THE ROOT CAUSE ANALYSIS PROCESS FOR SCHEDULE DELAY IN CONSTRUCTION (건설공사의 작업지연 원인분석 프로세스)

  • Ji, Kun-Chang;Kim, Chang-Duk;Yu, Jung-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.138-148
    • /
    • 2006
  • In constructing projects, there exist various kinds of work interferences, which cause a delay of the outset and completion of planned schedule because of some attributions, such as variability, uncertainty and complexity, and so schedule delay has been treated as a natural phenomenon. To reduce or prevent the schedule delay, a constant confirmation of schedule delay and a preparation of counter plans for finding out the cause structure of schedule delay should have been done. However, all this time the research has been mostly done on the calculation method or claim cases of schedule delay, and the range of analysis method of the cause structure of schedule delay has been multifarious from industrial views to views of specific work. Moreover, the classifying system and analysis method did not consider the trait, which cause the schedule delay, in constructing projects. For this reason, it is difficult to compare the cause of delay factors of the projects and to understand the effect of schedule delay by each factor. This paper restricts the range of the cause analysis of schedule delay to the field of site management in the projects and divides the cause structure of schedule delay into the cause objects and cause attributes of schedule delay according to the input elements. The system of classifying causes of schedule delay is examined by interviews with experts and questionnaire. Additionally, this paper analyzes the attributes of cause attributes and cause subjects and presents the analysis method and procedure of schedule delay with the application of VSM.

An Analysis on Work Delaying Factors in Apartment Building Construction (공동주택 공사의 작업지연요소 분석)

  • Ahn, Sang-Hyun;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.496-501
    • /
    • 2006
  • Work delay is the one of facts that make the reliability of construction business decrease. Building a causal classification system of work delay and deducing the managemental item for it gives a great competition to the construction industry. It is, however, so rare to study about work delay so far. Therefore, this research analyzed a questionnaire, which is focussing on the public apartment construction, to look into the causal root factors and deduce the work delay factors. Finally, we suggest a major managing point to remove effectively the work delay factors.

  • PDF

THE ROOT CAUSE ANALYSIS METHOD FOR SCHEDULE DELAY IN CONSTRUCTION (건설공사의 작업지연 원인분석방법)

  • Ji, Kun-Chang;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.131-136
    • /
    • 2006
  • In constructing projects, there exist various kinds of work interferences, which cause a delay of the outset and completion of planned schedule because of some attributions, such as variability, uncertainty and complexity. and so schedule delay has been treated as a natural phenomenon. To reduce or prevent the schedule delay, a constant confirmation of schedule delay and a preparation of counter plans for finding out the cause structure of schedule delay should have been done. However, all this time the research has been mostly done on the calculation method or claim cases of schedule delay. Moreover, the analysis method did not consider the trait, which cause the schedule delay, in constructing projects. This paper restricts the range of the cause analysis of schedule delay to the field of site management in the projects and divides the cause structure of schedule delay into the cause objects and cause attributes of schedule delay according to the input elements. The system of classifying causes of schedule delay is examined by interviews with experts and questionnaire. Additionally, this paper analyzes the attributes of cause attributes and cause subjects and presents the analysis method and procedure of schedule delay with the application of VSM.

  • PDF

Cause of Schedule delay-based Constraints Analysis Process (작업지연원인 기반 작업여건분석 체계)

  • Song, Ji-Won;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.637-642
    • /
    • 2007
  • The sum of each work duration are entire period in construction project. Each work occurs to be late, the total period of construction project will delays. Therefore, the total period of construction project will not be delayed if probability of working progress makes higher. Finding each work's constraints performs constraints analysis in process of construction for checking probability of working progress. Grasp work's constraints through the constraints analysis and removes. This research will show preventing delay of consruction project, through constraints analysis process.

  • PDF

An Analysis on Work Delay Factors in Apartment House Construction (공동주택 공사의 작업지연요소 분석)

  • Ahn, Sang-Hyun;Yu, Jung-Ho;Kim, Chang-Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.6
    • /
    • pp.159-166
    • /
    • 2007
  • Work delay is one of the facts that make the reliability of construction projects decrease. Therefore, it is important to classify and prioritize the delay factors. This research analyzed key delay factors in apartment house construction through survey. The results of analysis are as follows. (1) Insufficient work force is the key delay factor in structural and finish work. (2) Improper craft of worker is the key delay factor in electrical work. (3) Incompletion of proceeding work is the key delay factor in mechanical work.

Work Condition Analysis Process for Improving Reliability of Work Plan (작업계획의 신뢰도 향상을 위한 작업여건분석 체계)

  • Song, Ji-Won;Yu, Jung-Ho;Kim, Chang-Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.36-44
    • /
    • 2009
  • The sum of each work duration are entire period in construction project. Each work occurs to be late, the total period of construction project will delays. Therefore, the total period of construction project will not be delayed if probability of work progress makes higher. Finding each work constraints performs constraints analysis in process of construction for checking probability of work progress. Grasp work constraints through the constraints analysis and removes. This research will show preventing delay of construction project, through work condition analysis process.

자동차용 스프링 제조업체의 생산합리화 방안에 관한 사례연구

  • 노인규;김진규
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1992.04b
    • /
    • pp.149-155
    • /
    • 1992
  • 본 사례연구는 자동차용 스프링 제조업체의 생산합리화를 위하여 조립라인에서의 효율적인 조립을 위한 전 생산공정의 평준화 생산 방안에 관한 것이다. 조립라인에서 조립작업의 지연 및 불균형은 그 근본 원인이 애로공정인 열간작업 및 열처리공정에서의 모델별.낱장로트별로 작업공정 구성과 작업처리속도에서 불균형을 이루기 때문이다. 결국 열간작업과 열처리공정이 전공정에서의 생산량과 공정간재고를 통제한다. 위와 같은 문제를 해결하기 위해서는 모기업의 수요를 기점으로하여 필요한 제품을 필요한 양만큼 필요할 때에 공급할 수 있는 마케트인(market in)방식의 인출(pull)시스템을 구축하여야 한다. 따라서 전 생산공정을 크게 압연공정, 열간작업공정, 열처리.조립공정으로 나누어서 용량(capacity)측면에서가 아니라 흐름(flow)측면에서 주문품목에 대하여 모델별.낱장별로 그룹화하고 모델별 조립작업순서와 열처리공정의 투입순서 및 투입량, 열간작업에 대한 작업순서를 결정하여 전체의 생산공정이 평준화 될 수 있는 생산통제방안을 제시한다. 아울러 이 생산통제 방안들의 타당성을 평가하기 위하여 컴퓨터 시뮬레이션을 통한 분석도 행하였다.

  • PDF

크레인 작업의 불확실성을 고려한 AGV 배차

  • Choe, Lee;Park, Tae-Jin;Ryu, Gwang-Ryeol
    • Proceedings of the Korea Inteligent Information System Society Conference
    • /
    • 2007.11a
    • /
    • pp.564-569
    • /
    • 2007
  • 자동화 컨테이너 터미널에서 안벽크레인, AGV(Automated Guided Vehicle)와 같은 하역장비의 작업은 수 많은 요인에 영향을 받으며, 이로 인해 각 장비의 작업시간을 정확하게 추정하는 것은 거의 불가능하다. 작업시간의 불확실성은 AGV 배차를 어렵게 만들고 작업효율을 떨어뜨리는 주요 원인이다. 본 논문에서는 이러한 불확실성에 대처하기 위하여 확률적 시뮬레이션 기반 AGV 배차 알고리즘을 제안한다. 제안 방안은 AGV를 배차할 때, 이후 일정 기간 동안의 AGV작업에 대해 확률적 시뮬레이션을 여러번 반복하여 수행하고 평가 값을 평균함으로써 불확실성의 영향을 줄인다. 확률적 시뮬레이션을 위해 크레인 작업시간의 불확실성을 간단한 확률함수로 모델링하고 그에 따라 크레인 작업시간을 결정한다. 또한 AGV 작업시간을 가감속, 간섭을 고려하여 추정한다. 시뮬레이션 실험을 통해 제안방안을 검증한 결과 안벽크레인의 지연이 감소함을 확인하였다.

  • PDF

박리지연 및 양항비 상승효과를 가진 익형내부 구멍효과 설계 최적화 및 단순화 연구

  • Kim, Yeong-Jin;Choe, In-Jun;Nam, Do-U
    • Proceeding of EDISON Challenge
    • /
    • 2016.03a
    • /
    • pp.518-522
    • /
    • 2016
  • 항공기 운항 중 사고가 가장 많이 발생하는 순간이 이착륙 순간이다. 사고의 원인은 실속(Stall)으로 인한 조종성 상실, 버드 스트라이크 등의 이유들이 있다. 본 연구에서는 항공기 날개에 구멍을 내서 구조적인 변화를 통해 이 착륙 시에 가장 많이 적용되는 받음각인 $10^{\circ}$에서 흐름의 박리가 지연되고, 양항비가 상승되는 효과를 기대하고 $10^{\circ}$이외의 받음각에서 박리가 지연되는지 해석을 진행하였다. 본 연구에서의 최종적 목표는 곡선형태의 구조변화 형상과 이를 실제 항공기에 적용이 가능하도록 제작성과 경제성을 고려하여 단순화 하는 작업을 진행하고 곡선 형태와 같은 효과를 얻고자 해석을 진행하였다. 받음각 $10^{\circ}$에서 해석을 진행한 경우 모든 형상들이 흐름의 박리를 지연시키는 효과를 가져왔다.

  • PDF

Productivity Analysis and Improvement of the System Form Construction in the Apartment Housing Project (공동주택 SYSTEM FORM 공사의 생산성 분석 및 향상방안 제안)

  • Kim Do-Hyeong;Kim Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.3 s.7
    • /
    • pp.101-109
    • /
    • 2001
  • Application of system form is very effective to continuous horizontal or vertical walls of the apartment housing. Though the system forms that are used in the construction field have the advantage of concrete quality improvement and increasing number of usages, there are some problems in reaching early planning scheduling goal due to schedule delay and low productivity. This study is initiated to solve the problem and suggest some improvements searching for reasons that diminish the productivity. A case study was done in apartment construction field where system form was used and the productivity is analyzed by work sampling. Finally, productivity improvements for assembly of the form, internal form and external form are suggested, respectively.