall at the National Geotechnical Experimentation Site (NGES) on the Riverside Campus of Texas A&M University. Then a parametric study is conducted. The results give information on the influence of the following factors on the wall behavior : location of the first anchor, length of the tendon unbonded zone, magnitude of the anchor forces, embedment of the soldier piles, stiffness of the wood lagging, and of the piles. The implications in design are discussed.

  • PDF

Effect of orientation of fracture zone on tunnel behavior - Numerical Investigation (파쇄대의 공간적 분포가 터널 거동에 미치는 영향 - 수치해석 연구)

  • Yoo, Chung-Sik;Cho, Yoon-Gyu;Park, Jung-Gyu
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.15 no.3
    • /
    • pp.253-270
    • /
    • 2013
  • This paper concerns the effect of orientation and geometric characteristics of a fracture zone on the tunnel behavior using a numerical investigation. A parametric study was executed on a number of drill and blast tunnelling cases representing different fracture and tunnelling conditions using two and three dimensional finite element analyses. The variables considered include the strike and dip angle of fracture zone relative to the longitudinal tunnel axis, the width and the clearance of the fracture zone, the tunnel depth, and the initial lateral stress coefficient. The results of the analyses were examined in terms of the tunnel deformation including crown settlement, convergence, and invert heave as well as shotcrete lining stresses. The results indicate that the tunnel deformation as well as the shotcrete lining stress are strongly influenced by the orientation of the fracture zone, and that such a trend becomes more pronounced for tunnels with greater depths.

A Experimental Study on the Determination of Construction method of Controled Low-strength Material Accelerated Flow Ability Using Surplus Soil for Underground Power Line (지중송전관로용 급결 유동성 뒤채움재의 시공법 설정에 관한 실험적 연구)

  • Oh, Gi-Dae;Kim, Dae Hong
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.5 no.3
    • /
    • pp.84-93
    • /
    • 2010
  • Compaction of backfill material of Underground power lines is difficult, especially under pipeline. so it could cause structural problem because of low compaction efficiency. So various methods have been taken to solve the problem and one of them is CLSM(Controled low-strength material accelerated flow ability). But In other countries, these are already in progress for a long time to research and development and recently on practical steps. But, in our country, study for only general structures, not for underground power line structure that is being constructed at night rapidly. In this study, we performed property tests and indoor & outdoor test (3 cases). The tests showed flow ability reached at the limit construction(160 mm) flowability by 9 to 15 minute after starting to mix, and construction buoyant is lowering after placing CLSM by 70 % of theoretical buoyant that is calculated by unit weight of material. In this paper, we performed indoor tests and outdoor tests to estimate mechanical properties and to suggest construction method(using batch plant, setting spacer at 1.8 m and placing at 2m) for CLSM that using surplus soil. And the test showed good results for construction quality, workability and structure safety.

  • PDF

Application of Holden Swellex Bolt for the Design of Long, and Large Profile Traffic Tunnels (대단면 장대터널에서의 Swellex Bolt의 설계적용)

  • 지왕률;이호성;정해성
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 2001.10a
    • /
    • pp.25-36
    • /
    • 2001
  • 록볼트의 작용효과는 지반이 굴착되어 안정화되는 초기 1달간이 가장 중요하고 품질관리 문제는 지반조건에 따라 부식에 대한 문제가 있으나, 기존의 전면접착형 록볼트의 경우도 작업여건상 그 확실성은 떨어지는 것이 현실이다. 또한 작업이 시간소모가 크고, 볼트의 지지효과도 충진재가 고결되어야 발효되는 약점을 갖고 있어, 일본, 말레이시아, 유럽 등에서 전면 마찰형 즉시 지보기능이 가능한 Swellex Bolt를 영구지보재로 사용하고 있는 경향이 있다. 기존의 전면 접착형 SN Bolt(이형철근)로써 Grouting 몰탈볼트와 Cem Bolt로 설계된 장대·대단면 도로터널 지보재를 현대식 Swellex Bolt로 대체 설계변경이 가능한 것인지에 대하여 볼트의 지지력 시험(Pullout Test), 볼트재질의 내구성 연구 및 설계변경에 따른 수치해석 등을 실시하여, 볼트로써 지지력을 확인하고, 재질의 안전성을 조사한 후 시공 사이클 타임을 줄이며, 견고하고 시공성이 우수한 Swellex Bolt로의 설계변경을 제안하게 되었다.

  • PDF

Numerical estimation for safety factors of tunnels considering the failure of supports (지보재 파괴를 고려한 터널 안전율의 수치해석적 산정 연구)

  • You, Kwang-Ho;Park, Yeon-Jun;Hong, Keun-Young;Lee, Hyun-Koo;Kim, Jea-Kwon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.7 no.1
    • /
    • pp.37-49
    • /
    • 2005
  • In a tunnel, failure of its supports can cause failure of the tunnel. Therefore it is important to estimate safety factor of the tunnel which the failure of its supports is taken into account. In previous studies, supports of tunnels were usually modelled as beam elements. The failure of the supports was decided by comparing the allowable stress and the calculated bending stresses inside the beam elements in estimating safety factor of the tunnel considering the failure of its supports. In this study, it is suggested how to model the supports properly. To this end, supports of a tunnel were modelled by both beam (elastic) elements and continuum (elasto-plastic) elements in two dimensional numerical analyses. Meanwhile, it was analyzed how rock mass class, coefficient of lateral pressure, shotcrete thickness, the existence of rock bolt, and excavation method had an effect on the safety factor of a tunnel.

  • PDF

An Experimental Study on Load Bearing Capacity of Lattice Girder as a Steel Support in Tunnelling (터널 지보재로서 격자지보의 하중지지력에 관한 실험적 연구)

  • 유충식;배규진
    • Geotechnical Engineering
    • /
    • v.13 no.4
    • /
    • pp.163-176
    • /
    • 1997
  • It has long been recognized that the H-beam steel rib has many shortcomings when used as a steel support in tunneling. One of the major shortcomings is the shotcrete shadow created behind H-beam flange which eventually reduces the load bearing capacity of shotcrete shell. In many European countries, plate girder as the H-beam steel rib has been replaced by lattice girder which has many advantages over the H-beam steel rib. Successful application of the lattice girder as a steel support requires a thorough investigation on the load bearing capacity of the lattice girder. Therefore, laboratory bending and compression tests were conducted on lattice girders with the aim of investigating the load bearing capacity of the lattice girders. The results of tests show that the load bearing capacity of laIn twice girders is higher than that of H-beams, which indicates that the lattice girder can be effectively used as a support in tunneling.

  • PDF

Evaluation on Reinforcing Effect of Inclined System Bolting by Model Tests and Numerical Analysis (모형시험 및 수치해석을 통한 경사 시스템 록볼트의 보강효과 분석)

  • Lee, Jea-Dug;Kim, Byoung-Il;Yoo, Wan-Kyu;Han, Jin-Tae
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.4
    • /
    • pp.1529-1539
    • /
    • 2013
  • Recent case studies in Japan have shown that rockbolts are commonly installed at an oblique angle to the excavation direction of the tunnel, instead of at a right angle, due to restriction of the working space. In particular, in the case of expansion in an existing tunnel, the working space can be very small, due to the large protective structures necessary to operate within an existing tunnel. In this case, where both the current use of the existing tunnel, and the reinforcement of the ground around the tunnel are required, the effects of installation angles and patterns of rockbolts are important factors in the design process. Therefore, in this study, a total number of 24 model tests are performed, to investigate the reinforcing effects of system bolting installed obliquely from the excavation direction of the tunnel, by changing the installation angle of bolts, longitudinal distance, and bonded length of bolts. The model test results indicate that the relaxed load ratio decreases, with the increase of both the bonded lengths and the number of the installed bolts, resulting in the decrease of the supported area by one bolt. Two-dimensional numerical analysis, which considered the reinforcement effect of inclined system bolting as the change of engineering properties near the tunnel, demonstrated that the deflection patterns at the tunnel crown in the numerical simulations, show a similar tendency to those measured in the model tests.

A study on the characteristics of tunnel deformation and support system according to tunnel portal reinforcement method (터널 갱구부 보강방법에 따른 터널 변형 및 지보재 응력특성에 관한 연구)

  • Moon, Kyoung-Sun;Seo, Yoon-Sic;Kang, Si-On;Kim, Sang-Hwan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.3
    • /
    • pp.625-639
    • /
    • 2018
  • This study is about the reinforcing type of reinforcement method which is reinforced in tunnel portal of tunnel with bad ground condition. Generally, it is known that the horizontal reinforcement method is more effective than the conventional reinforcement method. However, as a limitation of the tunnel construction technology, it is being constructed by the superposition reinforcement method. In recent years, high-strength large-diameter steel pipes and horizontally oriented longitudes (L = 30.0~50.0 m) construction technology have been developed. Therefore, it is required to study reinforcement method of tunnel portal reinforcement method. Therefore, 3-D numerical analysis (Midas GTS NX 3D) was performed by setting the reinforcement method (No reinforcement type, overlap reinforcement type and horizontal reinforcement type) and ground condition as parameters. As a result, it was considered that the reinforcement effect was the largest as the horizontal reinforcement type of the reinforcement method was the smallest in the displacement and the support material stress. Based on the results of the numerical analysis, horizontal steel pipe grouting was applied to the actual tunnel site. The displacement of the tunnel portal and the stress of the support material occurred within the allowable values and were considered to ensure sufficient stability.

Applicability of Solidified Soil as a Filling Materials of Bored Pile (매입말뚝 충전재로서 고화토의 적용성)

  • Kim, Khi-Woong;Chai, Jong-Gil;Han, Byung-Kwon
    • Journal of the Korean Geosynthetics Society
    • /
    • v.11 no.3
    • /
    • pp.37-42
    • /
    • 2012
  • The cement paste is mostly used as the filling materials of bored pile in Korea. The use of filling material based on cement paste is inefficient at field construction because it needs a lot of the charging mass. In addition, it has environmental problem according to the large amount of cement use because its strength is also larger than criterion. The excavated soil with stabilizer can be used as the filling materials when the bored pile is constructed. Therefore, this paper describes field application of solidified soil for economical efficiency and environment-friendly. The injection capacity of solidified soil is compared with cement paste's based on unconfined compressive strength test and field load test, and the appropriate of test results is evaluated by design criterion. The evaluation result shows that the capacity of excavated soil with stabilizer is similar to cement paste and the solidified soil is able to apply as filling materials of bored pile because it is satisfied with design criterion.

Evaluation of waterproof and durability of hydrophilic waterstop (수팽창 지수재의 방수 성능 및 내구성 평가)

  • Choi, Woo-Yong;Lee, Hyeun-Pil;Jun, Gy-Chan;Lee, Seok-Won
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.16 no.2
    • /
    • pp.117-124
    • /
    • 2014
  • The interest in the use of shield TBM (Tunnel Boring Machine) on the tunnel excavation has been increased rapidly in Korea. The shield TBM tunnel is generally designed as non-drainage tunnel. Consequently, if water leakage through the segment joints happens, big problems on the usage and stability of tunnel can be occurred. In this study, the variation of waterproof capacity of hydrophilic waterstop by the construction error and excessive displacement of segment was studied firstly. Secondly, the decrease of durability of hydrophilic waterstop by the sulphate and chloride contained in the groundwater and seawater was investigated. The results showed that if the angle discordance at the segment joints is beyond the 2 degree, the proper waterproof capacity of hydrophilic waterstop can not be guaranteed. In addition, if the hydrophilic rubber waterstop is exposed to the sulphate for a while, the proper durability of hydrophilic waterstop can not be expected.