Cause of Schedule delay-based Constraints Analysis Process (작업지연원인 기반 작업여건분석 체계)

  • Song, Ji-Won;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.637-642
    • /
    • 2007
  • The sum of each work duration are entire period in construction project. Each work occurs to be late, the total period of construction project will delays. Therefore, the total period of construction project will not be delayed if probability of working progress makes higher. Finding each work's constraints performs constraints analysis in process of construction for checking probability of working progress. Grasp work's constraints through the constraints analysis and removes. This research will show preventing delay of consruction project, through constraints analysis process.

  • PDF

An Analysis on the Influence of Work Management Type on Work Condition (작업관리방식이 작업여건에 미치는 영향 분석 - 주단위작업관리방식과 일단위작업관리방식을 중심으로 -)

  • Yoon, Byong-Sik;Yu, Jung-Ho;Kim, Chang-Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.5
    • /
    • pp.75-83
    • /
    • 2010
  • Construction industries is a labor intensive industries. According to Korea Productivity Center, most OECD members indicate high labor productivity more than Korea labor productivity in construction industries. First of all, for increasing labor productivity work efficiency and work condition should be managed by administrator in work site. Especially, work condition could be controlled by the management behaviors of administrator in work site such as work management type. This indicates that work management type could influence strongly work condition. But although that work management type could influence work condition is the characteristic of construction work is recongized to many people, the quantitative analysis on the relationship between work condition and work management type is not enough. Therefore the purpose of this study is to analyze the Influence of Work Management Type on Work Condition.

Work Condition Analysis Process for Improving Reliability of Work Plan (작업계획의 신뢰도 향상을 위한 작업여건분석 체계)

  • Song, Ji-Won;Yu, Jung-Ho;Kim, Chang-Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.36-44
    • /
    • 2009
  • The sum of each work duration are entire period in construction project. Each work occurs to be late, the total period of construction project will delays. Therefore, the total period of construction project will not be delayed if probability of work progress makes higher. Finding each work constraints performs constraints analysis in process of construction for checking probability of work progress. Grasp work constraints through the constraints analysis and removes. This research will show preventing delay of construction project, through work condition analysis process.

Working Environment and Improvement Method of VTS Operator (VTS 관제사 근무여건과 개선방안)

  • Kim, Joo-Sung;Jung, Cho-Young;Kim, Kwang-il
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2018.11a
    • /
    • pp.263-264
    • /
    • 2018
  • The quality of service provided by Vessel Traffic Services depends on the tasks characteristics and the work environment of Vessel Traffic Service operators. In this paper, the working conditions of Vessel Traffic Service operators are analyzed in order to propose methods to improve the working environment of Vessel Traffic Services and to provide high quality service through them. The questionnaire survey was conducted for Vessel Traffic Service operators working at 20 Vessel Traffic Service centers. It is expected that it might be used as the basic data for improvement of work environment and organization of Vessel Traffic Service center in the future.

  • PDF

A Study on the Effect of Workplace Innovation on Business Performance and Labor Condition Improvement (작업장 혁신이 경영성과와 근로여건 개선에 미치는 영향)

  • Park, Jin Ah;Ko, Kyoung Han
    • Industry Promotion Research
    • /
    • v.1 no.2
    • /
    • pp.55-61
    • /
    • 2016
  • This study analyzed the effect of workplace innovation on business performance and labor condition improvement. The study results showed that work process standardization and quality control positively affected business performance. Also, downsizing, reducing individual subcontract, expanding non-core business outsourcing positively affected both business performance and labor condition improvement. In addition, labor union's participation moderated the effect of work process innovation on business performance. This study provided implications for analyzing the effect of workplace innovation comprehensively and extending the scope of study to personal employee dimension.

A Study on the Estimation of Proper Construction Cost for Road Pavement Maintenance Work (아스팔트포장 유지보수 적정공사비 산정방안 연구)

  • Oh, JaeHun;Song, TaeSeok;An, BangYul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.6
    • /
    • pp.16-26
    • /
    • 2020
  • Road Pavement Maintenance Work is generated in a variety of different field conditions, and it is difficult to calculate the construction cost because there are no detailed criteria when preparing the estimated construction cost. Unlike new pavements, Road Pavement Maintenance has to be constructed with operating vehicles, and there are many differences in productivity depending on urban areas, limited work hours, night-time, construction area, etc. To compensate for this, the standard for calculation of construction cost provides additional charges for the number of lanes, residential areas, working hours, and night work, but it applied differently depending on construction officials. In this study, construction cost estimation standards that can properly reflect the conditions of the site was investigated for major types of Road Pavement Maintenance work. The site was investigated and analyzed mainly for many construction sites with 'overlay of asphalt after cutting', 'restore surface', 'repair of pavement', and 'recovery of roadway'. The criteria for the application of construction volume separately according to working hours, public places, and land area including extra charges for basic downtown and residential area. The hours of operation were divided into three types(7 hours, 5 hours, 3 hours) excluding movement and preparation time, and each type provided a coefficient for dividing the area of the construction site into five types. The construction cost calculation method based on the construction purpose is site conditions is proposed accordingly, and it is deemed that a plan for the designer to calculate the construction cost has been prepared in consideration of the site conditions.

Installation Scheduling for the Development of Southwest Coast 2.5GW Offshore Wind Farm (서남해안 2.5GW 해상풍력단지 조성을 위한 설치 일정계획)

  • Ko, Hyun-Jeung
    • Journal of Korea Port Economic Association
    • /
    • v.33 no.2
    • /
    • pp.83-96
    • /
    • 2017
  • As a way to address global warming, among the renewable energy sources, there have been heavy investments worldwide for the development of offshore wind farms. However, such development has a drawback: investment costs are higher than those for onshore wind farms due to required operations such as offshore transportation and installation. In particular, delays in installation due to adverse maritime weather conditions are factors that affect the economics of offshore wind farms' operation. Therefore, in this study, we analyze the optimal schedule of the construction of an offshore wind farm from a macro perspective by considering the weather conditions in Korea. For this purpose, we develop a mathematical model and apply it to a 2.5 GW offshore wind farm project on the southwestern coast of the country. We use data from the Korea Meteorological Agency for maritime weather conditions and attempt to reflect the actual input data based on precedent cases overseas. The results show that it takes 6 months to install 35 offshore wind turbines. More specifically, it is pointed out that it is possible to minimize costs by not working in winter.

FIELD ASSEMBLY CONNECTOR FOR OPTICAL CABLE SPLICING (가입자 광선로망용 현장조립형 광커넥터 기술)

  • Kim, Bo-Gyum;Chol, Young-Bok;Oh, Ho-Seok;Park, Tae-Dong
    • 한국정보통신설비학회:학술대회논문집
    • /
    • 2005.08a
    • /
    • pp.170-173
    • /
    • 2005
  • FTTH 사업의 본격화에 따른 가입자 광선로망에서의 인입망 광선로 성단작업이 기존의 융착접속으로 광커넥터화 하기에는 현장여건상 많은 어려움이 따른다. 특히 전주위에서의 작업으로 위험성과 작업의 난이도로 인하여 접속시간의 과다한 소요 및 방법이 까다로우며 고가의 접속공구를 필요로 하였다. 이에 본고에서는 현장에서 조립하여 사용할 수 있는 광커넥터의 기술에 대하여 살펴보고 현재 상용화되고 있는 현장조립형 광커넥터의 품질 분석을 수행하였고 작업성 및 품질을 개선시킬 수 있는 방안을 도출하였다.

  • PDF

A Case Study on Efficiency Analysis of Cable Logging Operation in Korea (국내 가선집재 작업의 효율성 분석에 관한 사례연구)

  • You, JoungWon;Han, Hee;Chung, JooSang
    • Journal of agriculture & life science
    • /
    • v.53 no.6
    • /
    • pp.35-44
    • /
    • 2019
  • The objectives of this study were to identify engineering problems in the design and installation of cable logging operation that affects productivity through case study of actual logging sites, and to analyze associated productivity loss and increased cost. As a result of the study, when the geographic conditions and engineering safety of the site are not sufficiently considered, deflection of the cable line can not be secured. Hourly productivity of the operation decreased to 65% and the logging cost increased by more than two times compared to the productive yarding operation, which lowered overall efficiency of the operation. Thus, it is required to spread filed technologies that minimize unnecessary production cost incurred due to the in-efficient logging operations as well as secure work safety and efficiency to expand cable logging operation throughout the country.

A Case Study on the Human Error Analysis of Forklift Operations in a Small Enterprise (소규모 사업장의 지게차 작업에 관한 휴먼에러 분석 사례 연구)

  • Ha, Gyu Cheol;Park, Jungchul
    • Journal of the Korea Convergence Society
    • /
    • v.12 no.5
    • /
    • pp.207-215
    • /
    • 2021
  • A forklift is an industrial vehicle with a power-operated fork for lifting and moving heavy loads over short distances. A significant number of accidents are caused by forklifts every year. Most of them are known to be caused by the unsafe acts of workers. However, only a few studies have focused on the risks of forklift work from the perspective of human error. In addition, various methods have been developed to analyze the risk of human error, while it is hard to find studies that directly compare the effectiveness or strengths/weaknesses of those methods. This study aims to analyze risk factors related to unsafe behavior in forklift operations using two representative human error analysis techniques, i.e., .SHERPA and HE-HAZOP, and compare their advantages and disadvantages. The analysis was performed on three main forklift operations ('unloading from the truck', 'moving and loading into the storage', and 'loading on the truck'). As a result, 118 errors and 34 remedial measures were derived by SHERPA. Through HAZOP, 139 errors and 54 measures were derived. The two techniques were compared in terms of the number of results and the method of deriving errors and remedial measures, cause analysis, and risk assessment. This study might be used to reduce human error related disasters in workplaces using forklifts. In order to provide a guide for choosing an appropriate analysis method, more comparative studies on different techniques involving wide range of tasks are needed in the future.