• Title/Summary/Keyword: 재건축 초과이익 환수에 관한 법률

Search Result 1, Processing Time 0.015 seconds

A Study on the Evaluation Criteria for Reconstruction Charge Allocation (재건축부담금 배분을 위한 지자체 평가기준 연구)

  • Kim, Joo-Jin;Song, Young-Hyun
    • Land and Housing Review
    • /
    • v.2 no.1
    • /
    • pp.35-46
    • /
    • 2011
  • This paper aims at examining the indices and their weights for the evaluation of local government to allocate reconstruction charge and reviewing the availability of them simulating local governments' evaluation. There has been no specific evaluation criteria existed, while central government has to allocate the reconstruction charge to local governments by the provision 3 of Restitution of Housing Reconstruction Gains Act. The results as follows : According to a survey on evaluation indices weight and AHP analysis, the weight of 'the housing welfare improve effort' is the highest with 25.1% among 5 upper-classification indices. Following this, each weight of 'housing welfare conditions(22.7%)', 'housing SOC establishment(22.5%)', 'the achievement and planning on reconstruction charge use(15.8%)', and 'housing sector achievement such as Bogeumjari(13.9%)' are ranked. Meanwhile, Among 16 lower-classification indices, 'the rate of minimum housing standard households(11.5%)', 'public rental housing supply(8.9%)', 'reconstruction charge use achievement(8.3%)', 'reconstruction charge use planning submit(7.5%)', and 'rate of water and sewage(6.3%)' hold high rank. The analysis results show the weight of 'housing sector achievement such as Bogeumjari' on the existing provisions should be decreased(30%${\rightarrow}$13.9%) as others' weight has to be slightly increased. According to the result of the simulation, Jeonbuk, Gyeongbuk, Jeonnam, Jeju, Gyeonggi received higher scores in the comprehensive evaluation, while Daejeon, Seoul, Incheon, Daegu and Gwangju, where the housing conditions are relatively good, received lower scores. These results of the analysis correspond with the direction of reconstruction charges allocation and indicate that the evaluation criteria used in this simulation is acceptable.