• Title/Summary/Keyword: 장대레일궤도

Search Result 57, Processing Time 0.028 seconds

Structural Analysis and Design of the H-typed Railway Tie (H형 침목의 구조해석 및 설계)

  • Kim, Hae-Gon;Bae, Hyun-Ung;Lee, Chin-Ok;Lim, Nam-Hyoung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.9
    • /
    • pp.4532-4541
    • /
    • 2013
  • With speed up of railway, the demand for safety of the railroad transportation is on the increase in Korea's conventional railways. In additions, freight trains with heavier axle load are required to run conventional railways. In order to solve these requirements, the increase of rail weight and the application of long rail system have been underway in conventional railways. However, the research on ties that is absolutely influencing the track stiffness in ballasted tracks has not been much progress. In this paper, the new H-typed tie is developed to increase the track stiffness and reduce the track irregularity. And from the structural analysis by FE program, the intial design drawing of the new H-typed tie is proposed.

The Effect and Countermeasures of the Vertical Track Settlement Caused by Expand and Contract Behavior of the High-Speed Railway Bridge Girder (고속철도 교량 바닥판의 온도신축작용이 궤도처짐에 미치는 영향과 대책에 관한 연구)

  • Kang, Kee Dong
    • Journal of Korean Society of Steel Construction
    • /
    • v.17 no.6 s.79
    • /
    • pp.673-679
    • /
    • 2005
  • According to continuous welded rails on a bridge, temperature changes bring about the expansion of the bridge deck,adding axial forces on the track. Moreover, the ballast on the bridge deck expansion joint is moved due to the bridge deck. The longer the bridge deck is, the greater the influence will be, loosening the ballast, causing track irregularities, and deteriorating passenger comfort. Considering the structure of the bridge itself and tolerance for track irregularities caused by the loosened ballast on the bridge, the maximum length of the deck should be less than 80 m, which is the same as the standard of French railways. In this study, the interaction between the expansion related to the bridge length and the irregularity in the longitudinal level, referring to measurements and maintenance work performed in high-speed railways, was analyzed. This research shows that the installation of a sliding plate or a vertical ballast stopper is not a good option, since it is difficult. On the other hand, the installation of a ZLR fastener or gluing is easy, but its influence is insignificant. In conclusion, switch tie tamping or manual tamping is more effective than other methods of what?

Experimental Study of Low-Frictional Behavior for Sliding Slab Track (슬라이딩 궤도의 저마찰 거동에 대한 실험적 연구)

  • Kim, Tae-Gu;Jung, Dong-Ki;Lee, Kyoung-Chan
    • Journal of the Korean Society for Railway
    • /
    • v.20 no.2
    • /
    • pp.241-247
    • /
    • 2017
  • Railway bridges with continuously welded rail have a limitation of span length due to track-bridge interaction. In order to overcome this, a sliding slab track system has been developed that comprises with a low-frictional sliding layer between the bridge deck and the track slab to isolate the longitudinal behavior between the bridge and the track. In this study, a real scale track system is prepared to experimentally evaluate the longitudinal frictional behavior. Applied loading rates were 0.2, 1.0, 5.0 and 10mm/min; vertical mass on the track are track slab only, 5,000 and 10,000kg added mass, respectively. Test results showed that the resulting frictional coefficients varied from 0.22 to 0.33. In addition, 10,000 cycle loadings were applied to simulate repetitive sliding to represent 30 years of service life. The frictional coefficient increase was measured and found to be 7% of that of the initial loading stage, which means that the sliding layer is adequate to provide low-frictional behavior for the sliding slab track system. Effects of changes of the frictional coefficient of the sliding layer were analyzed by rail-structure interaction analysis.

Evaluation of the Roadbed Behavior During Tilting-train Operation in Curved Track Using Numerical Analysis (틸팅차량의 곡선부 운행시 수치해석을 이용한 노반거동 평가)

  • Jeon, Sang-Soo;Eum, Gi-Young;Kim, Jae-Min
    • Journal of the Korean Geotechnical Society
    • /
    • v.23 no.6
    • /
    • pp.115-126
    • /
    • 2007
  • The tilting-train is very attractive to the railroad users in the world because it runs with high speed in curved track using pre-existing infrastructure. The tilting-train has a unique allowable speed and mechanism expecially in curved track. Therefore, it should be evaluated in terms of the stability of the train operation and roadbed. In this study, when the tilting-train is being operated with the allowable speed, the behavior of the roadbed is evaluated by examining the settlement and bearing capacity of the roadbed. Additionally, the stability of the roadbed is estimated in the condition of soft roadbed influenced by the weather effects and cyclic train loading. The numerical results show that the roadbed settlements satisfy the allowable settlement when Young's moduli of the upper roadbed and in-situ soil are more than $2,300t/m^2\;and\;3,300t/m^2$, respectively, in the continuous welded rail (CWR) and $3,800t/m^2\;and\;4,600t/m^2$, respectively, in the rail joint.

An Experimental Study of Fastening System on CWR(Continuous Welded Rail) Track Stability (장대레일 궤도의 안정성에 미치는 체결장치의 실험적 연구)

  • Kim, Jung-Hun;Han, Sang-Yun;Lim, Nam-Hyoung;Kang, Young-Jong
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.317-324
    • /
    • 2007
  • Until now, the railway has been constructed using track with jointed rails of relatively short lengths to allow thermal expansion in hot summer months. These joints weaken the track structurally and increase track maintenance cost and power consumption of the running train. The CWR(Continuous Welded Rail) Track is the solution of these drawbacks. Although the CWR track not only reduces the track maintenance cost but also increases the life cycle of track components, the stability of the track is highly affected by change of temperatures and vehicle load. A three dimensional nonlinear analysis which considers rail, fastening system and tie has been performed to understand structural behavior of the CWR track. In this case, the translational and rotational stiffness values of fastening system have not been studied. The fastening system makes ties and rails connect. In this study, the stiffness values of various types of fastening systems which consist of clips, rail-pads and insulators are determined by the experiment. The experimental results of the fastening system are compared with the results of parametric study that is performed to investigate the sensitivity of fastening system on stability of CWR track.

  • PDF

Development of Reliability-Based Optimum Design of High-Speed Railway Bridges Considering Structure-Rail Longitudinal Interaction and Structure-Vehicle Interaction Using Heuristic Decision Method (Heuristic Decision Method를 이용하여 구조물-궤도 종방향 상호작용 및 구조물-차량 상호작용을 고려한 고속철도 교량의 신뢰성 최적설계 기법 개발)

  • Ihm, Yeong-Rok
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.10 no.3
    • /
    • pp.31-38
    • /
    • 2010
  • In this study, it is suggested that it has to reliability-based design methodology with respect to bridge structure-rail longitudinal interaction and bridge structure-vehicle interaction. For the structural analysis, commercial package, ABAQUS, are used for a three-dimensional finite element analysis. The optimization process utilizes a well-known optimizer, ADS(Automated Design Synthesis). Optimization technique is utilized the ALM-BFGS method for global area search and Golden Section Method for 1-D search. In general, ALM-BFGS method don't need the 1-D search, and that algorithm converge a 0.1~0.2 of Push-Off factor. But in this study, value of Push-Off factor is used 90, therefore 1-D search should be needed for effective convergency. That algorithm contains the "heuristic decision method". As a result of optimum design of 2-main steel girder birdge with 5${\times}$(1@50m), design methodology suggested in this study was demonstrated more economic and efficient than existing design and LCC optimization not considering bridge-rail longitudinal interaction and bridge-vehicle interaction.

Optimum Stiffness of the Sleeper Pad on an Open-Deck Steel Railway Bridge using Flexible Multibody Dynamic Analysis (유연다물체동적해석을 이용한 무도상교량 침목패드의 최적 강성 산정)

  • Chae, Sooho;Kim, Minsu;Back, In-Chul;Choi, Sanghyun
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.35 no.2
    • /
    • pp.131-140
    • /
    • 2022
  • Installing Continuous Welded Rail (CWR) is one of the economical ways to resolve the challenges of noise, vibration, and the open-deck steel railway bridge impact, and the SSF method using the interlocking sleeper fastener has recently been developed. In this study, the method employed for determining the optimum vertical stiffness of the sleeper pad installed under the bridge sleeper, which is utilized to adjust the rail height and absorb shock when the train passes when the interlocking sleeper fastener is applied, is presented. To determine the optimal vertical stiffness of the sleeper pad, related existing design codes are reviewed, and, running safety, ride comfort, track safety, and bridge vibration according to the change in the vertical stiffness of the sleeper pad are estimated via flexible multi-body dynamic analysis,. The flexible multi-body dynamic analysis is performed using commercial programs ABAQUS and VI-Rail. The numerical analysis is conducted using the bridge model for a 30m-long plate girder bridge, and the response is calculated when passing ITX Saemaeul and KTX vehicles and freight wagon when the vertical stiffness of the sleeper pad is altered from 7.5 kN/mm to 240 kN/mm. The optimum stiffness of the sleeper pad is calculated as 200 kN/mm under the conditions of the track components applied to the numerical analysis.