• Title/Summary/Keyword: 장비가동률

Search Result 42, Processing Time 0.028 seconds

A Study on ROK Military PBL Using Simulation and Meta Model (시뮬레이션과 메타 모델을 이용한 한국군 성과기반군수 연구)

  • Won, Bong Yeon;Lee, Sang Jin
    • Journal of the Korea Society for Simulation
    • /
    • v.28 no.1
    • /
    • pp.81-91
    • /
    • 2019
  • The ROK military uses Performance Based Logistics(PBL) as one of the ways to utilize civilian resources and advanced techniques. However, the Korean PBL is mainly focused on purchasing and repairing parts, which is not contributing to the improvement of the availability of overall system. The objective of this study is to suggest the methodology to evaluate the PBL metrics using the simulation and meta model. A meta model is a regression model to analyze the effect of the PBL through simulating various scenarios with performance metrics. As a result, if the PBL is limited to the part level, the performance has little influence on the availability of overall system. In addition, analysis using the meta model shows that it cannot achieve the performance targets when the same metrics are applied to various items without considering the characteristics of the applied items. Therefore, in order to improve availability, PBL coverage should be extended to a system level that includes key components that have a large impact on availability. If multiple items are included in the PBL coverage, the metrics should be applied differently, taking into account the characteristics of each item.

A Case Study on the Cost Effectiveness Analysis of Depot Maintenance Using Simulation Model and Experimental Design (시뮬레이션 모형과 실험설계법을 활용한 창정비 비용대 효과 분석 사례)

  • Kim, Sung-Kon;Lee, Sang-Jin
    • Journal of the Korea Society for Simulation
    • /
    • v.26 no.3
    • /
    • pp.23-34
    • /
    • 2017
  • This paper is to study the simulation model of depot maintenance system that analyzes logistics supportability such as component availability and cost of target equipment. A depot maintenance system could repair or maintain multiple components simultaneously. The key performance indicators of this system are component availability, repair cycle time, and maintenance cost. The simulation model is based on the engine maintenance process of army aviation depot. This study combines the NOLH(Nearly Orthogonal Latin Hypercube) experimental design method, to composes 33 scenarios, with a multiple regression analysis to find out major factors that influence on key performance indicators. This study is significant in providing a cost-effectiveness analysis on depot maintenance system that is capable of maintaining multiple components at the same time.

Method for determining the optimal number of concurrent spare parts under available budget constraint (예산제약 하에서의 동시조달수리부속의 적정소요 산출)

  • 김영호;전치혁
    • Proceedings of the Korean Reliability Society Conference
    • /
    • 2000.11a
    • /
    • pp.321-328
    • /
    • 2000
  • 본 연구는 새로운 장비체계 도입 시 초기 일정기간 동안 장비의 목표가용도 유지를 위해 필요한 동시조달수리부속(Concurrent Spare Parts)와 적정소요 산출에 관한 해법을 제시한다. 새로운 장비체계 도입 시 함께 보급되는 예비수리부속은 장비체계 운용에 중요한 역할을 한다. 따라서 장비체계가 주어진 임무를 수행하는 동시에 정상상태를 유지하기 위한 적정수준의 예비부속 확보가 필요하며 최소의 비용으로 장비의 가동률을 극대화 할 수 있도록 하여야 한다. 본 연구에서는 부품의 고장특성 및 수리능력을 고려한 고장분포함수를 바탕으로 각 부속별 중요도를 만족시키는 초기 수리부속 소요 결정모형과 해 산정기법을 제시하며 가용예산 제약에 따른 소요조정을 통해 최적의 예비부속 재고수준을 결정한다.

  • PDF

A Study on the Reliable Maintenance Method for Electronic Circuit Card (전자 회로카드의 신뢰성 있는 정비 방안 연구)

  • Kim, Jong-Woo
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2014.04a
    • /
    • pp.28-30
    • /
    • 2014
  • 현대 전자기술의 급격한 발전은 첨단 과학기술 발전에 이바지하였다. 회로카드 수십 개가 하는 역할을 IC하나로 대신하였으며 이로 인하여 전자장비의 크기는 점점 작아지고 있다. 그렇지만, 급격한 전자기술의 발전은 오래된 장비를 운용하는 곳에서는 오히려 문제점으로 발생하고 있다. 장비제작사는 기술발전에 의해 기존 제품의 대체품 없이 생산 중단함에 따라 이로 인하여 장비관리에 문제점이 발생되었고, 이는 곧 장비 가동률에 영향을 미치게 된다. 그렇기 때문에 노후 장비를 운용하는 곳에서는 자체적으로 대체 수리원 확보 또는 정비능력을 확보하여야 할 수 밖에 없다. 따라서, 본 논문에서는 전자 회로카드의 신뢰성 있는 정비 방안을 제시하고자 한다.

Improving Road Construction Productivity by Developing a Programmatic Resource Distribution System for Equipment Sharing in Multi-sectioned Road Construction Projects (다(多)공구 도로 건설 현장의 장비 공유시스템 구축을 통한 생산성 향상에 관한 연구)

  • Koo, Bonsang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.134-145
    • /
    • 2013
  • Road construction projects are parcelled into sub-sections which are then tendered to individual contractors for construction. The type of work and equipments used are similar for each sub-section. However, such equipment are not shared on a regular basis among the contractors and only partially performed in an informal and ad hoc manner. Consequently, road construction equipment suffer from low utilization and increased leasing costs. Lean construction and Program Management approaches stress the importance of collaboration among individual participants in a way that increases the collective cost savings of the entire project. This research attempts to apply such theories with the notion that under utilization of expensive equipment can be improved by formalizing a way to enable the sharing of equipment in large, public sponsored, multi-sectioned road construction projects. A system was developed consisting of a set of criteria and processes that enables automatic allocation of equipment to multiple sites on daily basis, in a way that minimizes equipment costs and improves their individual utility. The system was then applied in allocating three different types of equipment to an actual road construction project with four sub-sections for three months. A new metric, nDPR showed that utilization improved for all equipment and also equipment related costs were decreased by 4.45%. Results also showed that increased shared opportunities of equipment correspond to an increase in utilization and cost savings.

The estimation of the number of spare parts & the changing time about DSRC Road Side Equipment (단거리전용통신방식 노변기지국의 예비부품수 및 교체시기 산정)

  • Han, Dae-Hui;Lee, Cheong-Won
    • 한국ITS학회:학술대회논문집
    • /
    • v.2007 no.10
    • /
    • pp.196-201
    • /
    • 2007
  • 현재 국내 ITS는 현장장비 유지관리에 대한 연구 및 고장관련 DB가 부족하여 예비부품수 및 교체시기 산정에 대한 규정이 없는 실정이다. 이에 본 연구는 실제 고장이력자료를 갖고 신뢰성 분석을 실시하여 단거리전용통신(DSRC)방식 노변기지국(RSE)의 예비부품수 및 교체시기를 산정하였다. 전체 수집기간동안의 고장자료는 욕조곡선의 형상을 나타내어 우발고장기간의 자료로 신뢰성 분석을 실시하였으나 고장 수명 분포 중 적합되는 분포가 없었다. 따라서, i)장비가동률과 ii)경험적(empirical) 누적분포함수(CDF) 곡선을 이용한 장비의 고장률(건/일)을 감안하여 예비부품수를 산정한 결과 16.22개 이상의 노변기지국(완제품)을 확보하여야 하는 것으로 분석되었다. 하자보수기간(2년)이 지난후 일정기간($2{\sim}3$년)이 지난 시점에서 향후 10년간에 대하여 수리하면서 사용하는 경우와 신품구입시의 총비용을 비교하여 산정한 교체시기는 10.67건/40개월 이상이다. 본 연구 수행결과 첫째, 비모수적 방법으로 적합도 검정을 실시하지 못하였다는 한계와, 둘째, 초기에 고장이 많이 발생하는 장비는 향후에도 고장이 많이 발생한다는 가정에 기반하여 향후 10년의 운영비용을 분석하였으나 이러한 가정을 입증하지는 못하였다. 따라서, 향후엔 본 연구에 사용된 자료가 고장 수명분포도 적합 되지 않은 원인을 분석하는 것과 분석대상 기간 이후의 자료를 추가하여 적합도 검정 및 신뢰성 분석을 실시하는 것이 필요하다.

  • PDF

Korea Militaries's none-bid Products Analysis and future Policy Research (한국군 군수품 무응찰 문제 분석 및 정책에 관한 연구)

  • Paik, Won-Chul;Shin, Seung-Jung
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.19 no.2
    • /
    • pp.193-201
    • /
    • 2019
  • The purpose of this study is to investigate the internal and extrnal factors of procurement of non-bid parts in the overseas militaries products for commercial purchase after deploy at Militaries. How we will continures to support of Primary of delivery to end users for all systems for maintenance support equipment products of Korean militaries. the purpose of this study is to propose a development direction for solving hard to find parts and non-bid products problem due to non-response of overseas repair parts suppliers.

The Estimation Method of Equipment Maintenance Cost (장비유지비 소요 예측 기법 연구)

  • Kim, Jeong-Ki
    • Journal of the military operations research society of Korea
    • /
    • v.34 no.3
    • /
    • pp.41-51
    • /
    • 2008
  • Advanced high-tech weapons have enormous affect on combat strength in modern warfare. However, lack of maintenance can cause decrease in equipment operating rate as well as decrease in expectation on demonstrative effect of combat strength during wartime. Therefore it is essential for combat readiness that the optimum requirement of equipment maintenance cost are forecasted and included in the budget. In this paper, the trend of equipment maintenance cost about K-111 1/4t military vehicle is first analyzed by evaluating the performance data of field operation. Secondly, based on above analyzed results, the forecasting model of equipment maintenance cost is designed. Finally, by applying this forecasting model, suggestion and estimation method of equipment maintenance cost have presented for the foreseeable future.

Design of Software Architecture for Integrating Messages of SECS-II and OPC (SECS-II와 OPC의 메시지 통합을 위한 소프트웨어 구조 설계)

  • Lim, Yong-Muk;Han, Jong-Sub;Kwark, Woo-Young;Kim, Woo-Sung
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2008.05a
    • /
    • pp.675-678
    • /
    • 2008
  • 최근 반도체 장비는 충분한 네트워크 성능과 유지 관리 기능을 자체적으로 내장하고 있으며, 자동화 네트워크 구성을 위한 통신규약 및 메시지로 SECS-I, SECS--II, HSMS와 PLC장비의 OPC등이 있다. 하지만 각 통신규약 및 메시지 형태가 상이하여 통합 관리 및 모니터링이 어려운 실정에 있다. 따라서 본 논문에서는 반도체 산업장비의 다양한 통신규약중 사용도가 높은 SECS-II와 OPC에서 메시지를 추출하고 통합된 메시지를 작성하기 위한 방법 및 소프트웨어 구조를 제시한다. 이러한 시스템을 통해서 생산 효율 및 가동률을 높이고, 고장 진단/장애요소 제거 등 산업 현장에서 발생할 수 있는 문제점을 개선 할 수 있는 기반 기술을 마련한다.

The analysis on the operation condition and premium proportion for estimating the appropriate capacity of Cooling Equipment - Public office- (열원장비의 적정용량산정을 위한 장비가동현황 및 할증률 분석 - 공공업무시설 -)

  • Shin, Mu-Kyung;Park, Sung-Hun;Park, Eun-Ha;Jang, Jong-Woon;Lee, Ji-Won;Kim, Se-Hwan
    • Proceedings of the SAREK Conference
    • /
    • 2006.06a
    • /
    • pp.506-511
    • /
    • 2006
  • To today with the acceleration due to the preference actual condition of high-class energy national income level it is together improving. It follows hereupon and it is convenient and the neat heat source is increasing a tendency where it is. It investigates the government offices building in commerce portion from the research which it sees and from the draft it analyzes a coat dosage. And comparison it analyzes the movable present condition of thread use dosage and the freezer. It presents the improvement direction against enemy conditions heat source equipment selecting. Also, currently it produces the dosage of heat source equipment and application it tries. The result, the various safety rate and the premium rate which it uses universally are considered above thread using. The reappraisal for enemy conditions heat source equipment selecting which it follows hereupon is necessary.

  • PDF